基本信息:
- 专利标题: 日前梯级水电联合优化方法及装置
- 专利标题(英):Day-ahead cascade water and electricity combined optimization method and device
- 申请号:CN201811508957.1 申请日:2018-12-10
- 公开(公告)号:CN110110878A 公开(公告)日:2019-08-09
- 发明人: 万筱钟 , 廖春梅 , 郭少青 , 匡洪辉
- 申请人: 国家电网公司西北分部 , 北京清大科越股份有限公司
- 申请人地址: 陕西省西安市碑林区环城东路中段50号西北电网公司办公楼
- 专利权人: 国家电网公司西北分部,北京清大科越股份有限公司
- 当前专利权人: 国家电网公司西北分部,北京清大科越股份有限公司
- 当前专利权人地址: 陕西省西安市碑林区环城东路中段50号西北电网公司办公楼
- 代理机构: 北京细软智谷知识产权代理有限责任公司
- 代理人: 赵芳
- 主分类号: G06Q10/04
- IPC分类号: G06Q10/04 ; G06Q50/06
The invention relates to the technical field of cascade water and electricity combined optimization, in particular to a day-ahead cascade water and electricity combined optimization method and device.The method comprises the steps of obtaining a first model based on annual adjustment and hydropower station control as target modeling; based on the seasonal regulation hydropower station control target modeling, obtaining a second model; based on daily regulation hydropower station control target modeling, obtaining a third model; and modeling based on the first model, the first model and the first model by taking cascade hydropower station joint optimization control as a target to obtain a fourth model. Carrying out cascade upstream and downstream flow coordination constraint based on a fourth model; performing single hydropower station operation characteristic constraint based on a fourth model; performing cascade hydropower station operation characteristic constraint based on a fourthmodel; and solving the fourth model after the cascade upstream and downstream flow coordination constraint, the single hydropower station operation characteristic constraint and the cascade hydropower station operation characteristic constraint to obtain a cascade hydropower combined optimization scheme.
公开/授权文献:
- CN110110878B 日前梯级水电联合优化方法及装置 公开/授权日:2022-11-18