![储层选择性调堵的方法](/CN/2017/1/160/images/201710804282.jpg)
基本信息:
- 专利标题: 储层选择性调堵的方法
- 申请号:CN201710804282.4 申请日:2017-09-08
- 公开(公告)号:CN107654208B 公开(公告)日:2019-08-06
- 发明人: 于晓聪 , 安岩 , 马昌明 , 阚长宾 , 刘爽 , 孟菊 , 程海清 , 王伟伟 , 张鸿 , 卢丽丝
- 申请人: 中国石油天然气股份有限公司
- 申请人地址: 北京市东城区东直门北大街9号
- 专利权人: 中国石油天然气股份有限公司
- 当前专利权人: 中国石油天然气股份有限公司
- 当前专利权人地址: 北京市东城区东直门北大街9号
- 代理机构: 北京三友知识产权代理有限公司
- 代理人: 党晓林; 张博
- 主分类号: E21B33/13
- IPC分类号: E21B33/13 ; E21B43/27 ; E21B37/06 ; E21B21/00 ; E21B43/14
The invention provides a method for selective profile control and water shutoff of a reservoir stratum. The method includes the following steps of obtaining a geological connected graph of an oil reservoir; determining a first target oil layer and to-be-selected oil layers according to the geological connected graph and a first preset rule; picking the standard gas injection intensity of the oil layers, obtaining oil layer parameters in the to-be-selected oil layers, and obtaining the gas absorption percentages of the to-be-selected oil layers according to the oil layer parameters; determiningthe gas injection intensities of the to-be-selected oil layers according to the gas absorption percentages of the to-be-selected oil layers; calculating the difference values between the gas injection intensities of the to-be-selected oil layers and the standard gas injection intensity of the oil layers; obtaining specific values by comparing the difference values with the standard gas injectionintensity of the oil layers; determining a second target oil layer and a third target oil layer according to the specific values and a second preset rule; blocking the third target oil layer and injecting a temporary plugging agent after acidizing and fracturing the first target oil layer and the second target oil layer; and after temporary plugging of the first target oil layer and the second target oil layer, unblocking the third target oil layer and injecting a profile control and water shutoff agent into the third target oil layer.
公开/授权文献:
- CN107654208A 储层选择性调堵的方法 公开/授权日:2018-02-02
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21B | 土层或岩石的钻进;从井中开采油、气、水、可溶解或可熔化物质或矿物泥浆 |
------E21B33/00 | 井眼或井的密封或封隔 |
--------E21B33/02 | .地面密封或封隔 |
----------E21B33/13 | ..用于封堵井眼、裂隙或类似情况的注水泥方法或装置 |