专利标题:
一种三峡水库汛期出库沙峰含沙量的快速预测方法
-
- 专利标题(英):Rapid predicting method for sand content of reservoir-exiting sand peak of Three Gorges reservoir in flood period
-
申请号:CN201610804942.4
申请日:2016-09-06
-
公开(公告)号:CN107558432A
公开(公告)日:2018-01-09
-
发明人:
黄仁勇
, 崔占峰
, 葛华
, 赵瑾琼
, 毛冰
, 申康
, 邓春艳
, 元媛
, 王敏
, 蔺秋生
, 胡德超
, 范北林
, 张细兵
, 张杰
, 宫平
-
申请人:
长江水利委员会长江科学院
-
申请人地址:
湖北省武汉市黄浦大街23号
-
专利权人:
长江水利委员会长江科学院
-
当前专利权人:
长江水利委员会长江科学院
-
当前专利权人地址:
湖北省武汉市黄浦大街23号
-
代理机构:
武汉楚天专利事务所
-
代理人:
胡盛登
-
主分类号:
E02B1/00
-
IPC分类号:
E02B1/00
摘要:
本发明公开了一种三峡水库汛期出库沙峰含沙量的快速预测方法,步骤1,选定库尾干流控制性水文站为沙峰入库站,选定坝下游最近的干流控制性水文站为沙峰出库站;步骤2,收集沙峰入库站日均沙峰含沙量S入、沙峰入库站出现沙峰当日坝前日均水位对应的滞洪库容V起始、沙峰入库站出现沙峰当日的沙峰出库站日均流量Q出1,沙峰出库日沙峰出库站日均流量Q沙根据实际情况提前给定一个假设值;步骤3,根据公式计算得到水库沙峰出库率S出/S入;步骤4,根据S出/S入和S入计算得到水库出库沙峰含沙量S出。本发明中的出库沙峰含沙量快速预测方法无需河道地形、入出库水沙过程、坝前水位过程和水沙输移数学模型,所需资料少且易于获取,计算简便,精度较高。
摘要(英):
The invention discloses a rapid predicting method for the sand content of a reservoir-exiting sand peak of the Three Gorges reservoir in the flood period. The rapid predicting method comprises the steps that firstly, a reservoir tail main stream control hydrometric station is selected as a sand peak reservoir-entering station, and a nearest main stream control hydrometric station in the downstreamposition of a dam is selected as a sand peak reservoir-exiting station; secondly, the average daily sand peak sand content S of the sand peak reservoir-entering station, the flood detention reservoir capacity V corresponding to the average daily in-front-of-dam water level on the day when a sand peak appears in the sand peak reservoir-entering station, and the average daily flow Q of the sand peak reservoir-exiting station on the day when the sand peak appears in the sand peak reservoir-entering station are collected, and a supposed value of the average daily flow Q of the sand peak reservoir-exiting station on the sand peak reservoir-exiting day is given in advance according to the actual condition; thirdly, the sand peak reservoir-exiting ratio S/S of the reservoir is calculated according to the formula (please see the specifications for the formula); and fourthly, the sand content S of the reservoir-exiting sand peak of the reservoir is calculated according to S/S and S. According to the rapid predicting method of the sand content of the reservoir-exiting sand peak, the river way terrain, the water and sand reservoir-entering and reservoir-exiting process, the in-front-of-dam water level process and a water and sand transportation mathematical model are not needed, required information is less and easy to obtain, calculation is easy and convenient, and the accuracy is high.