基本信息:
- 专利标题: 隧道仰拱下保温中心沟台阶式检查井结构
- 专利标题(英):Step type inspection well structure for thermal insulation center trench below tunnel inverted arch
- 申请号:CN201710545300.1 申请日:2017-07-06
- 公开(公告)号:CN107120140A 公开(公告)日:2017-09-01
- 发明人: 马志富 , 杨昌贤 , 段程鹏 , 王浩 , 李光京 , 安玉红 , 刘毅 , 曲耀慧
- 申请人: 中国铁路设计集团有限公司
- 申请人地址: 天津市河北区中山路10号
- 专利权人: 中国铁路设计集团有限公司
- 当前专利权人: 中国铁路设计集团有限公司
- 当前专利权人地址: 天津市河北区中山路10号
- 代理机构: 天津市宗欣专利商标代理有限公司
- 代理人: 王龑
- 主分类号: E21F16/02
- IPC分类号: E21F16/02 ; E03F5/02
The invention discloses a step type inspection well structure for a thermal insulation center trench below a tunnel inverted arch. The step type inspection well structure comprises a deep-buried center trench thermal-insulation inspection well and a deep-buried tunnel center trench, wherein the deep-buried center trench thermal-insulation inspection well is equipped with lateral step ladders from top to bottom in the longitudinal direction of a path, the lower ends of the lateral step ladders are connected with the deep-buried center trench thermal-insulation inspection well through maintenance platforms, and open holes capable of allowing implementation of inspection and maintenance work for the deep-buried tunnel center trench through the deep-buried center trench thermal-insulation inspection well are formed in the positions, corresponding to the maintenance platforms, of the deep-buried center trench thermal-insulation inspection well; cover plates are arranged at the tops of the lateral step ladders for closing, and an oil-immersed wood cover plate and a thermal-insulation layer are arranged in the position, having equal altitude with the top surfaces of the maintenance platforms, of the deep-buried center trench thermal-insulation inspection well for closing and thermal insulation. According to the step type inspection well structure for the thermal insulation center trench below the tunnel inverted arch, concrete project quantity of the tunnel bottom structure is reduced, cold-proof and thermal-insulation capacity of a tunnel drainage system is improved, and operation difficulties in inspection and maintenance of deep-buried drainage facilities of the tunnel are reduced, so that the operation safety of the tunnel is guaranteed.
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21F | 矿井或隧道中或其自身的安全装置,运输、充填、救护、通风或排水 |
------E21F15/00 | 井下采区充入充填物的方法或装置 |
--------E21F16/02 | .隧道的 |