基本信息:
- 专利标题: 一种用于临近场区间大型钢模整体转场的施工方法
- 专利标题(英):Overall transition construction method for large-size steel mould between adjacent field regions
- 申请号:CN201610122662.5 申请日:2016-03-04
- 公开(公告)号:CN105781108A 公开(公告)日:2016-07-20
- 发明人: 王海龙 , 万超 , 李国江 , 王东伟 , 张毅 , 龚学栋 , 谢海金 , 李勇 , 伍晓峰 , 张小红 , 陈旺 , 赵康林 , 卢柯良 , 牛博 , 乐治胜
- 申请人: 中铁隧道集团二处有限公司
- 申请人地址: 河北省石家庄市三河市燕郊开发区学院路
- 专利权人: 中铁隧道集团二处有限公司
- 当前专利权人: 中铁隧道集团二处有限公司
- 当前专利权人地址: 河北省石家庄市三河市燕郊开发区学院路
- 代理机构: 南昌市平凡知识产权代理事务所
- 代理人: 夏材祥
- 主分类号: E04G21/00
- IPC分类号: E04G21/00 ; E02D29/073 ; B66C13/08
The invention provides an overall transition construction method for a large-size steel mould between adjacent field regions. The overall transition construction method comprises the steps that by analyzing the weight, the size, the walking route road conditions and the like of a lifted steel mould trolley, a walking track frame, a lifting tool, a hauling fixed trolley frame and the like of the steel mould trolley are reasonably designed, and a lifting device, a transfer device and other mechanical devices are reasonably matched; and overall transition construction of the large-size steel mould trolley is completed in a divided and segmented mode by adopting the way that the track frame is discharged out of a pipe section cavity body, overall lifting is conducted through a large-tonnage crawler crane, and a heavy low flat plate is hauled through a semi trailer. According to the overall transition construction method for the large-size steel mould between the adjacent field regions, the track frame, a lifting frame and a bearing beam bracket which are used are reasonably designed and are convenient to install and detach at the construction site; the lifting device and a transportation device are reasonably arranged, a lifting transportation route is planned in advance, and the integrity of the steel mould trolley is ensured; the processes are effectively connected to form line production, and loads of workers are sharply reduced; the interference factors are few, the transition speed is high, and the construction period requirement is met; safe and civilized construction is ensured; and the overall transition construction method is suitable for large-scale application and popularization.
公开/授权文献:
- CN105781108B 一种用于临近场区间大型钢模台车整体转场的施工方法 公开/授权日:2017-11-28