
基本信息:
- 专利标题: 模拟工程中土体承受荷载情况下进行干湿循环的实现方法
- 专利标题(英):Implementation method of conducting dry-wet cycle by simulating soil body bearing load in engineering
- 申请号:CN201510598878.4 申请日:2015-09-19
- 公开(公告)号:CN105203735A 公开(公告)日:2015-12-30
- 发明人: 吕海波 , 董均贵 , 徐云山 , 季春生 , 蒋熠 , 成果灯 , 常红帅 , 刘丽 , 王宗 , 王勇
- 申请人: 桂林理工大学
- 申请人地址: 广西壮族自治区桂林市建干路12号
- 专利权人: 桂林理工大学
- 当前专利权人: 桂林理工大学
- 当前专利权人地址: 广西壮族自治区桂林市建干路12号
- 主分类号: G01N33/24
- IPC分类号: G01N33/24 ; G01N5/04 ; G01N5/02
The invention discloses an implementation method of conducting a dry-wet cycle by simulating a soil body bearing load in engineering. A device is arranged for conducting the dry-wet cycle by simulating the soil body bearing load in engineering, wherein the device comprises nuts, a fixing ring, vertical rods, a lower bottom plate, lower bottom plate drainage holes, a cutting ring, a criss cross arris, an upper cover plate and upper cover plate drainage holes, a thread adheres to each vertical rod in the whole length, and the vertical rods are fixedly connected with the lower bottom plate; the upper end of the criss cross arris on the upper cover plate is one centimeter larger than the outer diameter of the fixing ring; the inner diameter of the fixing ring is slightly larger than the outer diameter of the cutting ring, so that the cutting ring is convenient to place therein, four vertical grooves are formed in diagonal positions of the ring wall of the fixing ring, an inner thread of each vertical groove is occluded with the thread of the corresponding vertical rod, and an inner thread of each nut is occluded with the thread of the corresponding vertical rod. By means of the device, the purpose of conducting soil body dry-wet cycle tests under the condition that the moisture content is controlled accurately is achieved. The device is simple and cheap in material, easy and convenient to operate and easy to grasp, the stress condition simulation is close to the engineering practice, and engineering application is facilitated.
公开/授权文献:
- CN105203735B 模拟工程中土体承受荷载情况下进行干湿循环的实现方法 公开/授权日:2017-07-04
IPC结构图谱:
G | 物理 |
--G01 | 测量;测试 |
----G01N | 借助于测定材料的化学或物理性质来测试或分析材料 |
------G01N33/00 | 利用不包括在G01N1/00至G01N31/00组中的特殊方法来研究或分析材料 |
--------G01N33/24 | .地面材料 |