
基本信息:
- 专利标题: 水电站发电出力方案制作与最优负荷分配耦合建模方法
- 专利标题(英):Coupling modeling method for hydropower station power generated output scheme making and optimal load distribution
- 申请号:CN201310601268.6 申请日:2013-11-22
- 公开(公告)号:CN103745023A 公开(公告)日:2014-04-23
- 发明人: 周建中 , 肖舸 , 莫莉 , 陈建国 , 严冬 , 李晖 , 张睿 , 陈忠贤 , 闫宝伟 , 刘志武 , 欧阳硕 , 张慧 , 王学敏 , 李鹏 , 王超 , 梁君 , 李超顺 , 阮燕云 , 叶磊 , 吴江 , 李纯龙 , 卢鹏 , 袁柳 , 朱双 , 张华杰 , 廖想 , 孟长青 , 谢蒙飞 , 吉鹏 , 丁小玲 , 张海荣 , 王婷婷 , 卢韦伟 , 江兴稳 , 王华为 , 牛广利 , 张德发
- 申请人: 华中科技大学 , 中国长江三峡集团公司
- 申请人地址: 湖北省武汉市洪山区珞喻路1037号
- 专利权人: 华中科技大学,中国长江三峡集团公司
- 当前专利权人: 华中科技大学,中国长江三峡集团公司
- 当前专利权人地址: 湖北省武汉市洪山区珞喻路1037号
- 代理机构: 北京市盛峰律师事务所
- 代理人: 赵建刚
- 主分类号: G06F17/50
- IPC分类号: G06F17/50 ; G06Q50/06
The invention provides a coupling modeling method for hydropower station generated output scheme making and optimal load distribution. The method includes the steps that a hydropower station generated output scheme model is established with the maximum peak-load regulating capacity benefit as the target, and a in-plant set load optimal distribution model is established with the minimum water consumption as the target; the hydropower station generated output scheme model is solved, so that a hydropower station initial generated output scheme is obtained; the hydropower station initial generated output scheme serves as input of the in-plant set load optimal distribution model, simulation calculation is performed on the in-plant set load optimal distribution model, algorithm loop iteration and model trace netting correction are performed on the hydropower station initial generated output scheme through an integrated self-adapting adjustment mode, and coupled output is a final hydropower station generated output scheme. Integrated seamless coupling operation of hydropower station generated output scheme making and in-plant set load optimal distribution is achieved, wherein the hydropower station generated output scheme has the self-adapting adjustment characteristic, and the fine hydropower station generated output scheme is obtained under the condition that in-plant set load optimal distribution is met.
公开/授权文献:
- CN103745023B 水电站发电出力方案制作与最优负荷分配耦合建模方法 公开/授权日:2015-08-12