
基本信息:
- 专利标题: 组合式夹头滑车
- 专利标题(英):Combined chuck pulley
- 申请号:CN201310232531.9 申请日:2013-06-13
- 公开(公告)号:CN103337807A 公开(公告)日:2013-10-02
- 发明人: 王杰 , 张坤义 , 陈宏学 , 季斌 , 邹俊 , 童庆望
- 申请人: 国家电网公司 , 湖北省送变电工程公司
- 申请人地址: 北京市西城区西长安街86号
- 专利权人: 国家电网公司,湖北省送变电工程公司
- 当前专利权人: 国家电网公司,湖北省送变电工程公司
- 当前专利权人地址: 北京市西城区西长安街86号
- 代理机构: 北京中北知识产权代理有限公司
- 代理人: 段秋玲
- 主分类号: H02G1/02
- IPC分类号: H02G1/02
The invention is applicable to the field of mounting auxiliary tools used on an power transmission line and provides a combined chuck pulley. The combined chuck pulley comprises a chuck and a pulley hung below the chuck, wherein the chuck comprises upper and lower clamping plates; an upper wire clamping block fixed on the upper clamping plate and a lower wire clamping block fixed on the lower clamping plate are arranged between the upper clamping plate and the lower clamping plate; trunkings matched with the thickness of a lead are formed in the upper wire clamping block and the lower wire clamping block; the upper clamping plate and the lower clamping plate are fixed into a whole through a fixing device; the pulley is hung below the lower clamping plate; the chuck can clamp the lead tightly. Through the adoption of the combined chuck pulley, an anchor line pulley block for tightening lines can be dragged to an appointed point quickly to anchor lines, so that the workload of constructors and the aloft work safety risk are reduced, and the uncertain safety risk caused by use of a Deenyma rope is avoided. The combined chuck pulley has higher stability and safety.
公开/授权文献:
- CN103337807B 组合式夹头滑车 公开/授权日:2016-03-02
IPC结构图谱:
H | 电学 |
--H02 | 发电、变电或配电 |
----H02G | 电缆或电线的安装,或光电组合电缆或电线的安装 |
------H02G1/00 | 专用于安装、维护、修理或拆卸电缆或电线的方法或设备 |
--------H02G1/02 | .用于架空线路或电缆的 |