- 专利标题: 混凝土自锚式悬索桥吊索少循环分级张拉施工方法
- 专利标题(英):Few-circulation sling graded tension construction method of concrete self-anchored suspension bridge
- 申请号:CN201210486189.0 申请日:2012-11-26
- 公开(公告)号:CN103334378A 公开(公告)日:2013-10-02
- 发明人: 侯宇飞 , 牛子民 , 赵飞
- 申请人: 中铁四局集团第二工程有限公司
- 申请人地址: 江苏省苏州市相城经济开发区蠡塘河路9号
- 专利权人: 中铁四局集团第二工程有限公司
- 当前专利权人: 中铁四局集团第二工程有限公司
- 当前专利权人地址: 江苏省苏州市相城经济开发区蠡塘河路9号
- 代理机构: 南京众联专利代理有限公司
- 代理人: 周新亚
- 主分类号: E01D21/00
- IPC分类号: E01D21/00
The invention discloses a few-circulation sling graded tension construction method of a concrete self-anchored suspension bridge. Sling tension adopts few-circulation graded tension control; grading refers to that each sling is tensioned in three stages; sling force of an ideal sling is P, and then the tension is conducted in three stages, namely 2/4P, 3/4P and P; and few-circulation refers to that the 74 slings of the whole bridge are tensioned in three batches totally; a sling tension facility and a main sling saddle pushing facility are required to be designed and constructed before tension construction; the sling tension facility comprises tension arm braces, tension jacks, tension nuts, and tension extension bars; and a counterforce rack is the key device in the main sling saddle pushing construction. With the adoption of the few-circulation sling graded tension construction method of the concrete self-anchored suspension bridge, the time of sling tension is reduced to 3; the construction method has the advantages that (1) the times of the repeated sling tension and cable saddle pushing are reduced; (2) a construction safety risk is reduced; (3) a construction period is shortened; (4) the occupation of project department personnel and machine resources is reduced; and (5) the construction cost is lowered.
公开/授权文献:
- CN103334378B 混凝土自锚式悬索桥吊索少循环分级张拉施工方法 公开/授权日:2015-11-18
IPC结构图谱:
E | 固定建筑物 |
--E01 | 道路、铁路或桥梁的建筑 |
----E01D | 桥梁 |
------E01D19/00 | 桥梁结构建筑细部 |
--------E01D21/00 | .专用于架设或装配桥梁的方法或设备 |