![斜拉索软、硬组合三级牵引工艺及连接装置](/CN/2007/1/33/images/200710169053.jpg)
基本信息:
- 专利标题: 斜拉索软、硬组合三级牵引工艺及连接装置
- 专利标题(英):Soft and hard composite three-level traction technique for stay cables and connecting device thereof
- 申请号:CN200710169053.6 申请日:2007-12-27
- 公开(公告)号:CN100580182C 公开(公告)日:2010-01-13
- 发明人: 张鸿 , 刘先鹏 , 罗承斌 , 肖文福 , 邓惠斌 , 饶华容 , 武向东
- 申请人: 中交第二航务工程局有限公司
- 申请人地址: 湖北省武汉市江汉区南京路16号
- 专利权人: 中交第二航务工程局有限公司
- 当前专利权人: 中交第二航务工程局有限公司,武汉二航路桥特种工程有限责任公司
- 当前专利权人地址: 湖北省武汉市江汉区南京路16号
- 代理机构: 武汉开元知识产权代理有限公司
- 代理人: 俞鸿
- 主分类号: E01D21/00
- IPC分类号: E01D21/00 ; E01D11/04
The invention discloses an inclined cable soft and hard combination three-stage traction process and a connecting device. After an inclined cable is hung at the tower end, a hard traction device stretching rod is connected on the anchor head of the beam end of the inclined cable, to operate the first stage traction of a winch; after the anchor head of the beam end of the inclined cable reaches the hanging shifting angle of the beam end of the inclined cable and a sling is adjusted, the second stage traction is operated to adjust the hanging angel of the beam end of the inclined cable till the stretching rod is anchored; lastly, the third stage traction is operated. The soft traction and hard traction combination construction method of the invention comprises the following steps: a soft traction steel strand is connected on the stretching rod through a soft traction connecting sleeve, the other end of the stretching rod is connected with the anchor head of the inclined cable through a diameter changing head, and the hard traction is operated consecutively after the soft traction is ended. The invention has the advantages that the operation is simple and secure, the working efficiency is high, and the inclined cable soft and hard combination three-stage traction process is the technical innovation of the inclined cable construction process. A traction connecting device matched with the traction process is staged and collocated according to the traction force, the structure is simple, reasonable, simple and effective, and the installation is convenient.
公开/授权文献:
- CN101195988A 斜拉索软、硬组合三级牵引工艺及连接装置 公开/授权日:2008-06-11
IPC结构图谱:
E | 固定建筑物 |
--E01 | 道路、铁路或桥梁的建筑 |
----E01D | 桥梁 |
------E01D19/00 | 桥梁结构建筑细部 |
--------E01D21/00 | .专用于架设或装配桥梁的方法或设备 |