会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明申请
    • METHOD OF INSTALLING AN ELECTRICALLY-HEATABLE SUBSEA FLOWLINE AND ELECTRICALLY -HEATABLE SUBSEA FLOWLINE THEREOF
    • 安装电热衬套流水线及其电动吸收式锅炉的方法
    • WO2016162447A1
    • 2016-10-13
    • PCT/EP2016/057673
    • 2016-04-07
    • SUBSEA 7 NORWAY AS
    • HOYVIK, Eskil
    • F16L1/16E21B43/01E21B17/10F16L1/20F16L1/235F16L53/00H01B7/04
    • F16L1/16F16L1/207F16L1/235F16L53/37F16L53/38H02G9/12
    • A method of installing an electrically-heatable subsea flowline (16) comprises launching the flowline (16) with at least one electric power cable (28, 30) attached in piggybacked relation. After landing the flowline (16) with the piggybacked cable (28, 30) on the seabed, a free end portion of the, or each, cable (28, 30) having a length greater than the water depth is released from the flowline. This allows a free end of the, or each, cable (28,30) to be recovered to the surface to be spliced there to one or more power supply conductors. After lowering the, or each, cable (28, 30) and the, or each, connected conductor beneath the surface, the free end portion of at least one cable is reattached to the flowline (16) on the seabed in piggybacked relation. To perform the method, a subsea flowline assembly comprises subsea-releasable fastenings (66) spaced along the cable (28, 30) and the flowline (16) to attach at least an end portion of the cable (28, 30) releasably to the flowline (16).
    • 一种安装电可加热海底流线(16)的方法包括用连接在背负关系上的至少一根电力电缆(28,30)发射流线(16)。 在带有捎带的电缆(28,30)的流线(16)上沉入海底之后,具有大于水深的长度的电缆(28,30)或每个电缆(28,30)的自由端部从流线释放。 这允许电缆(28,30)的每个电缆的自由端被恢复到要被接合到一个或多个电源导体的表面。 在将电缆(28,30)或每个连接的导体下降到表面下方之前,至少一根电缆的自由端部以背负关系重新连接到海床上的流线(16)。 为了执行该方法,海底流线组件包括沿着电缆(28,30)间隔开的海上可释放的紧固件(66)和流动线(16),以将电缆(28,30)的至少一个端部可释放地附接到 流线(16)。
    • 9. 发明申请
    • SYSTEM AND METHOD FOR LAYING AN UNDERWATER PIPELINE ON A BED OF A BODY OF WATER
    • 用于在水体上铺设水下管道的系统和方法
    • WO2016046805A1
    • 2016-03-31
    • PCT/IB2015/057397
    • 2015-09-25
    • SAIPEM S.P.A.
    • LAZZARIN, DiegoMAMELI, Alessio
    • F16L1/16
    • E02F5/104E02F5/00E02F5/04E02F5/109E02F5/14E02F9/00E02F9/2866F16L1/16F16L1/163
    • A system (1) for laying an underwater pipeline (2) on a bed (3) of a body of water (4) has a construction site (11) to form a string (8) of an underwater pipeline (2), the string (8) being defined by a curved portion (9) shaped substantially like a portion of the bed (3) of the body of water (4) characterized by an abrupt change in slope; at least two vessels (14) to transfer, in the body of water (4), the string (8) from the construction site (11) to a laying site (13) in the body of water (4) and substantially on the vertical of a path (5) along which to lay the string (8); and a plurality of floating devices (15) configured to be coupled to the string (8) and so as to selectively support and sink the string (8) in the body of water, and progressively lay the string (8) along the path (5) on the bed (3) of the body of water (4).
    • 一种用于在水体(4)的床(3)上铺设水下管线(2)的系统(1)具有施工现场(11)以形成水下管线(2)的绳(8), 绳(8)由基本上类似于水体(4)的床(3)的一部分形成的弯曲部分(9)限定,其特征在于斜坡的突然变化; 至少两个船舶(14)将水(4)的主体(8)从施工现场(11)转移到水体(4)中的铺设位置(13),并且基本上在 沿着该线(8)放置绳子(8)的路径(5)的垂直线; 以及多个浮动装置(15),其被配置为联接到所述绳索(8)并且以便选择性地支撑和吸收所述绳索(8)在水体中,并且逐渐地沿着所述路径(8) 5)在床身(3)上的水体(4)。