会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明申请
    • PILE DRIVER AND METHOD OF DRIVING A PILE INTO AN UNDERWATER BED
    • 桩驱动器和将桩驱动到水下床的方法
    • WO2018052286A1
    • 2018-03-22
    • PCT/NL2017/050585
    • 2017-09-07
    • VIZIONZ HOLDING B.V.
    • ANGELOV, Zdravko
    • E02D7/02E02D7/12E02D13/04
    • The present invention relates to a pile driver, configured to drive a pile into an underwater bed, comprising a floatable body with a pile guide configured to guide said pile in a downward direction, and an actuator that is fixed to the floatable body and that is configured to drive the pile from the floatable body into the underwater bed. The invention furthermore relates to a method of driving a pile into an underwater bed, comprising the steps of: - positioning a floatable body; - arranging a pile in a pile guide configured to guide said pile in a downward direction; and - driving said pile from the floatable body into the underwater bed by an actuator that is fixed to the floatable body.
    • 本发明涉及一种打桩机,其构造成将桩驱动到水下床中,该打桩机包括具有构造成沿向下方向引导所述桩的桩引导件的可浮动主体以及致动器,所述致动器 固定在可漂浮体上并且被配置成将来自可漂浮体的绒头驱动到水下床中。 本发明还涉及一种将桩驱动到水下床中的方法,包括以下步骤: - 定位可漂浮体; - 将桩放置在桩引导件中,所述桩引导件构造成沿向下的方向引导所述桩; 以及 - 通过固定在可漂浮体上的致动器将所述堆从可漂浮体驱动到水下床中。
    • 9. 发明申请
    • A METHOD OF INSTALLING A PILE BY MEANS OF A PILE GUIDE
    • 一种通过指导手段安装桩的方法
    • WO2016169923A1
    • 2016-10-27
    • PCT/EP2016/058634
    • 2016-04-19
    • IHC IQIP UK LTD
    • MACK, James Ewart Milligan
    • E02D13/04
    • E02D13/04
    • In a method of installing a pile in the sea bottom by means of a pile guide which has a frame and at least an upper and a lower pair of cooperating guide members, wherein the upper pair and the lower pair are located at a distance from each other in vertical direction, wherein each pair of guide members comprises a passive guide member and an active guide member, the passive guide member and the active guide member are moved towards the pile after placing the pile between each of the pairs of guide members. The passive guide members are moved to respective fixed initial guiding positions with respect to the frame and the active guide members are moved to the pile until the passive and the active guide members engage the pile, after which the pile is hold between the upper pair of guide members and between the lower pair of guide members during driving the pile into the sea bottom, during which the actual forces between the pile and the respective guide members are determined.
    • 在通过具有框架和至少一对上部和下部一对协作引导构件的桩引导件将堆桩安装在海底中的方法中,其中上部对和下部对位于距离每个 另一个在垂直方向上,其中每对引导构件包括被动引导构件和主动引导构件,在将桩放置在每对引导构件之间时,被动引导构件和主动引导构件朝向桩移动。 被动引导构件相对于框架移动到相应的固定的初始引导位置,并且主动引导构件移动到桩,直到被动和主动引导构件接合桩,之后,桩保持在上部一对 引导构件和在将桩驱动到海底期间的下一对引导构件之间,确定桩和各引导构件之间的实际力。
    • 10. 发明申请
    • 케이싱 로테이터용 클램프장치
    • 用于铸造旋转器的夹紧装置
    • WO2015108284A1
    • 2015-07-23
    • PCT/KR2014/012235
    • 2014-12-12
    • (주)부마씨이
    • 이상식이상태
    • E02D13/04
    • E02D13/04
    • 본 발명은 케이싱 로테이터용 클램프장치에 대한 것으로서, 더욱 상세하게는 웨지클램프가 클램프바디의 가이드홈에서 벗어나지 않고 슬라이딩을 하여 케이싱을 파지할 수 있는 케이싱 로테이터용 클램프장치에 대한 것이다. 본 발명에 따른 케이싱 로테이터용 클램프장치는 웨지클램프와, 클램프바디와, 연결수단을 포함한다. 상기 웨지클램프는 웨지형상이며 케이싱을 파지한다. 상기 클램프바디는 내부에 케이싱이 삽입될 수 있는 관통공이 형성되고, 상기 웨지클램프가 하강하면 상기 웨지클램프가 상기 관통공에 삽입된 케이싱을 파지할 수 있도록 안쪽으로 안내하는 가이드홈이 형성된다. 상기 연결수단은 상부프레임에 의해서 상기 웨지클램프가 상하강될 때 상기 클램프바디의 반경방향으로 병진이동을 할 수 있게 상기 웨지클램프를 상기 상부프레임에 연결시킨다. 본 발명에 의하면, 한 쌍의 링크로 웨지클램프가 평행사변형을 이루면서 평행이동만 하도록 제한한다. 그래서 웨지클램프에 과도한 모멘트가 작용하더라도 한 쌍의 링크가 이를 지지할 수 있다. 그래서 웨지클램프가 클램프바디에서 이탈하는 것을 방지할 수 있다.
    • 本发明涉及一种用于壳体旋转器的夹紧装置,更具体地,涉及一种用于壳体旋转器的夹紧装置,其构造成使得楔形夹具可以在不偏离夹具主体的引导槽的情况下滑动,从而抓住壳体。 根据本发明的用于壳体旋转器的夹紧装置包括楔形夹具,夹具本体和连接装置。 楔形夹具具有楔形并且抓住套管。 夹具本体具有形成在其中的通孔,使得壳体可以插入其中并具有形成为使得楔形夹具向下移动的引导槽,楔形夹具被向内引导,以便将插入到通孔 -孔。 连接装置将楔形夹具连接到上部框架,使得当楔形夹具通过上部框架上下移动时,楔形夹具可沿夹具主体的径向方向平移。 根据本发明,一对连杆作出限制,使得楔形夹具仅构成水平移动同时构成平行四边形。 因此,即使当过大的力矩作用在楔形夹具上时,该对连杆也可以支撑它。 因此,可以防止楔形夹具从夹具体逸出。