会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • WALL CONSTRUCTION FOR A BOILER ARRANGEMENT
    • 锅炉布置的墙壁结构
    • WO2011114297A3
    • 2013-04-25
    • PCT/IB2011051099
    • 2011-03-16
    • FOSTER WHEELER NORTH AMERICA CORPHANSEN ARTHUR
    • HANSEN ARTHUR
    • F23C10/10F23C10/18
    • F23C10/10F23C10/18F23C2206/103
    • A wall construction for a boiler arrangement (10). The boiler arrangement is formed of at least a furnace (12) and a separator (16). The furnace has a grid, a bottom part, and an upper part. The separator is arranged by conduits (70) in flow communication with both the upper part and the bottom part of the furnace. The conduits, together with the separator, form an external circulation of bed material. The upper part of the furnace has four vertical walls, and the bottom part of the furnace has a height and four walls extending from the grid up to the vertical walls. The wall construction includes at least one hollow beam being attached to a wall of the bottom part of the furnace and extending substantially over the entire height of the bottom part, and the at least one hollow beam being in flow communication with the external circulation for returning bed material into the furnace.
    • 一种锅炉装置的墙体结构(10)。 锅炉装置由至少炉(12)和分离器(16)形成。 炉具有栅格,底部和上部。 分离器由与炉的上部和底部流动连通的导管(70)布置。 导管与分离器一起形成床料的外部循环。 炉的上部具有四个垂直壁,并且炉的底部具有从栅格延伸到垂直壁的高度和四个壁。 所述壁结构包括至少一个中空梁,所述至少一个中空梁附接到所述炉底部的壁并且基本上在所述底部的整个高度上延伸,并且所述至少一个中空梁与所述外部循环流动连通以返回 床料进入炉内。
    • 9. 发明申请
    • AIR-FIRED CO2 CAPTURE READY CIRCULATING FLUIDIZED BED STEAM GENERATORS
    • 空气CO2捕获循环流化床蒸汽发生器
    • WO2009108737A3
    • 2010-04-22
    • PCT/US2009035208
    • 2009-02-26
    • ALSTOM TECHNOLOGY LTDANDRUS HERBERT E JR
    • ANDRUS HERBERT E JRLILJEDAHL GREGORY NMARION JOHN LNSAKALA NSAKALA YA
    • F23C10/10F23C9/00F23L7/00F23L15/04
    • F23C10/10F22B31/0007F23C9/00F23J15/006F23J15/06F23J2215/50F23L7/007F23L15/04F23L2900/07001F23L2900/07003F23L2900/15042Y02E20/322Y02E20/326Y02E20/344Y02E20/348
    • A combustor (110) is operative to effect therewith the combustion of fossil fuel (114') in order to thereby both heat to a working fluid (102) and generate a flue gas (104). An air preheater 144 receives the flue gas 104 generated in the combustor (110). A blower (180) causes air (188) to flow to the air preheater (144) when operating in an air fired mode, and causes both O2 and recycled flue gas 188' to flow when operating in the O2 firing mode. The air preheater (144) is operative to transfer heat from the flue gas (150) received thereby to the air 188 that is received when operating in an air fired mode or to both the received O2 and the recycled flue gas (188') that is received when operating in the O2 firing mode in order to thereby effect a preheating of the air (188) or of both the O2 and recycled flue gas, (188') depending upon the specific nature of the mode of operation thereof, and to thereby effect therewith a cooling of the flue gas received thereby. The preheated air (142) or both the preheated O2 and the recycled flue gas (142'), depending upon the specific nature of the mode of operation, is caused to flow from the air preheater (144) to the combustor (110) in order to thereby effect therewith a fluidization of the fossil fuel (114').
    • 燃烧器(110)可操作以利用化石燃料(114')的燃烧,从而既能够加热到工作流体(102)并产生烟道气(104)。 空气预热器144接收在燃烧器(110)中产生的烟气104。 当在空气燃烧模式下操作时,鼓风机(180)使空气(188)流到空气预热器(144),并且当在O 2点火模式下操作时,使O 2和再循环烟道气188'流动。 空气预热器(144)可操作以将热量从其接收的烟道气(150)传递到在空气燃烧模式下操作时接收的空气188,或者接收到的二氧化碳和再循环烟道气(188) 当在O2燃烧模式下操作时接收,以便由此根据其操作模式的具体特性来实现空气(188)或氧气和再循环烟道气(188')的预热,并且 从而通过冷却由此接收的烟道气来实现。 使预热的空气(142)或预热的氧气和再循环的废气(142')两者都取决于操作模式的特定性质,从空气预热器(144)流到燃烧器(110) 从而由此使化石燃料(114')流化。