会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • COMBINATION OF CONCRETE SPREADER AND CRANE TOWER
    • 混凝土搅拌机和起重机塔的组合
    • WO2014121306A1
    • 2014-08-07
    • PCT/VN2013/000008
    • 2013-07-09
    • DAO, Huan
    • DAO, Huan
    • E04G21/04B66C17/26
    • E04G21/0427B66C17/06B66C23/16B66C23/26E01C19/47E02D15/02
    • The invention mentions to the complex of concrete spreader (A) and crane tower (B), including: concrete pump (1), concrete tank (2), to be placed on the ground, sections of tremie pipes (4), (1 1), (20) and ball bearing (23) are fitted inside the tower sections (12) for use those setions (12) to support tremie pipe sections (1 1) to stand steadily in the crane tower (B), steel sections (27), (29) are fitted in the lower side of suspension arm (25) and tremie pipe sections( 37a), (37b), (37c), (37d) and (37e) are inter-assembled at the lower side of steel bar (29), and steel bar (29) is used for making a guide way for these sleeve sections moving, the tremie pipe sections (77), (82), (84) are fitted with ball bearing (83) and steel hoop (85), the latch structure (88) is fitted in the front and back head of these sleeve sections, the tensile structure of moving sections (37e), (37d), (37c) and (37b) is included an electrical hoist (107), to be fitted into suspension arm (25), cable branches (108a), pulleys (1 10), (1 1 1), (1 12), (1 13) are fitted in suspension arm (25) for pulling of sleeve sections (37e), (37d), (37c) and (37b) to be lengthened or shortened at concrete positions, the slanting structure of sections (82), (84) is included steel section (1 14), oil pump (129), oil tank (133) for piston cylinder (122) to push, pull sections (82), (84) to be inclined backward and ahead at the shortest and longest concrete reach.
    • 本发明涉及混凝土扩张器(A)和起重机塔(B)的复合体,包括:混凝土泵(1),混凝土罐(2),放置在地面上,水管(4),(1) 1),(20)和滚珠轴承(23)安装在塔架部分(12)内,用于这些设备(12)支撑支柱管段(11)以稳定地站立在起重机塔(B)中, (27),(29)安装在悬架臂(25)的下侧,并且支柱管部(37a),(37b),(37c),(37d)和(37e) 钢筋(29)和钢筋(29)用于制造这些套筒部移动的引导方式,曲柄管部分(77),(82),(84)装配有滚珠轴承(83)和 钢环箍(85),闩锁结构(88)装配在这些套筒部分的前后头部中,移动部分(37e),(37d),(37c)和(37b)的拉伸结构包括电气 起重机(107),安装到悬臂(25),电缆分配器 (37a),(37c),(37c),(17d),(17c), 和(37b)在混凝土位置加长或缩短,部分(82),(84)的倾斜结构包括钢部分(114),油泵(129),活塞缸(122)的油箱 )推动,拉动部分(82),(84)在最短和最长的混凝土到达时向后和向前倾斜。
    • 3. 发明申请
    • IMPROVED PERMANENTLY INSTALLED BUILDING FOUNDATION FORM
    • 改进永久安装建筑基金会表格
    • WO1993022509A1
    • 1993-11-11
    • PCT/US1993004198
    • 1993-05-04
    • PARKER, Alton, F.
    • E02B11/00
    • E04B1/0007E02D15/02E02D31/02E04B2/8652
    • A permanently-installed form-drain (10) including hollow, foraminous planks (12) and connectors (16, 18) for joining two or more of the planks in a continuously arranged concrete barrier. The instant improvements include an adapter (20/21), which serves as a straight connector, grooved plank (19) with interlocking stake (13/14), integral connector-stake and adapter-stake device (16/14, 20/14) and a tri-functional, generally rigid bracket and bracket-stake (22 and 22/22x) element, used to space and restrain/constrain the planks and/or to hold (support) reinforcement bars.
    • 一种永久安装的排水口(10),包括中空的多孔板(12)和连接器(16,18),用于将连续布置的混凝土屏障中的两个或多个木板连接起来。 即时改进包括适配器(20/21),其用作直接连接器,具有互锁桩(13/14)的开槽板(19),整体连接器桩和适配器桩装置(16/14,20/14 )和三功能的,通常刚性的支架和托架(22和22 / 22x)元件,用于空间和约束/约束板条和/或固定(支撑)钢筋。