    • 2. 发明申请
    • INTERFACE FOR BOARDING A LOW DOORSILL AIRPLANE
    • 用于安装低脚踏飞机的接口
    • WO2014197167A1
    • 2014-12-11
    • PCT/US2014/037540
    • 2014-05-09
    • EAST ISLAND AVIATION SERVICES, INC.
    • LARSON, James
    • B64F1/30B64F1/305
    • B64F1/3055B64F1/305E01D15/12E01D18/00
    • Provided is an apparatus to interface a boarding bridge having a first deck and an airplane having a second deck. The apparatus includes a lower-frame assembly, upper- frame assembly, bridge gangplank assembly, and airplane gangplank assembly. The lower-frame assembly includes a plurality of wheel assemblies. The upper-frame assembly is connected to the lower-frame assembly at adjustable height and pivoting position, and includes a third deck atop the upper-frame assembly. The bridge gangplank assembly is connected to a first end of the upper-frame assembly, and includes a fourth deck to connect the first deck and the third deck. The airplane gangplank assembly is connected to a second end of the upper-frame assembly, and includes at least a fifth deck to connect the third deck and the second deck.
    • 提供了一种用于将具有第一甲板的登机桥和具有第二甲板的飞机相连接的装置。 该装置包括下框架组件,上框架组件,桥梁平板组件和飞机滑板组件。 下框架组件包括多个轮组件。 上框架组件以可调高度和枢转位置连接到下框架组件,并且包括位于上框架组件顶部的第三甲板。 桥梁平板组件连接到上框架组件的第一端,并且包括连接第一甲板和第三甲板的第四甲板。 飞机滑板组件连接到上部框架组件的第二端,并且包括用于连接第三甲板和第二甲板的至少第五甲板。
    • 3. 发明申请
    • METHOD AND EQUIPMENT FOR ESTABLISHING PREFERABLY TEMPORARY ACTIVITY AREAS IN OR CLOSE TO CITIES
    • 在城市或邻近城市建立优选临时活动区域的方法和设备
    • WO1996021770A1
    • 1996-07-18
    • PCT/DK1996000019
    • 1996-01-11
    • PETERSEN, Frede, Andresen
    • E01D01/00
    • E01D2/00E01D15/12E01D2101/30
    • In order to establish temporary activity areas in or near larger cities it is proposed to make use of existing wet areas, on which platforms (2, 10) are established by means of a principally known technique for building light bridges, which are here mounted side by side so as to form a large floor. An associated large number of tubular bridge poles (38) ensure a high carrier capacity, and these poles are easy to mount by a direct flushing down, while, as an important matter, they are equally easy to dismount in being forced up by means of pressurized water or air. The mounting and demounting can be effected using simple auxiliaries, including a one man operated crane having guiding means for the poles (58, 60), and a high degree of stiffness in the construction is achieved by the use of individually tightened chain cross-struttings (44, 46) between the poles (38) of each pair or poles. The mounting can be effected with a low number of standard components and without help from the water side.
    • 为了在大城市或其附近建立临时活动区,建议利用现有的湿地,通过主要已知的建筑轻桥的技术建立平台(2,10),这些安装在这里 并排形成一个大的地板。 相关联的大量管状桥梁(38)确保高承载能力,并且这些极易于通过直接冲洗而安装,而作为重要的事情,它们同样容易地被卸载,以便通过 加压水或空气。 可以使用简单的辅助设备来实现安装和拆卸,包括具有用于极杆(58,60)的引导装置的单人操作起重机,并且通过使用单独紧固的链条交叉支柱实现高结构刚度 (44,46)在每对或两极的极(38)之间。 安装可以用少量的标准部件进行,没有水侧的帮助。
    • 5. 发明申请
    • ELONGATE PIPE-BASED TEMPORARY BRIDGE FOR SUPPORTING HEAVY LOADS
    • 用于支撑重载的基于管道的临时桥梁
    • WO2015084785A1
    • 2015-06-11
    • PCT/US2014/068051
    • 2014-12-02
    • OMEGA TRESTLE LLC
    • LATHAN, Kevin, EdwardTSIMMERMAN, Valery
    • E01D15/12
    • E01D18/00E01D2/00E01D15/12E01D19/125E01D2101/10
    • A temporary bridge for supporting heavy loads includes elongate hollow cylinders. A first rigid flat plate is horizontally disposed in overlying relation to each hollow cylinder and a second rigid flat plate is horizontally disposed in underlying relation to each hollow cylinder. Stress-distributing strengthening members formed by a pair of legs that are angularly disposed with respect to one another are circumferentially positioned about each hollow cylinder and the respective free ends of the legs are secured to their associated rigid flat plates. A key extends from a first end of each hollow cylinder and a mating socket is formed in a second end of each hollow cylinder to facilitate end-to-end interconnection of a plurality of hollow cylinders. Further embodiments include longitudinally-disposed timber mats, pedestrian walkways and curvature-creating members so that the bridge may follow a non-linear path of travel.
    • 用于支撑重载荷的临时桥梁包括细长的中空圆柱体。 第一刚性平板以与每个中空圆柱体重叠的方式水平设置,并且第二刚性平板水平地设置成与每个中空圆柱体的下面的关系。 由相对于彼此成角度地设置的一对腿形成的应力分布强化构件围绕每个中空圆筒周向定位,并且腿的相应的自由端固定到其相关联的刚性平板。 钥匙从每个中空圆柱体的第一端延伸,并且在每个中空圆柱体的第二端中形成配合插座,以便于多个中空圆柱体的端对端互连。 另外的实施例包括纵向布置的木质垫,行人道和曲率产生构件,使得桥可以遵循非线性行进路径。
    • 6. 发明申请
    • MOBILE LOADING DOCK WITH WHEEL ASSEMBLY
    • 移动装载与轮组件
    • WO2014193682A1
    • 2014-12-04
    • PCT/US2014/038581
    • 2014-05-19
    • LEUM, Grant
    • LEUM, Grant
    • B65G69/28
    • B65G69/30E01D15/12E01D15/127
    • A mobile loading dock (10) including a planar ramp member (12) having an underside (30) with a wheel assembly (72). The wheel assembly includes a tension spring (74), hydraulic member (76), a leg (78) hingedly attached to the ramp underside (70) and a wheel attached to the leg. The tension spring exerts a pulling force on the leg and wheel and the hydraulic member exerts a pushing force. The combined forces are directionally disposed to erect the wheel assembly when the lower end of the mobile loading dock is raised from a resting position in contact with the ground surface (84) to a mobile position.
    • 一种移动装载基座(10),包括具有带轮组件(72)的下侧(30)的平面斜面构件(12)。 车轮组件包括拉伸弹簧(74),液压构件(76),铰接地连接到斜面下侧(70)的腿部(78)和连接到腿部的轮子。 拉伸弹簧对腿部和轮子施加拉力,并且液压部件施加推力。 当移动装载台的下端从与地面(84)接触的静止位置升高到移动位置时,组合的力被定向地设置成竖立车轮组件。
    • 7. 发明申请
    • STEEL-CONCRETE COMPOSITE STRUCTURE
    • 钢 - 混凝土复合结构
    • WO2016135512A1
    • 2016-09-01
    • PCT/GB2016/050515
    • 2016-02-29
    • THE UNIVERSITY OF WARWICK
    • SUWAED, AhmedKARAVASILIS, TheodoreZIVANOVIC, Stana
    • E04B5/10E04B5/04E04B5/23
    • E04B5/10E01D2/02E01D15/12E01D2101/268E04B5/04E04B2005/237
    • A steel-concrete composite structure (1) is described. The steel-concrete composite structure comprises a steel member (2) having an upper surface (5) and a plurality of shear connector elements (6) upstanding from the upper surface and a concrete slab (4) having upper and lower surfaces (7, 8). The slab is supported on its lower surface by the upper surface of the steel member. The slab comprises a plurality of through holes (9) between the upper and lower surfaces, each through hole tapering towards the lower surface so as to form an inverted frustally-shaped seating surface (10). The concrete slab is configured and positioned with respect to the steel member such that at least one shear connector element projects into each through hole. The steel-concrete composite structure comprises a plurality of removable inverted frustoconical plugs (15), each plug having top and bottom surfaces (18, 19; Fig. 6) and an inverted frustoconically-shaped plugging surface (20; Fig. 6). Each plug has at least one through hole (16) between the top and bottom surfaces. At least one plug (15) is seated in a corresponding through hole (9) of the concrete slab. Each plug is configured such that at least one of the least one shear connector elements (6) projecting into the corresponding through hole (9) is received by a corresponding though hole (16) of the plug. The structure also comprises a plurality of fasteners (17, 29), each fastener coupled to a corresponding shear connector element and arranged to discourage removal of a plug (15) from a through hole (9) of the concrete slab.
    • 对钢筋混凝土复合结构(1)进行了说明。 钢 - 混凝土复合结构包括具有上表面(5)的钢构件(2)和从上表面直立的多个剪切连接器元件(6)和具有上表面和下表面的混凝土板(4) 8)。 板坯的下表面由钢构件的上表面支承。 板坯包括在上表面和下表面之间的多个通孔(9),每个通孔朝向下表面逐渐变细,以便形成倒置的截头状座位表面(10)。 混凝土板相对于钢构件构造和定位,使得至少一个剪切连接器元件突出到每个通孔中。 所述钢 - 混凝土复合结构包括多个可拆卸倒置的截头圆锥形塞(15),每个塞具有顶表面和底表面(18,19;图6)和倒置的截头圆锥形堵塞表面(20;图6)。 每个塞子在顶表面和底表面之间具有至少一个通孔(16)。 至少一个塞子(15)位于混凝土板的对应的通孔(9)中。 每个插头被构造成使得突出到对应的通孔(9)中的至少一个剪切连接器元件(6)中的至少一个被插塞的对应的通孔(16)容纳。 该结构还包括多个紧固件(17,29),每个紧固件联接到对应的剪切连接器元件并被布置成阻止从混凝土板的通孔(9)移除塞子(15)。
    • 10. 发明申请
    • ELONGATE PIPE-BASED TEMPORARY BRIDGE FOR SUPPORTING HEAVY LOADS
    • 用于支撑重载的基于管道的临时桥梁
    • WO2015084785A9
    • 2016-05-06
    • PCT/US2014068051
    • 2014-12-02
    • OMEGA TRESTLE LLC
    • LATHAN KEVIN EDWARDTSIMMERMAN VALERY
    • E01D15/12
    • E01D18/00E01D2/00E01D15/12E01D19/125E01D2101/10
    • A temporary bridge for supporting heavy loads includes elongate hollow cylinders. A first rigid flat plate is horizontally disposed in overlying relation to each hollow cylinder and a second rigid flat plate is horizontally disposed in underlying relation to each hollow cylinder. Stress-distributing strengthening members formed by a pair of legs that are angularly disposed with respect to one another are circumferentially positioned about each hollow cylinder and the respective free ends of the legs are secured to their associated rigid flat plates. A key extends from a first end of each hollow cylinder and a mating socket is formed in a second end of each hollow cylinder to facilitate end-to-end interconnection of a plurality of hollow cylinders. Further embodiments include longitudinally-disposed timber mats, pedestrian walkways and curvature-creating members so that the bridge may follow a non-linear path of travel.
    • 用于支撑重载荷的临时桥梁包括细长的中空圆柱体。 第一刚性平板以与每个中空圆柱体重叠的方式水平设置,并且第二刚性平板水平地设置成与每个中空圆柱体的下面的关系。 由相对于彼此成角度地设置的一对腿形成的应力分布强化构件围绕每个中空圆筒周向定位,并且腿的相应的自由端固定到其相关联的刚性平板。 钥匙从每个中空圆柱体的第一端延伸,并且在每个中空圆柱体的第二端中形成配合插座,以便于多个中空圆柱体的端对端互连。 另外的实施例包括纵向布置的木质垫,行人道和曲率产生构件,使得桥可以遵循非线性行进路径。