会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • SUBSEA HYDROCARBON PRODUCTION SYSTEM
    • SUBSEA碳氢化合物生产系统
    • WO2011147459A1
    • 2011-12-01
    • PCT/EP2010/057403
    • 2010-05-28
    • STATOIL ASASTENEVIK, Karl-Atle
    • STENEVIK, Karl-Atle
    • E21B33/035E21B43/017
    • E21B43/017E21B33/0355
    • A subsea oil and/or gas production system comprises a host production facility (15) and a plurality of subsea wells (19, 20, 21). A fluid conveying network is provided that connects each subsea well to the host production facility. A separate electrical power and data network is provided for conveying direct current electrical power and data, operatively connected to each subsea well for providing each subsea well with data transfer and electrical power services. The use of direct current ensures that the electrical power and data network can provide power over much greater distances than currently available, and the use of separate networks for conveying fluids and for providing electrical power and data transfer allows for a much more flexible system.
    • 海底油和/或天然气生产系统包括主机生产设备(15)和多个海底井(19,20,21)。 提供了将每个海底井连接到主机生产设备的流体输送网络。 提供单独的电力和数据网络,用于传送直接电力和数据,可操作地连接到每个海底井,以便为每个海底井提供数据传输和电力服务。 使用直流电流确保电力和数据网络可以提供比当前可用的更大距离的电力,并且使用用于输送流体和用于提供电力和数据传输的单独网络允许更灵活的系统。
    • 5. 发明申请
    • PROCESS
    • 处理
    • WO2011007172A2
    • 2011-01-20
    • PCT/GB2010/051153
    • 2010-07-14
    • STATOIL ASAMEYER, TrygveGORDON, Kirsteen
    • MEYER, Trygve
    • E21B43/16
    • E21B41/0064E21B43/164Y02C10/14Y02P90/70
    • The present invention provides a process for simultaneously extracting and upgrading a heavy hydrocarbon mixture, said process comprising: i) injecting supercritical or near-supercritical CO 2 at a temperature of around the critical temperature and a pressure of from around the critical pressure into a heavy hydrocarbon deposit; and ii) removing a stream of CO 2 from the deposit, which stream is charged with a hydrocarbon mixture having a lower average molecular weight than that of the heavy hydrocarbon deposit, wherein the removed CO 2 is optionally recovered and either recycled for subsequent re-injection or injected for long-term sub-surface storage.
    • 本发明提供了一种同时提取和升级重质烃混合物的方法,所述方法包括:i)在约临界温度和临界压力附近的温度下将超临界或近超临界CO 2注入到重质烃 存款; 和ii)从沉积物中除去CO 2流,该物流装载有具有比重烃沉积物平均分子量低的烃混合物,其中任选地回收除去的CO 2,并将其再循环用于随后的再注入或 注入长期地下储存。
    • 8. 发明申请
    • EQUIPMENT AND METHOD FOR REINFORCING A BOREHOLE OF A WELL WHILE DRILLING
    • 用于增强钻孔井筒的设备和方法
    • WO2010112050A1
    • 2010-10-07
    • PCT/EP2009/002484
    • 2009-04-03
    • STATOIL ASATVERLID WASA, Steinar
    • TVERLID WASA, Steinar
    • E21B33/138
    • E21B33/138C09K8/512
    • The equipment for drilling and reinforcing a borehole (1) of a well comprises a drill pipe string (5) carrying a drill tool (7) at its lowermost end and a downhole treatment device (19) held on the drill pipe string (5) for applying a liner (17) of polymer material at the surface of the borehole (1). The polymer material is a fusible and/or curable material dissolved and/or emulsified and/or dispersed in drilling fluid (9) or mud circulated through the drill pipe string (5) and an annulus between the drill pipe string (5) and the wall (15) of the borehole (1). The treatment device (19) is adapted to concentrate energy for fusing and/or curing the polymer material contained in the drilling fluid (9) in a limited space (25) at the vicinity of the wall (15) of the borehole (1). The treatment device (19) thus focuses its energy in the vicinity of the wall (15) and allows a continuous reinforcing of the borehole (1) simultaneously while drilling.
    • 用于钻井和加固井的钻孔(1)的设备包括:钻杆串(5),其最下端承载钻具(7);以及钻井管柱(5)上的井下处理装置(19) 用于在井眼(1)的表面处施加聚合物材料的衬垫(17)。 聚合物材料是溶解和/或乳化和/或分散在钻井液(9)中的可熔和/或可固化的材料或通过钻杆管(5)循环的泥浆以及钻杆管(5)和 钻孔(1)的壁(15)。 治疗装置(19)适于将能量用于在钻孔(1)的壁(15)附近的有限空间(25)内熔化和/或固化包含在钻井液(9)中的聚合物材料, 。 因此,治疗装置(19)将其能量集中在壁(15)附近,并且允许钻孔同时连续地加强钻孔(1)。