会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 61. 发明申请
    • PRESSURIZED LOADING SYSTEM FOR BLAST FURNACES
    • 用于BLAST FERNACES的加压装载系统
    • WO2006094370A1
    • 2006-09-14
    • PCT/BR2005/000264
    • 2005-12-21
    • FURTADO, José Maximiano
    • FURTADO, José Maximiano
    • F27B1/00B65G9/00B65G21/00F27D3/00B65D88/00B65D90/00
    • F27D3/18B65G69/181C21B7/007C21B7/20F27B1/20F27D3/0025F27D3/0032F27D3/0033
    • The present invention concerns a pressurized loading system for blast furnaces by feeding solid particles by means of conventional belt or pipe belt conveyors (42) directly at the top of the furnace. The loading system including stock silos (19 - 24) and valves (13 - 18, 25 - 30) is dislocated from the top of the furnace to the plant floor leaving there only the rotating and seesawing system (48,51 ,52) for the distribution of the solid particles and the safety devices (55). The whole plant is kept at the same pressure as the furnace employing a special piping system (31 - 33). The stock silos (19 - 24) can be charged and discharged alternatingly by automatic operating of the valves (13 - 18, 25 - 30). Charging of the stock silos is effected by reversible belt conveyors (4 - 6). The whole system guarantees leak-tightness and the prevention of air pollution.
    • 本发明涉及一种用于高炉的加压装载系统,其通过直接在炉顶部的传统的带式或带式输送机(42)供给固体颗粒。 包括库存仓(19-24)和阀门(13-18,25-30)的装载系统从炉顶部脱落到工厂地板,仅留下旋转和跷跷板系统(48,51,52),用于 固体颗粒和安全装置的分布(55)。 整个设备与采用特殊管道系统的炉子保持相同的压力(31 - 33)。 库存仓(19 - 24)可以通过自动操作阀门(13 - 18,25 - 30)交替进行排放。 库存仓库的充电由可逆式皮带输送机(4-6)进行。 整个系统保证密封性和防止空气污染。
    • 69. 发明申请
    • AN APPARATUS FOR THE EXTRACTION OF METALLIC MAGNESIUM
    • 用于提取金属镁的装置
    • WO2002101309A1
    • 2002-12-19
    • PCT/IT2002/000357
    • 2002-06-03
    • CATALANO, AdrianaGANDOLFO, DonatellaSANTOLCE, LucianaBRANCO, Francesco
    • BRANCO, Francesco
    • F27B1/00
    • C22B5/16C22B26/22F27B1/005F27B15/006F27D3/0033F27D3/08F27D3/10F27M2003/155Y02P10/214Y02P10/226
    • The continuous thermal extraction melting unit is composed by a charging hopper (1) that is equipped of system of hydraulic closing (2). The native mineral, through the duct (3), reaches the cochlea of feeding (4) so to be fed in the distillation zone (5). Same equipments of heating are placed on the side walls (6), they provide necessary heat for distillation. The exhausted mineral returns back through the concentric duct (7) to the run of feeding. It reaches the closing exit valve (8) to be unloaded. A extractor crusher (9) provide to facilitate the exhausted mineral extraction. The vapours of magnesium through the duct (10) reach the walls of the condenser (11), fed with cold fluid (12), to condense as metallic magnesium. A scrapper (13) handles to scrape the dust from the walls and to carry it out through the closing exit valve (14). A vacuum pump through the connection (15) allows the extraction of the incondensable gases.
    • 连续热提取熔化单元由装有液压闭合系统(2)的装料斗(1​​)组成。 通过管道(3)的天然矿物到达喂食的耳蜗(4),以便在蒸馏区(5)中进料。 相同的加热设备放置在侧壁(6)上,它们为蒸馏提供必要的热量。 耗尽的矿物质通过同心管道(7)返回到进料运行。 到达关闭出口阀(8)以卸载。 提取器破碎机(9)提供便于排出的矿物提取物。 通过管道(10)的镁的蒸汽到达冷凝器(11)的壁,供给冷流体(12),以作为金属镁冷凝。 刮板(13)处理以从墙壁刮去灰尘并将其从封闭出口阀(14)中排出。 通过连接(15)的真空泵允许提取不可冷凝气体。