    • 2. 发明授权
    • Method of construction using sheet piling sections
    • 使用板桩的施工方法
    • US07500807B2
    • 2009-03-10
    • US11786666
    • 2007-04-12
    • Alex Schmitt
    • Alex Schmitt
    • E02D29/045
    • E02D17/04E02D19/02
    • A method of construction using sheet piling sections that includes the steps of: (a) installing a sheet piling wall in the ground to enclose a first area and a second area; (b) excavating a plurality of holes in the first area; (c) excavating the second area; (d) installing a plurality of first area structural supports; (e) leveling the first area; (f) forming a first floor in the first area; (g) excavating the first area to form a first area chamber; (h) leveling the bottom surface of the first area chamber; (i) forming a first area chamber floor; (j) repeating steps (g) through (i); (k) installing a plurality of second area structural supports; (l) forming a bottom floor in the excavated second area; (m) forming a ceiling above the bottom floor to form a second area chamber; and (n) repeating step (m) until a plurality of second area chambers are formed.
    • 一种施工方法,其特征在于,包括以下步骤:(a)在地面上安装一个板桩,以封闭第一区域和第二区域; (b)在第一区域挖掘多个孔; (c)挖掘第二区; (d)安装多个第一区域结构支撑件; (e)调整第一个区域; (f)在第一区域中形成一层; (g)挖掘第一区域以形成第一区域室; (h)使第一区域室的底面平整; (i)形成第一区域室底板; (j)重复步骤(g)至(i); (k)安装多个第二区域结构支撑件; (l)在挖掘的第二区域中形成底层; (m)在所述底板上形成天花板以形成第二区域室; 和(n)重复步骤(m),直到形成多个第二区域室。
    • 4. 发明申请
    • COLLAR FOR MARINE PILE REPAIR AND METHOD OF USING SAME
    • 海底修复术及其使用方法
    • US20150117959A1
    • 2015-04-30
    • US14528387
    • 2014-10-30
    • Dennis P. CassidyBOSWELL ENGINEERING, INC.
    • Dennis P. Cassidy
    • E02D37/00E02D13/00
    • E02D37/00E02D5/64E02D13/00E02D19/02E02D29/06E02D2250/003
    • A collar for repairing a marine support has a tubular upper segment, a tubular lower segment, and a middle segment providing a transition region between the upper and lower segments. The collar can be opened and closed along a slit extending from the upper end of the collar to the lower end of the collar. To repair a marine support, the collar is opened and positioned so as to surround the marine pile and the extension. The collar is then closed and secured along the slit. The upper end of the collar is secured to the extension, and the lower end of the collar is secured closely along the perimeter of the pile. A flowable fill material is then injected into spaces between the collar and the marine support, filling or encasing voids or damaged areas on the marine support.
    • 用于修理船用支架的轴环具有管状上部段,管状下段和提供上部段和下部段之间的过渡区域的中间段。 衣领可以沿着从衣领的上端延伸到衣领的下端的狭缝打开和关闭。 为了修理海洋支架,衣领的打开和定位,以便围绕海洋堆和延伸。 然后将衣领封闭并沿狭缝固定。 套环的上端固定在延伸部上,并且套环的下端紧紧地沿桩的周边固定。 然后将可流动的填充材料注入到套环和海洋支架之间的空间中,填充或包围海洋支架上的空隙或损坏的区域。
    • 5. 发明申请
    • Flexible Modular Liquid Dam Assembly Having a Magnetic Connection System
    • 具有磁性连接系统的柔性模块化液坝组件
    • US20150063913A1
    • 2015-03-05
    • US14473150
    • 2014-08-29
    • Michael M. HappyMark D. Shaw
    • Michael M. HappyMark D. Shaw
    • E02B8/00E02B7/20
    • E02D19/02
    • A modular liquid dam comprising a plurality of individual elongated members or segments that can be assembled in an end-to-end relationship to form a temporary retainer or diverter on a substrate surface. The dam members are provided with a magnetic connection system having a magnet disposed within or exposed on the end of at least one adjacent dam member, the other adjacent dam member having a second magnet or metal member disposed within or exposed on its end, such that when the two dam members are abutted, the magnetic connection system maintains the dam members in abutting relationship. Structural mating members providing a mechanical or frictional fit may also be provided in the ends of the dam members to further enhance the connection in conjunction with the magnetic connection mechanism.
    • 模块化液体坝包括多个单独的细长构件或段,其可以以端对端的关系组装以在衬底表面上形成临时保持器或分流器。 大坝构件设置有磁性连接系统,其具有设置在至少一个相邻的阻挡构件的端部中或暴露在至少一个相邻的阻挡构件的端部上的磁体,另一个相邻的阻挡构件具有设置在其末端或暴露在其端部的第二磁体或金属构件,使得 当两个坝构件抵接时,磁连接系统将坝构件保持在邻接关系中。 提供机械或摩擦配合的结构配合构件也可以设置在阻挡构件的端部中,以进一步增强与磁连接机构的连接。
    • 9. 发明授权
    • Collar for marine pile repair and method of using the same
    • 水泥桩修复及其使用方法
    • US09303382B2
    • 2016-04-05
    • US14528387
    • 2014-10-30
    • BOSWELL ENGINEERING, INC.
    • Dennis P. Cassidy
    • E02D37/00E02D13/00E02D5/64E02D19/02E02D29/09
    • E02D37/00E02D5/64E02D13/00E02D19/02E02D29/06E02D2250/003
    • A collar for repairing a marine support has a tubular upper segment, a tubular lower segment, and a middle segment providing a transition region between the upper and lower segments. The collar can be opened and closed along a slit extending from the upper end of the collar to the lower end of the collar. To repair a marine support, the collar is opened and positioned so as to surround the marine pile and the extension. The collar is then closed and secured along the slit. The upper end of the collar is secured to the extension, and the lower end of the collar is secured closely along the perimeter of the pile. A flowable fill material is then injected into spaces between the collar and the marine support, filling or encasing voids or damaged areas on the marine support.
    • 用于修理船用支架的轴环具有管状上部段,管状下段和提供上部段和下部段之间的过渡区域的中间段。 衣领可以沿着从衣领的上端延伸到衣领的下端的狭缝打开和关闭。 为了修理海洋支架,衣领的打开和定位,以便围绕海洋堆和延伸。 然后将衣领封闭并沿狭缝固定。 套环的上端固定在延伸部上,并且套环的下端紧紧地沿桩的周边固定。 然后将可流动的填充材料注入到套环和海洋支架之间的空间中,填充或包围海洋支架上的空隙或损坏的区域。