会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Mismatch error reduction method and system for STT MRAM
    • STT MRAM的不匹配误差减少方法和系统
    • US09070466B2
    • 2015-06-30
    • US13605693
    • 2012-09-06
    • Mihail JefremowWolf AllersJan OtterstedtChristian PetersThomas Kern
    • Mihail JefremowWolf AllersJan OtterstedtChristian PetersThomas Kern
    • G11C11/16
    • G11C11/1673
    • The invention relates to methods and systems for reading a memory cell and in particular, an STT MRAM. In accordance with one aspect of the invention, a method for reading a memory cell includes combining a cell current from a memory cell with a reference current from a reference source to create an average current, enabling the average current to flow through a first mirror transistor in a sense path and a second mirror transistor in a reference path, storing the current mismatch on a capacitor coupled to the gates of the first mirror transistor and the second mirror transistor, disconnecting the memory cell from the reference path and disconnecting the reference source from the sense path, enabling the cell current only to flow through the sense path, and determining the output level of the memory cell.
    • 本发明涉及用于读取存储器单元,特别是STT MRAM的方法和系统。 根据本发明的一个方面,一种用于读取存储单元的方法包括将来自存储单元的单元电流与来自参考源的参考电流组合以产生平均电流,使平均电流能够流过第一镜像晶体管 在参考路径中的感测路径和第二镜像晶体管中,将电流失配存储在耦合到第一镜面晶体管和第二镜像晶体管的栅极的电容器上,将存储器单元与参考路径断开并将参考源与 感测路径,使得电池电流仅能够流过感测路径,并且确定存储器单元的输出电平。
    • 10. 发明申请
    • Systems and methods for calculating alerts based on pegging
    • 基于挂钩计算警报的系统和方法
    • US20070288111A1
    • 2007-12-13
    • US11448303
    • 2006-06-07
    • Thomas Kern
    • Thomas Kern
    • G06F19/00
    • G06Q10/06
    • A system and method for performing supply chain planning, includes providing a plurality of demand orders, each demand order including at least one input interface node, each input interface node identifying a type of material required by said demand order, a quantity of the material required by said demand order and a requirements date the material is required by said demand order, providing a plurality of supply orders, each supply order including at least one output interface node, each output interface node identifying a type of material provided by said supply order, a quantity of the material provided by said supply order and a date the material is provided by said supply order, combining a plurality of said demand orders into an aggregated demand order and forming an aggregated demand time line, each aggregated demand order indicating a quantity of material required, the quantity of material required being a sum of the quantities of the material required by said plurality of demand orders combined into the aggregated demand order and performing an operation for pegging the plurality of supply orders to the aggregated demand orders
    • 一种用于执行供应链规划的系统和方法,包括提供多个需求订单,每个需求订单包括至少一个输入接口节点,每个输入接口节点标识所述需求订单所需的材料类型,所需材料的数量 通过所述需求订单和要求日期,所述需求订单需要材料,提供多个供应订单,每个供应订单包括至少一个输出接口节点,每个输出接口节点标识由所述供应订单提供的材料的类型, 由所述供应单提供的材料的数量以及所述供应订单提供的材料的日期,将多个所述需求订单组合成聚合的需求订单并形成汇总的需求时间线,每个汇总的需求订单指示数量 所需的材料,所需材料的数量是所述多个材料所需的材料的数量的总和 并将订单组合成聚合需求订单,并执行将多个供应订单与聚集的需求订单挂钩的操作