会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • SYSTEMS AND METHODS FOR MONITORING AUTOMATION SYSTEMS
    • 用于监测自动化系统的系统和方法
    • US20120023058A1
    • 2012-01-26
    • US13009375
    • 2011-01-19
    • Salman MohagheghiJean-Charles Tournier
    • Salman MohagheghiJean-Charles Tournier
    • G06N7/02
    • G05B23/0278
    • Systems and methods are disclosed for monitoring operation of an automation system that includes a plurality of interconnected logical objects. The systems and methods may build a fuzzy cognitive map to model an interdependence of the plurality of interconnected logical objects upon one another. In some examples, the systems and methods may identify a non-ideality associated with at least one of the plurality of logical objects and determine from the fuzzy cognitive map an effect of the non-ideality on the operation of the automation system. In some examples, the systems and methods may determine from the fuzzy cognitive map a first one of the plurality of logical objects that affects a second one of the plurality of logical objects to a greater extent than do the remaining ones of the plurality of logical objects.
    • 公开了用于监视包括多个互连的逻辑对象的自动化系统的操作的系统和方法。 系统和方法可以构建模糊认知图,以模拟多个彼此相互连接的逻辑对象的相互依赖关系。 在一些示例中,系统和方法可以识别与多个逻辑对象中的至少一个相关联的非理想性,并且从模糊认知图确定非理想性对自动化系统的操作的影响。 在一些示例中,系统和方法可以从模糊认知图确定影响多个逻辑对象中的第二个逻辑对象的第一个逻辑对象的第一个逻辑对象比第一个逻辑对象中的剩余的多个逻辑对象 。
    • 9. 发明申请
    • Systems and Methods for Integrating Demand Response with Service Restoration in an Electric Distribution System
    • 将电力需求响应与服务恢复相结合的系统与方法
    • US20130085624A1
    • 2013-04-04
    • US13595053
    • 2012-08-27
    • Fang YangSalman MohagheghiZhao Li
    • Fang YangSalman MohagheghiZhao Li
    • G06F1/26
    • H02J3/14Y02B70/3225Y04S20/222
    • Systems and methods for integrating demand response with service restoration in an electric distribution system. The electric distribution system may include a plurality of regions, zones, and/or areas including at least an outage area that includes a fault and is not receiving electric current from the electric distribution system and a restoration area that is receiving electric current from the electric distribution system and that may be selectively configured to provide electric current to a selected portion of the outage area. The electric distribution system also includes a plurality of demand responsive loads configured to be selectively isolated from the electric distribution system responsive to a load shed signal. The demand responsive loads may be selectively utilized during service restoration, such as to provide additional excess capacity within the restoration area and/or decrease a magnitude of the electric load applied by the selected portion of the outage area.
    • 在电力分配系统中将需求响应与服务恢复相结合的系统和方法。 配电系统可以包括多个区域,区域和/或至少包括具有故障的中断区域并且没有从配电系统接收电流的区域和从电气接收电流的恢复区域 分配系统,并且其可以被选择性地配置为向中断区域的选定部分提供电流。 配电系统还包括多个需求响应负载,其被配置为响应于负载流失信号而与配电系统选择性隔离。 可以在服务恢复期间选择性地利用需求响应负载,例如在恢复区域内提供额外的过剩容量和/或减小由所述中断区域的所选部分施加的电负载的大小。