会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Plant and process for the production of pig iron and/or sponge iron
    • 用于生产生铁和/或海绵铁的生产和加工
    • US5989308A
    • 1999-11-23
    • US817263
    • 1997-04-17
    • Leopold-Werner KepplingerKonstantin MilionisDieter SiukaHorst Wiesinger
    • Leopold-Werner KepplingerKonstantin MilionisDieter SiukaHorst Wiesinger
    • C21B11/00C21B13/00C21B13/14C22B5/12
    • C21B13/0033C21B13/002C21B13/14Y02P10/122Y02P10/128Y02P10/136Y02P10/265Y02P10/283
    • A plant for the production of pig iron and/or sponge iron includes a direct-reduction shaft furnace for lumpy iron ore, a melter gasifier, a feed duct for a reducing gas connecting the melter gasifier with the shaft furnace, a conveying duct for the reduction product formed in the shaft furnace connecting the shaft furnace with the melter gasifier, a top-gas discharge duct departing from the shaft furnace, feed ducts for oxygen-containing gases and carbon carriers running into the melter gasifier and a tap for pig iron and slag provided at the melting vessel. In order to be able to process not only lumpy ore, but also fine ore within a wide variation range with regard to quantity in a manner optimized in terms of energy and product, the plant includes at least one fluidized bed reactor for receiving fine ore, a reducing-gas feed duct leading to the fluidized bed reactor, an offgas discharge duct departing from the fluidized bed reactor and a discharge means provided for the reduction product formed in the fluidized bed reactor, wherein the top-gas discharge duct of the shaft furnace and the offgas discharge duct of the fluidized bed reactor run into a purifier and subsequently into a heat exchanger from which the reducing-gas feed duct of the fluidized bed reactor departs.
    • PCT No.PCT / AT95 / 00199 Sec。 371日期1997年04月17日 102(e)日期1997年4月17日PCT提交1995年10月12日PCT公布。 出版物WO96 / 12045 日期1996年04月25日生产生铁和/或海绵铁的工厂包括用于块状铁矿石的直接还原竖炉,熔炉气化器,用于将熔化炉气化器与竖炉连接的还原气体的进料管, 在竖炉中形成的用于还原产品的输送管道,其将竖炉与熔化器气化器连接起来,从立式炉排出的顶部气体排出管道,用于含氧气体的进料管和进入熔化炉气化器的碳载体, 在熔化容器处提供生铁和矿渣的水龙头。 为了能够在能量和产品方面优化的方式处理不仅块状矿石,而且能够处理在数量方面的广泛变化范围内的细矿石,该装置包括至少一个用于接收细矿石的流化床反应器, 通向流化床反应器的还原气进料管道,离开流化床反应器的废气排放管道和为流化床反应器中形成的还原产物提供的排放装置,其中竖炉的顶部排气管道 并且流化床反应器的废气排放管道进入净化器,随后进入热交换器,流化床反应器的还原气体进料管从该换热器排出。
    • 6. 发明授权
    • Plate mould for continuous casting
    • 连铸模板
    • US4523623A
    • 1985-06-18
    • US422873
    • 1982-09-24
    • Gunter HolleisHorst Wiesinger
    • Gunter HolleisHorst Wiesinger
    • B22D11/05B22D11/12B22D33/04
    • B22D11/05
    • A plate mould for continuous casting includes a carrying frame and broad-side walls supported therein and delimiting the mould cavity. Between the broad-side walls, end walls are arranged. The broad-side walls are adjustable normal to the axis of the mould cavity by an adjustment device and clampable relative to each other by a clamping device. In order to enable a perfect movement of the broad-side walls in the direction normal to the axis of the mould cavity, which is simple to maintain and adjust by the maintenance personnel, and to provide an easy installation and removal of the mould insert, each broad-side wall is clampable in the vertical direction by at least one clamp strap, against a holding plate of the carrying frame supporting the broad-side wall. The clamp strap is supported on the broad-side wall and on the carrying frame and clampable against the carrying frame in the manner of a bending carrier by a tensioning device that is detachable from the upper side of the mould.
    • 用于连续铸造的板模具包括承载框架和支撑在其中的宽侧壁并限定模具腔。 在宽侧壁之间,设置端壁。 宽侧壁通过调节装置可垂直于模具腔的轴线调节,并通过夹紧装置相对于彼此夹紧。 为了能够使垂直于模腔的轴线的方向完全移动宽侧壁,维护人员易于维护和调节,并且提供了容易的安装和拆卸模具插入件, 每个宽侧壁可以通过至少一个夹紧带在垂直方向上夹紧,抵靠支撑宽侧壁的承载框架的保持板。 夹紧带支撑在宽侧壁和承载框架上,并通过可从模具上侧拆卸的张紧装置以弯曲载体的方式夹紧在承载框架上。
    • 7. 发明授权
    • Method and plant for producing iron from lumpy and fine-particulate sponge iron
    • 从块状和细粒状海绵铁生产铁的方法和设备
    • US06214083B1
    • 2001-04-10
    • US09155966
    • 1998-02-11
    • Horst Wiesinger
    • Horst Wiesinger
    • C21B1100
    • C21B13/002C21B13/14C21B2100/44Y02P10/122Y02P10/128Y02P10/136
    • In a method of producing liquid pig iron or liquid steel pre-products from iron-oxide-containing material, fine-particulate iron-oxide-containing material is reduced to fine-particulate sponge iron by the fluidized bed method by passing a reducing gas through at least one fluidized bed reduction stage (7, 8), and lumpy ore is reduced to lumpy sponge iron in a fixed bed reduction stage (28). The sponge iron is charged into a melting-gasifying zone (11) and is molten there under a supply of carbon carriers and oxygen-containing gas, in which a CO— and H2-containing reducing gas is generated for reducing the iron-oxide-containing material. To avoid treating the fine-particulate sponge iron separately from the lumpy sponge iron, the fine-particulate sponge is charged directly to the melting-gasifying zone (11) in an untreated condition and in fine-particulate form, and there, is melted together with the lumpy sponge iron.
    • 在从含铁氧化物的材料制造液态生铁或液态钢预制品的方法中,通过流化床法将含细颗粒氧化铁的材料通过使还原气体通过 至少一个流化床还原阶段(7,8)和块状矿石在固定床还原阶段(28)中还原成块状海绵铁。 将海绵铁装入熔化气化区(11)中,在碳载体和含氧气体的供给下熔融,其中产生含CO和H 2的还原气体以还原氧化铁 - 含有材料。 为了避免与块状海绵铁分开处理细颗粒海绵铁,将细颗粒海绵以未处理状态和细颗粒形式直接加入到熔化气体区(11)中,并熔融在一起 与块状海绵铁。
    • 10. 发明授权
    • Supporting and guiding arc for a cast strand
    • 支撑和引导弧线
    • US4485837A
    • 1984-12-04
    • US411693
    • 1982-08-26
    • Horst WiesingerGunter HolleisWerner ScheureckerWalter Antonitsch
    • Horst WiesingerGunter HolleisWerner ScheureckerWalter Antonitsch
    • B22D11/128B22D11/12
    • B22D11/1282B22D11/1285
    • In a supporting and guiding arc for cast strands including rollerways supporting the strand on opposite sides, the rollers are mounted on one-piece arcuate longitudinal carriers extending over the total length of the guiding arc. Transverse carriers are arranged in pairs opposite each other along the arcuate longitudinal carriers at a distance from one another, engaging the arcuate longitudinal carriers from behind and being connected by drawing anchors. In order to combine the advantages of guiding arcs assembled of segments arranged in series with the advantages of guiding arcs equipped with continuous arcuate longitudinal carriers, each rollerway has only two arcuate longitudinal carriers. A plurality of supporting segments are inserted between the arcuate longitudinal carriers and are detachably fastened to the same. A plurality of rollers allocated to a rollerway are journaled on each supporting segment. After detachment of a supporting segment from the arcuate longitudinal carriers, the supporting segment is removable from the supporting and guiding arc, together with its rollers.
    • 在用于铸造线的支撑和引导电弧中,包括在相对侧上支撑绞合线的滚道,滚子安装在在引导弧的整个长度上延伸的一体式弓形纵向载体上。 横向载体彼此成对地布置成彼此间隔一定距离的弓形纵向载体,从后方与弓形纵向载体接合并通过牵引锚连接。 为了结合引导串联排列的电弧的优点和引导具有连续弓形纵向载体的弧的优点,每个滚道仅具有两个弓形纵向载体。 多个支撑段插入在弓形纵向载体之间并可拆卸地固定在其上。 分配给滚道的多个滚子记录在每个支撑段上。 在支撑段从弓形纵向载体分离之后,支撑段可与其滚子一起从支撑和引导弧移除。