会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD AND APPARATUS FOR MOBILE IP ROUTE OPTIMIZATION
    • 用于移动IP路由优化的方法和装置
    • US20090262685A1
    • 2009-10-22
    • US12442696
    • 2007-10-01
    • Jon SchuringaJens BachmannGenadi VelevKillan Weniger
    • Jon SchuringaJens BachmannGenadi VelevKillan Weniger
    • H04W40/02H04L9/32
    • H04W8/082H04L63/126H04W8/065H04W80/04
    • The current application concerns a method, mobile node, home agent and system for route optimisation between a mobile node and at least one correspondent node in a packet switched network, wherein a route via a first home agent is redirected via a second home agent. The mobile node sends an extended home test initiation message comprising following information: authentication data, an address of the correspondent node, a first home address and a second home address. The first home agent receives the extended home test initiation message and sends an extended home test message to the second home agent, the extended home test message comprising the information from the extended home test initiation message. The second home agent receives the extended home test message and a communication is routed between the mobile node and the at least one correspondent node via the second home agent.
    • 当前应用涉及在分组交换网络中的移动节点与至少一个通信节点之间的路由优化的方法,移动节点,归属代理和系统,其中经由第一归属代理的路由经由第二归属代理被重定向。 移动节点发送包括以下信息的扩展归属测试发起消息:认证数据,对端节点的地址,第一家庭地址和第二家庭地址。 第一归属代理接收扩展的归属测试发起消息,并向第二归属代理发送扩展归属测试消息,扩展归属测试消息包括来自扩展归属测试发起消息的信息。 第二归属代理接收扩展归属测试消息,并且通过第二归属代理在移动节点和至少一个对应节点之间路由通信。
    • 2. 发明授权
    • Mobile communication method and access router
    • 移动通信方式和接入路由器
    • US08155085B2
    • 2012-04-10
    • US12373554
    • 2007-07-26
    • Tetsuya KawakamiGenadi VelevJon Schuringa
    • Tetsuya KawakamiGenadi VelevJon Schuringa
    • H04W4/00
    • H04W36/0011H04W8/26H04W40/36H04W80/04H04W88/005
    • A technology is disclosed in which, when a normal mobile node (that does not newly provide a dedicated function) is used, signaling for reconfiguring a tunnel during a mobile node movement is reduced and, furthermore, packet loss is reduced. In the technology, when an MN moves from under the control of an AR2 that is a movement origin to be under the control of an AR3 that is a movement destination, the AR3 receives an NS transmitted from the MN to the AR2. The AR3 that receives the NS destined to the AR2 transmits a “Location Update” to the AR2. The AR2 that receives the “Location Update” uses an MN management table of the relevant MN and creates “Prefix Information” and returns the “Prefix Information” to the AR3. A tunnel is established between access routers of the AR2 and AR3 through use of the “Prefix Information”, and a packet destined to the MN is transferred to the MN via the tunnel.
    • 公开了一种技术,其中当使用普通移动节点(不新提供专用功能)时,在移动节点移动期间重新配置隧道的信令被减少,并且还减少了分组丢失。 在该技术中,当MN从作为运动起点的AR2的控制下移动到作为移动目的地的AR3的控制下时,AR3接收从MN向AR2发送的NS。 接收发往AR2的NS的AR3向AR2发送“位置更新”。 接收“位置更新”的AR2使用相关MN的MN管理表,并创建“前缀信息”,并将“前缀信息”返回给AR3。 通过使用“前缀信息”在AR2和AR3的接入路由器之间建立隧道,并且去往MN的分组经由隧道传送到MN。
    • 3. 发明授权
    • Connection based local IP-mobility
    • 基于连接的本地IP移动性
    • US08625483B2
    • 2014-01-07
    • US12294663
    • 2007-03-12
    • Jon SchuringaGenadi VelevRolf Hakenberg
    • Jon SchuringaGenadi VelevRolf Hakenberg
    • H04W4/00
    • H04L61/2084H04L29/12311H04W8/087H04W8/26H04W36/0011H04W48/16H04W80/04H04W84/10H04W88/005
    • The invention relates to a method for packet switched data transmission in a local network, the local network comprising a mobile node and a plurality of interconnected connection anchor points each with a link at which the mobile node can attach. The method comprises the steps of detecting a movement of the mobile node from a first connection anchor point to a second connection anchor point, the mobile node communicating via a tunneled connection between the first and second connection anchor point, maintaining the existing tunneled connections between the second connection anchor point and the first connection anchor point, and enabling new connections between the mobile node and correspondent nodes using addresses that are topologically correct.
    • 本发明涉及一种用于本地网络中的分组交换数据传输的方法,所述本地网络包括移动节点和多个互连的连接锚定点,每个连接锚点具有移动节点可以附接的链路。 该方法包括以下步骤:检测移动节点从第一连接定位点到第二连接定位点的移动,移动节点通过第一和第二连接锚点之间的隧道连接进行通信,保持现有隧道连接 第二连接锚点和第一连接锚点,并且使用拓扑正确的地址来启用移动节点和通信节点之间的新连接。
    • 4. 发明申请
    • MOBILE COMMUNICATION METHOD AND ACCESS ROUTER
    • 移动通信方法和接入路由器
    • US20100002652A1
    • 2010-01-07
    • US12373554
    • 2007-07-26
    • Tetsuya KawakamiGenadi VelevJon Schuringa
    • Tetsuya KawakamiGenadi VelevJon Schuringa
    • H04W36/00
    • H04W36/0011H04W8/26H04W40/36H04W80/04H04W88/005
    • A technology is disclosed in which, when a normal mobile node (that does not newly provide a dedicated function) is used, signaling for reconfiguring a tunnel during a mobile node movement is reduced and, furthermore, packet loss is reduced. In the technology, when an MN moves from under the control of an AR2 that is a movement origin to be under the control of an AR3 that is a movement destination, the AR3 receives an NS transmitted from the MN to the AR2. The AR3 that receives the NS destined to the AR2 transmits a “Location Update” to the AR2. The AR2 that receives the “Location Update” uses an MN management table of the relevant MN and creates “Prefix Information” and returns the “Prefix Information” to the AR3. A tunnel is established between access routers of the AR2 and AR3 through use of the “Prefix Information”, and a packet destined to the MN is transferred to the MN via the tunnel.
    • 公开了一种技术,其中当使用普通移动节点(不新提供专用功能)时,在移动节点移动期间重新配置隧道的信令被减少,并且还减少了分组丢失。 在该技术中,当MN从作为运动起点的AR2的控制下移动到作为移动目的地的AR3的控制下时,AR3接收从MN向AR2发送的NS。 接收发往AR2的NS的AR3向AR2发送“位置更新”。 接收“位置更新”的AR2使用相关MN的MN管理表,并创建“前缀信息”,并将“前缀信息”返回给AR3。 通过使用“前缀信息”在AR2和AR3的接入路由器之间建立隧道,并且去往MN的分组经由隧道传送到MN。
    • 9. 发明申请
    • NETWORK-BASED AND HOST-BASED MOBILITY MANAGEMENT IN PACKET-BASED COMMUNICATION NETWORKS
    • 基于分组通信网络的基于网络和基于主机的移动性管理
    • US20100046434A1
    • 2010-02-25
    • US12524686
    • 2008-01-29
    • Kilian WenigerGenadi VelevJens Luis BachmannJon SchuringaTakashi Aramaki
    • Kilian WenigerGenadi VelevJens Luis BachmannJon SchuringaTakashi Aramaki
    • H04W8/02
    • H04W8/06H04W80/04
    • The present invention describes a method for signalling to a mobility anchor point a position of a mobile node in a network using a network-based mobility management scheme for managing the mobility of the mobile node, said method comprising receiving, by a network element, from the mobile node, during or after network authentication of the mobile node, a sequence number used by a process implementing a mobile node-based mobility management scheme for managing the mobility of the mobile node, and transmitting, by the network element, to the mobility anchor point a message on a position of the mobile node in the network, wherein said message comprises the received sequence number. A common sequence number variable for BU and PBU messages is used, so that the HA is able to determine a correct transmission order of PBU/BU messages based on the sequence number in the message.
    • 本发明描述了一种用于使用基于网络的移动性管理方案向移动锚点向移动锚定点发信号的方法,所述移动节点用于管理移动节点的移动性,所述方法包括:由网元从 移动节点在移动节点的网络认证期间或之后,由实现基于移动节点的移动性管理方案的处理使用的序列号,用于管理移动节点的移动性,并且由网络元件将其发送到移动性 定位在网络中的移动节点的位置上的消息,其中所述消息包括接收到的序列号。 使用BU和PBU消息的公共序列号变量,使得HA能够基于消息中的序列号来确定PBU / BU消息的正确传输顺序。