会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Software factory health monitoring
    • 软件厂健康监测
    • US08327318B2
    • 2012-12-04
    • US11735099
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • G06F9/44
    • G06F8/10G06F8/36G06F8/71G06Q10/06
    • A method, system, and computer-readable medium for maintaining a health of a software factory that creates custom software in a standardized manner is presented. In a preferred embodiment, the method includes the steps of: defining work packets to perform sub-functions of a custom software; tracking a transmission of the work packets to an assembly line in a software factory; monitoring any retrieval of software artifacts that are used to create the work packets; monitoring any on-going changes of work activities that are contained in the work packets; determining if execution of the work packets conforms to governance guidelines for the software factory; monitoring the software factory to ensure that the work packets comply with an architecture of the software factory; tracking quality metrics for an execution of the work packets in an assembly line in the software factory; and transmitting all tracked and monitored information described above to a dashboard.
    • 提出了一种用于维持以标准化方式创建定制软件的软件工厂健康的方法,系统和计算机可读介质。 在优选实施例中,该方法包括以下步骤:定义工作包以执行定制软件的子功能; 跟踪工作包的传输到软件工厂的装配线; 监视用于创建工作包的软件工件的任何检索; 监测工作包中包含的工作活动的任何正在进行的变化; 确定工作包的执行是否符合软件工厂的治理准则; 监控软件厂,确保工作包符合软件厂的架构; 跟踪在软件工厂的装配线中执行工作包的质量指标; 并将上述所有跟踪和监视的信息发送到仪表板。
    • 2. 发明申请
    • Work Packet Forecasting in a Software Factory
    • 软件工厂的工作包预测
    • US20080256529A1
    • 2008-10-16
    • US11735086
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. JobsonNaomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. JobsonNaomi M. MitsumoriFrancis X. Reddington
    • G06F9/445
    • G06F8/71G06F8/20G06F8/36G06Q10/06G06Q10/10
    • A method, system, and computer-readable medium for predicatively selecting which work packets will be needed by a software factory to create a deliverable custom software are presented. In a preferred embodiment, the computer-implemented method includes: presenting an initial checklist that consists of a series of question groups; receiving answers to the initial checklist; in response to determining that received answers to the initial checklist indicate that a new series of questions is required to predict which work packets will be needed to create the deliverable custom software, dynamically generating a new checklist; evaluating leading indicators for the received answers; based on relevancy of answers and the leading indicators, eliminating irrelevant questions from the new checklist; and based on answers to remaining relevant questions, determining if a particular work packet will be needed to create the deliverable custom software in the software factory.
    • 提出了一种方法,系统和计算机可读介质,用于预先选择软件工厂需要哪些工作包来创建可交付的定制软件。 在优选实施例中,计算机实现的方法包括:呈现由一系列问题组组成的初始检查表; 接收初始清单的答复; 响应于确定接收到的初始检查表的答案指示需要新的一系列问题来预测将需要哪些工作包来创建可交付的定制软件,动态生成新的清单; 评估收到的答案的主要指标; 基于答案的相关性和领先指标,从新的清单中消除无关的问题; 并基于对剩余相关问题的答案,确定是否需要特定的工作包来在软件工厂中创建可交付的定制软件。
    • 3. 发明授权
    • Assembling work packets within a software factory
    • 组装软件工厂内的工作包
    • US08141040B2
    • 2012-03-20
    • US11735056
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • G06F9/44
    • G06F8/36G06F8/10
    • A method, system, and computer-readable medium for assembling work packets within a software factory are presented. In a preferred embodiment, the computer-implemented method comprises the steps of: collecting a plurality of software artifacts that have been archived during an assembly of previous work packets; collecting a plurality of metrics that have been utilized during the assembly of previous work packets; defining a template for a new work packet, wherein the template for the new work packet is created by a packet definition process that defines attributes that are needed in the new work packet; selecting requisite software artifacts from the plurality of software artifacts; selecting requisite metrics from the plurality of metrics; and sending the template, requisite software artifacts and requisite metrics to a packet assembly process, wherein the packet assembly process assembles the requisite software artifacts to create the new work packet.
    • 提出了一种用于在软件工厂内组装工作包的方法,系统和计算机可读介质。 在优选实施例中,计算机实现的方法包括以下步骤:收集在先前工作分组的组合期间已被归档的多个软件工件; 收集在组装先前工作分组期间已被使用的多个度量; 定义新工作包的模板,其中用于新工作包的模板由定义新工作包中需要的属性的分组定义过程创建; 从所述多个软件工件中选择必需的软件工件; 从所述多个度量中选择必要度量; 以及将模板,所需的软件工件和必要的度量发送到分组组装过程,其中分组组装过程组装所需的软件工件以创建新的工作分组。
    • 5. 发明授权
    • Software factory readiness review
    • 软件工厂准备审查
    • US08898619B2
    • 2014-11-25
    • US13618744
    • 2012-09-14
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • G06F9/44G06F19/28G06Q10/00
    • G06Q10/00
    • A computer-implemented method, system, and computer-readable medium for determining if a software factory is ready to take on a software project is presented. In a preferred embodiment, the computer-implemented method includes the steps of: determining if an infrastructure for a software factory has been procured; determining if operational software needed to assemble work packets in an assembly line in the software factory has been installed; determining if a workflow event model for an assembly line in the software factory has been configured; determining if workload in the assembly line has been balanced; determining if communication channels between the software factory and a customer's computer system have been defined and cleared for data transmission; and in response to determining that any element described above has been determined not to have occurred, prohibiting an induction of a software project into the software factory.
    • 提出了一种用于确定软件工厂是否准备好接管软件项目的计算机实现的方法,系统和计算机可读介质。 在优选实施例中,计算机实现的方法包括以下步骤:确定软件工厂的基础设施是否已被采购; 确定是否安装了在软件工厂装配线上组装工作包所需的操作软件; 确定软件工厂中装配线的工作流事件模型是否已配置; 确定装配线中的工作量是否平衡; 确定软件工厂和客户的计算机系统之间的通信通道是否被定义和清除以进行数据传输; 并且响应于确定上述任何元素已被确定为不发生,禁止将软件项目引入软件工厂。
    • 6. 发明授权
    • Work packet forecasting in a software factory
    • 软件工厂的工作包预测
    • US08566777B2
    • 2013-10-22
    • US11735086
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • G06F9/44
    • G06F8/71G06F8/20G06F8/36G06Q10/06G06Q10/10
    • A method, system, and computer-readable medium for predicatively selecting which work packets will be needed by a software factory to create a deliverable custom software are presented. In a preferred embodiment, the computer-implemented method includes: presenting an initial checklist that consists of a series of question groups; receiving answers to the initial checklist; in response to determining that received answers to the initial checklist indicate that a new series of questions is required to predict which work packets will be needed to create the deliverable custom software, dynamically generating a new checklist; evaluating leading indicators for the received answers; based on relevancy of answers and the leading indicators, eliminating irrelevant questions from the new checklist; and based on answers to remaining relevant questions, determining if a particular work packet will be needed to create the deliverable custom software in the software factory.
    • 提出了一种方法,系统和计算机可读介质,用于预先选择软件工厂需要哪些工作包来创建可交付的定制软件。 在优选实施例中,计算机实现的方法包括:呈现由一系列问题组组成的初始检查表; 接收初始清单的答复; 响应于确定接收到的初始检查表的答案指示需要新的一系列问题来预测将需要哪些工作包来创建可交付的定制软件,动态生成新的清单; 评估收到的答案的主要指标; 基于答案的相关性和领先指标,从新的清单中消除无关的问题; 并基于对剩余相关问题的答案,确定是否需要特定的工作包来在软件工厂中创建可交付的定制软件。
    • 7. 发明申请
    • Rapid On-Boarding of a Software Factory
    • 快速登陆软件厂
    • US20080256505A1
    • 2008-10-16
    • US11735120
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. JobsonNaomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. JobsonNaomi M. MitsumoriFrancis X. Reddington
    • G06F9/44
    • G06F8/36G06F8/10
    • A method, system, and computer-readable medium for rapid on-boarding of a software factory are presented. In a preferred embodiment, the computer-implemented method comprises the steps of: identifying choke-points in a first software project; creating a checklist of identifying factors that caused the choke-points that were identified in the first software project; receiving a new software project at a software factory, wherein the new software project is in a same software category as the first software project; presenting the checklist for the first software project; receiving new answers to the checklist; determining if the software factory is ready to handle the new software project based on the new answers to the checklist; and in response to determining that the software factory is ready to handle the new software project, configuring the software factory in a same configuration as that previously used by the first software project.
    • 介绍了软件工厂快速登机的方法,系统和计算机可读介质。 在优选实施例中,计算机实现的方法包括以下步骤:识别第一软件项目中的阻塞点; 创建一个识别导致第一个软件项目中确定的阻塞点的因素的清单; 在软件工厂接收新的软件项目,其中新软件项目与第一个软件项目处于相同的软件类别; 提供第一个软件项目的清单; 收到清单的新答复; 确定软件工厂是否准备好根据清单的新答案处理新的软件项目; 并且响应于确定软件工厂准备好处理新的软件项目,配置与先前由第一个软件项目使用的相同配置的软件工厂。
    • 8. 发明申请
    • Software Factory Readiness Review
    • 软件工厂准备审查
    • US20080255693A1
    • 2008-10-16
    • US11735152
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. JobsonNaomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. JobsonNaomi M. MitsumoriFrancis X. Reddington
    • G06F19/00
    • G06Q10/00
    • A computer-implemented method, system, and computer-readable medium for determining if a software factory is ready to take on a software project is presented. In a preferred embodiment, the computer-implemented method includes the steps of: determining if an infrastructure for a software factory has been procured; determining if operational software needed to assemble work packets in an assembly line in the software factory has been installed; determining if a workflow event model for an assembly line in the software factory has been configured; determining if workload in the assembly line has been balanced; determining if communication channels between the software factory and a customer's computer system have been defined and cleared for data transmission; and in response to determining that any element described above has been determined not to have occurred, prohibiting an induction of a software project into the software factory.
    • 提出了一种计算机实现的方法,系统和计算机可读介质,用于确定软件工厂是否准备好接管软件项目。 在优选实施例中,计算机实现的方法包括以下步骤:确定软件工厂的基础设施是否已被采购; 确定是否安装了在软件工厂装配线上组装工作包所需的操作软件; 确定软件工厂中装配线的工作流事件模型是否已配置; 确定装配线中的工作量是否平衡; 确定软件工厂和客户的计算机系统之间的通信通道是否被定义和清除以进行数据传输; 并且响应于确定上述任何元素已被确定为不发生,禁止将软件项目引入软件工厂。
    • 10. 发明授权
    • Software factory readiness review
    • 软件工厂准备审查
    • US08296719B2
    • 2012-10-23
    • US11735152
    • 2007-04-13
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • Jarir K. ChaarRonald D. FinlaysonThomas A. Jobson, Jr.Naomi M. MitsumoriFrancis X. Reddington
    • G06F9/44G06F19/28
    • G06Q10/00
    • A computer-implemented method, system, and computer-readable medium for determining if a software factory is ready to take on a software project is presented. In a preferred embodiment, the computer-implemented method includes the steps of: receiving a software project proposal including a custom software description describing a specific project type of the software project; determining, by a computer processor, that the software project proposal is qualified for acceptance by a software factory, utilizing a scorecard for the specific project type, wherein the scorecard provides a maturity assessment of resources required and identifies any potential choke-points for the specific project type; and in response to a determination that the software project proposal is qualified for acceptance by the software factory, the software factory undertaking the software project proposal.
    • 提出了一种用于确定软件工厂是否准备好接管软件项目的计算机实现的方法,系统和计算机可读介质。 在优选实施例中,计算机实现的方法包括以下步骤:接收包括描述软件项目的特定项目类型的定制软件描述的软件项目提案; 由计算机处理器确定软件项目提案有资格由软件工厂接受,利用特定项目类型的记分卡,其中记分卡提供所需资源的成熟度评估,并且识别特定项目的任何潜在阻塞点 项目类型; 并根据软件项目提案是否有资格由软件工厂,软件工厂承担软件项目提案的决定作出回应。