会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明申请
    • Construction Machine
    • 施工机械
    • US20160215477A1
    • 2016-07-28
    • US14915943
    • 2015-01-14
    • HITACHI CONSTRUCTION MACHINERY CO., LTD.
    • Hiroshi KUMAGAIKazuhiko MIZOGUCHIMasao NAKAMURAHideto ISHIBASHI
    • E02F9/08B60K13/04
    • E02F9/0866B60K13/04B60Y2200/412E02F9/0816F01N13/009F01N13/1805F01N2470/18F01N2590/08
    • A post-treatment, device mounting frame (20) on which an exhaust gas post-treatment device (13) is mounted is constituted by a front mounting leg (21), a rear mounting leg (24), and a deck (27) connecting the front and rear mounting legs (21) and (24) to each other. A vertical leg part (22) of the front mounting leg (21) is mounted on a front vertical leg part mounting plate (5F) of a right front extension beam (5E2). A lateral leg part (23) of the front mounting leg (21) is mounted on a front lateral leg part mounting plate (5M) of a right front engine support bracket (5K). A vertical leg part (25) of the rear mounting leg (24) is mounted on a rear vertical leg part mounting plate (5G) of a right rear extension beam (5E3). A lateral leg part (26) of the rear mounting leg (24) is mounted on a rear lateral leg part mounting plate (5N) of a right rear engine support bracket (5L). Therefore, the post-treatment device mounting frame (20) is firmly mounted in a state of four-point support on a revolving frame (5).
    • 安装有排气后处理装置(13)的后处理装置安装框架(20)由前安装脚(21),后安装脚(24)和甲板(27)构成, 将前后安装脚(21)和(24)彼此连接。 前安装腿(21)的垂直腿部(22)安装在右前延伸梁(5E2)的前垂直腿部安装板(5F)上。 前安装脚(21)的侧腿部(23)安装在右前发动机支撑支架(5K)的前侧腿部安装板(5M)上。 后安装腿(24)的垂直腿部(25)安装在右后延伸梁(5E3)的后垂直腿部安装板(5G)上。 后安装腿(24)的侧腿部(26)安装在右后发动机支撑支架(5L)的后侧腿部安装板(5N)上。 因此,后处理装置安装框架20以四点支撑的状态牢固地安装在旋转框架5上。