会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Well having inductively coupled power and signal transmission
    • 具有电感耦合功率和信号传输
    • US07882892B2
    • 2011-02-08
    • US11988144
    • 2006-06-28
    • Bjømar SvenningBjarne Bugten
    • Bjømar SvenningBjarne Bugten
    • G01V3/06G01V3/18
    • E21B47/122E21B17/028
    • Well for production of hydrocarbons, comprising a hole drilled down into an underground, a casing fastened to the hole wall, a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone, a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well, distinguished in that the well further comprises: a primary coil arranged concentrically about the production pipe, a secondary coil arranged concentrically about the production pipe, a load connected to the secondary coil, and an alternating current generator/signal unit connected to the primary coil.
    • 适用于生产碳氢化合物,包括钻入地下的孔,固定在孔壁上的套管,从表面延伸到壳体中的生产管,向下延伸至含烃区域,表面上的悬挂器 井的上端,其中挂钩生产管和套管挂起并电短路,并且封隔器布置在生产管和套管之间的环形空间中密封和电短路,或者靠近下部 其特征在于阱还包括:围绕生产管同心布置的初级线圈,围绕生产管同心布置的次级线圈,连接到次级线圈的负载以及连接到交流发电机/信号单元的交流发电机/信号单元 到初级线圈。
    • 2. 发明申请
    • Well Having Inductively Coupled Power and Signal Transmission
    • 具有感应耦合功率和信号传输
    • US20090166023A1
    • 2009-07-02
    • US11988144
    • 2006-06-28
    • Bjomar SvenningBjarne Bugten
    • Bjomar SvenningBjarne Bugten
    • E21B43/00E21B41/00E21B47/12E21B17/00
    • E21B47/122E21B17/028
    • Well for production of hydrocarbons, comprising a hole drilled down into an underground, a casing fastened to the hole wall, a production pipe that extends into the casing from the surface and down to a hydrocarbon-containing zone, a hanger on the surface in an upper end of the well, in which hanger the production pipe and casing are hung up and electrically short-circuited, and a packer arranged sealingly and electrically short-circuiting in the annulus between the production pipe and the casing, in or close to a lower end of the well, distinguished in that the well further comprises: a primary coil arranged concentrically about the production pipe, a secondary coil arranged concentrically about the production pipe, a load connected to the secondary coil, and an alternating current generator/signal unit connected to the primary coil.
    • 适用于生产碳氢化合物,包括钻入地下的孔,固定在孔壁上的套管,从表面延伸到壳体中的生产管,向下延伸至含烃区域,表面上的悬挂器 井的上端,其中挂钩生产管和套管挂起并电短路,并且封隔器布置在生产管和套管之间的环形空间中密封和电短路,或者靠近下部 其特征在于阱还包括:围绕生产管同心布置的初级线圈,围绕生产管同心布置的次级线圈,连接到次级线圈的负载以及连接到交流发电机/信号单元的交流发电机/信号单元 到初级线圈。
    • 5. 发明授权
    • Method and apparatus for taking seismic measurements
    • 采取地震测量的方法和装置
    • US5747754A
    • 1998-05-05
    • US507293
    • 1995-08-24
    • Bj.o slashed.rnar SvenningTormod HalsBjarne Bugten
    • Bj.o slashed.rnar SvenningTormod HalsBjarne Bugten
    • G01V1/20G01V1/38G01V1/053G01V1/047
    • G01V1/3808G01V1/201
    • Method and apparatus for carrying out seismic survey includes a plurality of spaced apart seismic detecting sensors each having a geophone unit for detecting seismic activities. The sensors are linked serially with a cable. One end of each geophone unit is flexibly linked to a carrier frame so that the geophone units pivotally move freely relative to the carrier frames. The cable passes through the carrier frames so that the carrier frames are spaced apart serially. Each geophone unit carries a vibrator, a plurality of geophones, a compass, and an inclinometer. The vibrator is positioned on the free end portion of the geophone unit, for embedding the geophone into the ground, while the compass is positioned farthest away from the vibrator. The free pivotal movement of the geophone units enables them to dig into the ground.
    • PCT No.PCT / NO94 / 00043 Sec。 371日期1995年8月24日 102(e)日期1995年8月24日PCT 1994年2月21日PCT PCT。 WO94 / 19707 PCT公开号 日期1994年9月1日。用于进行地震勘测的方法和装置包括多个间隔开的地震检测传感器,每个具有用于检测地震活动的地震检波器单元。 传感器与电缆串联连接。 每个地震检波器单元的一端被灵活地连接到载体框架,使得地震检波器单元相对于载体框架自由枢转地移动。 电缆穿过载体框架,使得载体框架间隔开。 每个地震检波器单元携带振动器,多个地震检波器,罗盘和倾斜计。 振动器位于地震检波器单元的自由端部分,用于将地震检波器嵌入地面,同时罗盘位于最远离振动器的位置。 地震检波器单元的自由枢轴运动使他们能够挖入地面。