    • Converter station power set point analysis system and method
    • 变电站功率设定点分析系统及方法
    • US09450409B2
    • 2016-09-20
    • US13922644
    • 2013-06-20
    • ABB Research Ltd.
    • Debrup DasReynaldo NuquiMats Larsson
    • G06F1/32H02J3/14H02J3/34H02J3/38H02J3/36
    • H02J3/14G06F1/3203H02J3/34H02J3/36H02J3/38Y02E60/60
    • Converter stations have real and reactive power set points initially determined as part of a main loadflow analysis routinely performed on the AC power system connected to the converter stations. Viable real and/or reactive power set points for the converter stations can be identified by calculating real and/or reactive power set point candidates for the converter stations before the main loadflow analysis is performed again on the AC power system. The power set point candidates are calculated based on information determined as part of a previous iteration of the main loadflow analysis on the AC power system. The power set point candidates which violate an operating constraint imposed on the AC power system are identified, and a region of valid power set points is defined for the converter stations that excludes the power set point candidates which violate an operating constraint imposed on the AC power system.
    • 转换器站具有最初确定为在连接到转换器站的AC电力系统上常规执行的主要负载流分析的一部分的实际和无功功率设定点。 可以通过在AC电力系统再次执行主负载流分析之前计算转换器站的实际和/或无功功率设定点候选来识别转换站的可行的实际和/或无功功率设定点。 功率设定点候选是基于作为交流电力系统主负载流分析的先前迭代的一部分确定的信息来计算的。 识别违反施加在交流电力系统上的操作约束的功率设定点候选,并且为排除违反施加于交流电源的操作约束的功率设定点候选的转换器站定义有效功率设定点的区域 系统。
    • 4. 发明授权
    • Power transmission network state visualization
    • 电力传输网络状态可视化
    • US09336616B2
    • 2016-05-10
    • US14017832
    • 2013-09-04
    • ABB RESEARCH LTD
    • Martin NaefMats Larsson
    • G06T11/20H02J13/00G06T11/40
    • G06T11/206G06T11/40H02J13/001Y04S10/40
    • A method and system are provided for visualizing and displaying a state of a power transmission network to an operator, for the supervision of the network. The method and system are provided for visualizing or contouring a power transmission network state by displaying to an operator output data values interpolated at output data locations from input data including geographically distributed input data sensor locations and corresponding dynamically updated input data values. The method includes dividing a geographical area of interest into triangles, wherein a triangle vertex is defined at each input data location within the area, determining, for each triangle, closest input data locations according to a closeness criteria, and interpolating by weighting or scaling at each output data location within a triangle the input data values of a number of closest input data locations to generate output data values corresponding to the output data locations.
    • 提供了一种方法和系统,用于将电力传输网络的状态可视化并显示给运营商,以用于网络的监督。 该方法和系统被提供用于通过向操作者显示在输出数据位置处内插的数据值,包括地理上分布的输入数据传感器位置和对应的动态更新的输入数据值,输出在输出数据位置上显示或轮廓化输电网状态。 该方法包括将感兴趣的地理区域划分为三角形,其中在区域内的每个输入数据位置处定义三角形顶点,根据接近度标准确定每个三角形最接近的输入数据位置,并通过加权或缩放内插 每个输出数据位置在一个三角形内的输入数据值的最接近的输入数据位置,以产生对应于输出数据位置的输出数据值。
    • 8. 发明申请
    • Converter Station Power Set Point Analysis System and Method
    • 变电站功率设定点分析系统及方法
    • US20140379157A1
    • 2014-12-25
    • US13922644
    • 2013-06-20
    • ABB Research Ltd.
    • Debrup DasReynaldo NuquiMats Larsson
    • H02J3/14
    • H02J3/14G06F1/3203H02J3/34H02J3/36H02J3/38Y02E60/60
    • Converter stations have real and reactive power set points initially determined as part of a main loadflow analysis routinely performed on the AC power system connected to the converter stations. Viable real and/or reactive power set points for the converter stations can be identified by calculating real and/or reactive power set point candidates for the converter stations before the main loadflow analysis is performed again on the AC power system. The power set point candidates are calculated based on information determined as part of a previous iteration of the main loadflow analysis on the AC power system. The power set point candidates which violate an operating constraint imposed on the AC power system are identified, and a region of valid power set points is defined for the converter stations that excludes the power set point candidates which violate an operating constraint imposed on the AC power system.
    • 转换器站具有最初确定为在连接到转换器站的AC电力系统上常规执行的主要负载流分析的一部分的实际和无功功率设定点。 可以通过在AC电力系统再次执行主负载流分析之前计算转换器站的实际和/或无功功率设定点候选来识别转换站的可行的实际和/或无功功率设定点。 功率设定点候选是基于作为交流电力系统主负载流分析的先前迭代的一部分确定的信息来计算的。 识别违反施加在交流电力系统上的操作约束的功率设定点候选,并且为排除违反施加于交流电源的操作约束的功率设定点候选的转换器站定义有效功率设定点的区域 系统。