会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Process and apparatus for producing curved hollow bodies of
thermoplastic material
    • 用于生产热塑性材料的弯曲中空体的方法和设备
    • US6129885A
    • 2000-10-10
    • US103259
    • 1998-06-23
    • Martin Klein
    • Martin Klein
    • B29C49/04B29C49/42B29C31/08
    • B29C49/4242B29C49/04B29L2031/24
    • In a process and apparatus for producing elongate curved hollow bodies at least partially comprising thermoplastic material a preform is extruded from an extrusion system head and engaged by a gripping means. The preform is moved by the gripping means into the region of a guide stencil disposed above the mold cavity of a mold portion of a divided blow molding mold and introduced into the mold cavity by a simultaneous downward movement of the gripping means and a movement following the configuration of the guide stencil. The guide stencil has two mutually opposite walls, the spacing of which increases in an upward direction and the spacing of which at the bottom of the guide stencil approximately corresponds to the maximum width of the mold cavity. The preform is thus guided towards the mold cavity by the walls, acquiring its definitive orientation with respect thereto by virtue of such guidance, passing through a lower opening in the guide stencil into the mold cavity. The mold is closed and the preform expanded therein by an increased internal pressure in the preform.
    • 在用于生产至少部分地包含热塑性材料的细长弯曲中空体的方法和装置中,预成型件从挤出系统头部挤出并由夹持装置接合。 预成型件通过夹持装置移动到布置在分模吹塑模具的模具部分的模腔上方的导向模板的区域中,并通过夹持装置的同时向下运动和随后的运动被引入模腔中 引导模板的配置。 引导模板具有两个彼此相对的壁,其间隔在向上方向上增加,并且其在引导模板底部的间距大致对应于模腔的最大宽度。 因此,预成型件被壁引导到模腔,借助于这种引导,通过导向模板中的下开口进入模腔,从而获得其相对于其的确定取向。 模具封闭,并且预成型件通过预成型件中的内部压力增加而膨胀。
    • 5. 发明授权
    • Process for the production of a hollow body of thermoplastic material
    • 制造热塑性材料中空体的方法
    • US5534218A
    • 1996-07-09
    • US141916
    • 1993-10-22
    • Werner DaubenbuchelAlfred Jira
    • Werner DaubenbuchelAlfred Jira
    • B29C31/00B29C35/02B29C49/04B29C49/20B29C49/24
    • B29C49/2408B29C31/008B29C49/20B29C2049/2017B29C2049/2073B29C2049/2095B29C35/02B29C49/04B29K2105/20
    • In a process for the production of a hollow body of thermoplastic material which is to include an additional portion, by expansion of a preform in a blow molding mold, the additional portion is connected to the hollow body upon expansion of the preform to form the hollow body. To form the connection between the hollow body and the additional portion, the latter is heated by a heating element which is brought into contact with at least the surface of the additional portion that is to involve the welded connection to the hollow body, prior to expansion of the preform. The heating element is brought into contact with the additional portion when already disposed in the blow molding mold in order in that way to heat at least the appropriate surface of the additional portion to a temperature which premotes the production of an adhesive join to the hollow body. The region of the additional portion that is to be heated is at least substantially covered relative to the outside atmosphere by the heating element.
    • 在用于制造热塑性材料的中空体的方法中,其包括附加部分,通过在吹塑模具中膨胀预成型件,在预成型件膨胀时,附加部分连接到中空体,以形成中空 身体。 为了形成中空本体和附加部分之间的连接,后者通过加热元件加热,加热元件在膨胀之前与至少与包括与中空体的焊接连接的附加部分的表面接触 的预制件。 当已经设置在吹塑模具中时,加热元件与附加部分接触,以这种方式将至少将附加部分的适当表面加热至预先将粘合剂生产连接到中空体的温度 。 被加热的附加部分的区域通过加热元件至少基本上被外部气氛覆盖。
    • 7. 发明授权
    • Plug-type barrel
    • 插头桶
    • US6145694A
    • 2000-11-14
    • US482427
    • 2000-01-13
    • Karl-Heinz Roesing
    • Karl-Heinz Roesing
    • B65D1/12B65D1/20B65D8/02B65D6/40
    • B65D1/20
    • A barrel of thermoplastic material has a peripherally extending carrier and transportation ring in the region of its upper end portion and at least one plughole connection in the edge region of the latter. The bung hole connection is disposed within a housing which is let into the upper end portion. The housing is open at its side towards the edge of the barrel while at its other side it has a boundary end wall, from each of the two ends of which a respective wall extends towards the edge of the barrel, the walls laterally defining the housing. The walls defining the housing are delimited at the top side by a transition from the respective wall into the upper end portion of the barrel and at the lower end by a transition from the respective wall into the bottom of the housing. The spacing between the upper transitions of the two ends of the housing is greater than the spacing between the two lower transitions and the upper transitions diverge towards the edge of the barrel. The transitions between the side walls and the upper end portion of the barrel body on the one hand and the transitions between the side walls and the bottom of the housing on the other hand do not extend parallel. The transitions between the side walls and the upper end portion include an angle which is at least 120.degree..
    • 一桶热塑性材料在其上端部分的区域中具有周向延伸的载体和输送环,并且在其后缘的边缘区域中具有至少一个插孔连接。 孔洞连接件设置在容纳在上端部的壳体内。 壳体在其侧面朝向桶的边缘开口,而在其另一侧具有边界端壁,其两端中的每一个相应壁朝向桶的边缘延伸,壁侧向地限定壳体 。 限定壳体的壁在顶侧被界定为从相应的壁到筒的上端部的过渡,并且在下端通过从相应的壁向壳体的底部的过渡。 壳体两端的上部过渡部分之间的间隔大于两个下部过渡部分之间的间隔,而上部过渡部朝着枪管的边缘发散。 另一方面,侧壁和筒体的上端部之间的过渡部分和壳体的侧壁与底部之间的过渡不平行延伸。 侧壁和上端部之间的转变包括至少120°的角度。
    • 8. 发明授权
    • Injection molding apparatus for processing thermoplastic materials
    • 用于加工热塑性材料的注塑设备
    • US5814358A
    • 1998-09-29
    • US765564
    • 1996-12-23
    • Stefan Bock
    • Stefan Bock
    • B29C45/54B29C45/78
    • B29C45/54B29C45/561B29C2045/545
    • An injection molding apparatus for processing thermoplastic materials has at least one plasticizer unit, at least one injection molding cylinder with associated emptying piston, and at least one injection molding mold. The injection molding cylinder is provided with a sleeve which is arranged reciprocally between a position in which communication with the injection molding mold is interrupted and a position in which communication with the injection molding mold exists. In the position in which the communication with the injection molding mold is interrupted, a passage is provided between the sleeve and the housing which is connected between the feed conduit from the plasticizer unit and a storage space defined on the inside by the sleeve. The outside diameter of the ejection piston is slightly smaller than the inside diameter of the sleeve so that remaining between the two is an annular gap through which the plastic material passes into the storage space from one end of the sleeve.
    • PCT No.PCT / DE96 / 00847 Sec。 371日期:1996年12月23日 102(e)日期1996年12月23日PCT提交1996年5月8日PCT公布。 出版物WO96 / 35568 日期1996年11月14日一种用于加工热塑性材料的注塑设备具有至少一个增塑剂单元,至少一个具有相关联的排空活塞的注塑缸和至少一个注模模具。 注射成型气缸设置有套筒,该套筒在与注射成型模具的连通中断的位置和与注射成型模具连通的位置之间往复放置。 在与注射成型模具的连通中断的位置,在套筒和壳体之间提供通道,该通道连接在来自增塑剂单元的进料管道和通过套筒限定在内部的储存空间之间。 喷射活塞的外径略小于套筒的内径,使得两者之间保持的是环形间隙,塑料材料通过该环形间隙从套筒的一端进入储存空间。
    • 10. 发明授权
    • Process for the production of hollow bodies from thermoplastic material
    • 从热塑性材料生产中空体的方法
    • US5409647A
    • 1995-04-25
    • US688623
    • 1991-06-13
    • Erich KieferPeter Klusener
    • Erich KieferPeter Klusener
    • B29B11/10B29C47/20B29C47/92B29C49/04B29C49/78B29C49/80
    • B29C47/54B29C47/20B29C47/92B29C2947/92514B29C2947/9258B29C2947/92657B29C47/0023B29C49/04
    • In that process for the production of hollow bodies from thermoplastic material by extrusion blow molding in which discontinuously extruded preforms are expanded in a blow molding mold, at least during that part of the filling phase which is typical of such a process, for an extrusion head, the distance covered by an ejection piston associated with a storage chamber and the speed at which the ejection piston is displaced within the storage chamber by the plasticised material are detected and compared by a central control and regulating device to the respective reference values. On the basis of the result of the comparison operation at least one operating parameter of the process, for example the delivery output of the extruder or the extent of the emptying strike movement of the ejection piston can then be adapted while still in the same working cycle in such a way that substantially the required preform volume is ejected.
    • PCT No.PCT / DE90 / 00824 Sec。 371日期1991年6月13日 102(e)日期1991年6月13日PCT提交1990年10月27日PCT公布。 出版物WO91 / 06418 日本1991年5月16日。在用于通过挤出吹塑成型从热塑性材料制造中空体的方法中,其中不连续挤出的预成型件在吹塑模具中膨胀,至少在填充阶段的这种部分期间是典型的 过程中,对于挤压头,由与储存室相关联的喷射活塞覆盖的距离以及弹性活塞在储存室内被塑化材料移位的速度被检测并通过中央控制和调节装置进行比较 各自的参考值。 基于比较操作的结果,可以在仍然处于相同工作循环的同时适应该过程的至少一个操作参数,例如挤出机的输送输出或排出活塞的排空冲击运动的程度 以这样的方式使得基本上所需的预成型体体积被弹出。