会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 81. 发明授权
    • Communication system, transmission device and method thereof, and reception device and method thereof
    • 通信系统,发送装置及其方法以及接收装置及其方法
    • US07961658B2
    • 2011-06-14
    • US11715928
    • 2007-03-09
    • Kazuyuki SakodaKenzoh NishikawaChihiro FujitaMitsuhiro SuzukiErika Saito
    • Kazuyuki SakodaKenzoh NishikawaChihiro FujitaMitsuhiro SuzukiErika Saito
    • G08C17/00
    • H04W52/0232H04M1/72525H04W48/08H04W48/16Y02D70/00Y02D70/142
    • A communication system includes a transmission device and a reception device. The transmission device includes a first software processor that performs, if a first information portion has been updated, software processing on the first information portion, a first hardware processor that performs hardware processing on a second information portion, a generation unit that generates a beacon signal, and a transmitter that transmits the generated beacon signal. The reception device includes a reception unit that receives the beacon signal, a separator that separates the first information portion from the second information portion, a second hardware processor that performs hardware processing on the separated second information portion, a determination unit that determines whether the separated first information portion has been updated, and a second software processor that performs, if the first information portion has been updated, software processing on the updated first information portion.
    • 通信系统包括发送装置和接收装置。 传输设备包括第一软件处理器,如果已经更新了第一信息部分,则对第一信息部分进行软件处理,对第二信息部分执行硬件处理的第一硬件处理器,产生信标信号的生成单元 以及发送所生成的信标信号的发送机。 接收装置包括:接收信标信号的接收单元,将第一信息部分与第二信息部分分离的分离部,对分离后的第二信息部分进行硬件处理的第二硬件处理部;确定部, 第一信息部分已经被更新,以及第二软件处理器,如果第一信息部分已经被更新,则对更新的第一信息部分进行软件处理。
    • 82. 发明申请
    • Graceful Wakeup Of Power Saving Communication Apparatuses
    • 节能通信设备的优雅唤醒
    • US20110122780A1
    • 2011-05-26
    • US12626038
    • 2009-11-25
    • Johanna M. NieminenJarkko KnecktNarzul A. Mirza
    • Johanna M. NieminenJarkko KnecktNarzul A. Mirza
    • H04L12/26G08C17/00
    • H04W52/0232H04W28/18Y02D70/1262Y02D70/142Y02D70/144Y02D70/22Y02D70/23
    • An apparatus determines a wireless traffic load; generates at least one timer value based at least in part on the determined traffic load; and initiates a wireless transmission at a time based at least in part on the at least one timer value. The at least one timer value indicates a time for initiating a transmission after changing from a lower power state to a higher power state. In an exemplary embodiment the wireless traffic load is determined via continuous monitoring and initiating the transmission includes obtaining a transmission opportunity for sending a trigger frame or a power save poll frame. Various exemplary techniques are detailed as to how to determine the traffic load. The generated at least one timer value is a maximum time, which may be truncated for example after the apparatus receives a data unit by which to obtain a network allocation vector.
    • 一种装置确定无线业务负载; 至少部分地基于所确定的业务负载生成至少一个定时器值; 并且至少部分地基于所述至少一个定时器值一次启动无线传输。 至少一个定时器值指示在从较低功率状态改变到更高功率状态之后发起发送的时间。 在示例性实施例中,通过连续监视来确定无线业务负载,并且发起传输包括获得用于发送触发帧或省电轮询帧的传输机会。 关于如何确定业务负载的各种示例性技术是详细的。 所生成的至少一个定时器值是最大时间,其可以例如在设备接收到获取网络分配向量的数据单元之后被截断。
    • 85. 发明授权
    • Energy aware early detection
    • 能源意识早期检测
    • US07936678B2
    • 2011-05-03
    • US12310310
    • 2007-07-13
    • Harri PaloheimoJohanna Nieminen
    • Harri PaloheimoJohanna Nieminen
    • G01R31/08
    • H04L47/10H04L45/26H04L47/115H04L47/14H04L47/30H04L47/32H04L49/90H04W40/10H04W52/0219H04W52/0232H04W52/0261H04W84/18H04W88/04Y02D70/142Y02D70/144Y02D70/22Y02D70/23Y02D70/26Y02D70/326
    • An incoming data packet is received, and a rate of change of residual capacity of a portable power supply is determined. From the determined rate of change it is decided to enqueue or drop the incoming data packet. If the decision is to enqueue, the packet is transmitted. If the decision is drop, the packet is deleted without transmitting. Additional factors may be considered in the decision, such as total energy capacity, residual energy capacity, and first and second derivatives of the residual energy capacity. Real time traffic may be treated differently than non real time traffic, and video enhancement layer packets can be weighted to drop more frequently than video base layer packets for the same flow. If used in the network, congestion probe packets are dropped at a rate matched to the rate at which data packets are dropped to give other nodes an accurate view of link quality.
    • 接收到输入的数据分组,并且确定便携式电源的剩余容量的变化率。 从确定的变化率,决定入站或丢弃传入的数据包。 如果决定是入队,则传送包。 如果决定丢弃,则数据包将被删除而不发送。 决策中可以考虑其他因素,例如总能量容量,剩余能量容量以及剩余能量容量的一阶和二阶导数。 实时流量可以被视为不同于非实时流量,并且视频增强层分组可以被加权以相同流量的视频基本层分组的频率下降。 如果在网络中使用,拥塞探测数据包将以与丢弃数据包的速率相匹配的速率丢弃,为其他节点提供链路质量的准确视图。