会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 83. 发明申请
    • MAINTAINING INTEGRITY OF LOWER COMPLETION FOR MULTI-STAGE FRACTURING
    • US20230057873A1
    • 2023-02-23
    • US17404881
    • 2021-08-17
    • Saudi Arabian Oil CompanyBaker Hughes Oilfield Operations LLC
    • Waheed Syed ArshadAgung KuswirantoMohammed Parvez Khan
    • E21B43/26E21B43/14E21B47/07E21B33/124E21B33/122
    • A method includes designing a lower completion string for a multi-stage hydraulic fracturing job for a wellbore drilled into a subterranean zone. The lower completion string includes a plurality of stages and a plurality of packers configured to isolate each of the stages. Each stage of the plurality of stages includes a respective tubular stage assembly, and each stage is configured to be placed within a respective one of a plurality of frac intervals of the wellbore defined by the plurality of packers. Designing the lower completion string includes, for each stage of the plurality of stages, receiving a measured hole diameter of the respective one of the plurality of frac intervals and performing an axial safety factor analysis of the stage. The axial safety factor analysis includes a comparison of a yield strength in tension or compression of the respective tubular stage assembly of the stage with calculated effective axial tensile or compressive forces to which the respective tubular stage assembly of the stage would be subject when positioned in the frac interval in the wellbore. The axial safety factor analysis uses a predicted anchored status of the lower completion string, which includes an extent to which the respective tubular stage assembly would be predicted to elongate or contract when the lower completion string is positioned in the wellbore and the plurality of packers are set. The axial safety factor analysis also uses a distance between a first packer of the plurality of packers isolating the stage and a second packer of the plurality of packers isolating the stage, and the measured hole diameter of the respective frac interval. The method also includes determining that the axial safety factor analysis for each stage of the plurality of stages satisfies a threshold and, in response to the determining that the threshold is satisfied for each stage of the plurality of stages, inserting the lower completion string into the wellbore and performing the multi-stage hydraulic fracturing job.