会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 77. 发明授权
    • Method of installing pin piles into a seabed
    • 将桩桩安装在海床上的方法
    • US09587766B2
    • 2017-03-07
    • US14786314
    • 2014-04-11
    • TECHNIP FRANCE
    • John OliphantAbiola OjoAlasdair Maconochie
    • E02D7/00F16L1/16F16L1/20E02D5/54E02D7/08E02D7/14
    • F16L1/201E02D5/54E02D7/00E02D7/08E02D7/14F16L1/16
    • A method of installing a plurality of pin piles into a seabed including at least the steps of: (a) lowering a pin pile apparatus comprising a first pin pile and an attached clump weight towards the seabed; (b) allowing the first pin pile to self-penetrate the seabed based on self-weight of the pin pile apparatus and the momentum from step (a) until the clump weight reaches the sea bed; (c) disconnecting the clump weight from the first pin pile; and (d) recovering the clump weight for use with a second pin pile and repeating steps (a)-(c). In this way, the pin piles are easily installed from their descent to the seabed with the clump weight, which can then be removed and applied to the next pin pile in an easy and repeatable operation without requiring a suction apparatus or hammer or drill.
    • 一种将多个销桩安装在海床中的方法,至少包括以下步骤:(a)将包括第一针桩和附着的重量的针桩装置降低到海底; (b)允许第一针桩基于针桩装置的自重自重穿透海床,并且从步骤(a)到达重量达到海床的动量; (c)从第一针桩断开团块重量; 和(d)回收与第二针桩一起使用的重量,并重复步骤(a) - (c)。 以这种方式,销桩很容易从下沉到海床,并且可以以简单且可重复的操作将其卸下并施加到下一个针桩上,而不需要抽吸装置或锤子或钻头。
    • 79. 发明申请
    • Transportation and Installation of Subsea Rigid Tie-In Connections
    • 海底刚性连接的运输和安装
    • US20160347422A1
    • 2016-12-01
    • US15111788
    • 2015-01-14
    • ACERGY FRANCE SAS
    • Brice Viellard
    • B63B21/66B63B35/44E21B43/017
    • B63B21/66B63B35/44B63C11/52B63G8/22B63G2008/425E21B43/013E21B43/017F16L1/16F16L1/24F16L1/26
    • A method of transporting a rigid tie-in connection across a body of water for installation underwater is disclosed. The method includes the step of supporting the tie-in connection in the water by buoyancy acting on a frame that supports the tie-in connection until installation. The buoyancy-supported frame is lowered and the tie-in connection into a sub-surface transit configuration. The method further includes in the transit configuration, towing the buoyancy-supported frame and the tie-in connection behind a towing vessel toward an installation site. Also disclosed is a system for implementing the method. The system includes a towable frame arranged to support the tie-in connection until installation and an external buoyancy attached to the frame by an extensible suspension link arranged to suspend the frame from the buoyancy in water in use. The link is extensible to lower the frame from a raised surface-tow configuration into a lowered sub-surface transit configuration.
    • 公开了一种用于在水下安装用于运输刚性连接穿过水体的方法。 该方法包括以下步骤:通过作用在支撑接合连接的框架上的浮力来支撑水中的连接连接,直到安装。 浮力支撑的框架被降低,并且连接连接成为亚表面运输配置。 该方法还包括在运输配置中,将牵引支撑的框架和牵引船后面的连接连接件朝向安装地点拖动。 还公开了一种用于实现该方法的系统。 该系统包括布置成支撑连接连接直到安装的可拖动框架,以及通过布置成将框架从使用中的水中浮力悬挂的可延伸悬挂连接件附接到框架的外部浮力。 该链接是可扩展的,以将框架从升高的表面丝束构造降低到降低的亚表面转运配置。