会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 75. 发明授权
    • Timing re-synchronization with reduced communication energy in frequency hopping communication networks
    • 定时重新同步,减少跳频通信网络中的通信能量
    • US08619789B2
    • 2013-12-31
    • US13180908
    • 2011-07-12
    • Jonathan W. HuiLik Chuen Alec WooWei Hong
    • Jonathan W. HuiLik Chuen Alec WooWei Hong
    • H04L12/28H04L12/56H04B1/00
    • H04W52/0209H04B1/7156H04W56/00
    • In one embodiment, a battery-operated communication device “quick-samples” a frequency hopping sequence at a periodic rate corresponding to a substantially low duty cycle, and is discovered by (e.g., attached to) a main-powered communication device. During a scheduled sample, the main-powered communication device transmits a control packet to be received by the battery-operated communication device, the control packet containing timing information and transmitted to account for worst-case clock drift error between the two devices. The battery-operated communication device responds to the control packet with a link-layer acknowledgment containing timing information from the battery-operated communication device. Accordingly, the two devices may re-synchronize their timing based on the timing information in the control packet and acknowledgment, respectively.
    • 在一个实施例中,电池供电的通信设备以对应于基本上较低占空比的周期性速率“跳频”跳频序列,并且通过(例如附接到)主供电通信设备来发现。 在预定采样期间,主供电通信设备发送由电池供电的通信设备接收的控制分组,该控制分组包含定时信息,并且被传送以考虑两个设备之间的最坏情况时钟漂移误差。 电池供电的通信设备用包含来自电池供电通信设备的定时信息的链路层确认来响应控制分组。 因此,两个设备可以分别基于控制分组和确认中的定时信息重新同步其定时。
    • 80. 发明申请
    • COLLECTING POWER OUTAGE NOTIFICATIONS IN A FREQUENCY HOPPING COMMUNICATION NETWORK
    • 收集频率通信网络中的功率失效通知
    • US20130028295A1
    • 2013-01-31
    • US13192802
    • 2011-07-28
    • Jonathan W. HuiWei HongLik Chuen Alec Woo
    • Jonathan W. HuiWei HongLik Chuen Alec Woo
    • H04B1/713
    • H04B1/713
    • In one embodiment, a device in a frequency hopping communication network operate in a first mode according to a common broadcast schedule for the network that simultaneously overlays a first configured portion of all independently determined unicast listening schedules in the network. In response to determining a power outage condition, the device switches to operation in a power outage mode where the common broadcast schedule for the network in the power outage mode simultaneously overlays a second configured portion of all independently determined unicast listening schedules in the network, the second configured portion greater than the first configured portion. In one embodiment, the device broadcasts one or more power outage notifications (PONs) in response to determining the power outage condition as a reduction of a main power supply at the device. In another embodiment, the device receives a PON while powered as the power outage condition.
    • 在一个实施例中,跳频​​通信网络中的设备根据网络的公共广播调度以第一模式操作,该网络同时覆盖网络中所有独立确定的单播监听时间表的第一配置部分。 响应于确定停电状况,设备切换到停电模式中的操作,其中停电模式下的网络的公共广播调度同时覆盖网络中所有独立确定的单播监听时间表的第二配置部分, 第二构造部分大于第一构造部分。 在一个实施例中,响应于将停电状况确定为设备上的主电源的减少,设备广播一个或多个断电通知(PON)。 在另一个实施例中,设备在停电状态下被接通时接收PON。