会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 56. 发明授权
    • Liquid application device and ink jet recording apparatus
    • 液体施加装置和喷墨记录装置
    • US08671880B2
    • 2014-03-18
    • US13109470
    • 2011-05-17
    • Naomi OshioOsamu IwasakiYoshinori NakagawaAtsuhiko MusuyamaNaoji Otsuka
    • Naomi OshioOsamu IwasakiYoshinori NakagawaAtsuhiko MusuyamaNaoji Otsuka
    • B05C1/08
    • B41F31/027
    • The present invention provides a liquid application device and an ink jet recording apparatus each capable of reducing deterioration in application quality due to an increase in the number of times of use of a roller, thereby improving durability. The present invention includes an application roller which applies liquid to an application medium, and a liquid retention member which retains the liquid in a liquid retention space formed by making the application roller be in contact with the retention member. With this structure, a pool of the liquid is formed, with rotation of the application roller, in an area upstream of a contact area, in a rotational direction, between the application member and the retention member at a side where a surface of the application member enters the contact area therebetween.
    • 本发明提供了一种液体施加装置和喷墨记录装置,其能够由于辊的使用次数的增加而降低施加质量的劣化,从而提高耐久性。 本发明包括向施加介质施加液体的施加辊以及将液体保持在通过使施加辊与保持构件接触而形成的液体滞留空间中的液体保持构件。 利用这种结构,在施加构件和保持构件之间,在施加构件和保持构件的表面的一侧上,在施加构件和保持构件之间沿着旋转方向在接触区域的上游区域中形成液体池, 构件进入其间的接触区域。
    • 60. 发明授权
    • Cogeneration system with first and second power plants
    • 热电联产系统与第一和第二发电厂
    • US08039991B2
    • 2011-10-18
    • US12069924
    • 2008-02-12
    • Tsutomu WakitaniYoshinori NakagawaHiroyuki Eguchi
    • Tsutomu WakitaniYoshinori NakagawaHiroyuki Eguchi
    • H02J1/00H02J3/00
    • H02J9/062H02J3/005Y10T307/25Y10T307/305Y10T307/50Y10T307/696
    • In a cogeneration system having a first power plant connected to an AC power feed line between a power network and an electrical load and a first internal combustion engine for driving the first power plant such that exhaust heat of the first engine is supplied to a thermal load, power supply from the first power plant to the power network is interrupted by turning off a switch installed in the feed line, when outage of the power network is detected and a second power plant is operated, such that outputs of the first and second power plants are supplied to the electrical load. With this, it becomes possible to respond to a commercial power network outage for preventing reverse flow of the power output by the cogeneration system into the power network and supplying as much electric power as possible to the electrical load.
    • 在具有连接到电力网络和电力负载之间的AC供电线路的第一发电厂和用于驱动第一发电厂的第一内燃机的热电联产系统中,使得第一发动机的排热被供应到热负荷 当检测到电力网络中断并且第二发电厂运行时,通过关闭安装在馈电线路中的开关来中断从第一发电厂到电力网络的电力供应,使得第一和第二电力的输出 工厂供应给电气负载。 由此,可以应对商业电力网络中断,以防止热电联产系统输出到电力网络的功率输出的反向流动,并向电力负载提供尽可能多的电力。