会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 54. 发明授权
    • Method for assisting selection of a build ahead configuration for use in supplying an ordered product
    • 用于辅助选择用于提供有序产品的建立提前配置的方法
    • US07702544B2
    • 2010-04-20
    • US11748954
    • 2007-05-15
    • Timothy James GerberIvory Wellman KnipferThomas S. MazzeoMatthew H. Zemke
    • Timothy James GerberIvory Wellman KnipferThomas S. MazzeoMatthew H. Zemke
    • G06Q30/00G06F17/30G06Q10/00
    • G06Q30/0603G06Q10/087G06Q10/0875G06Q30/0621G06Q50/04Y02P90/30
    • A method is provided for use in connection with build ahead configurations (BAC's), for enabling a manufacturer to quickly identify the available BAC that is most suitable for use in completing a product order. In one embodiment, directed to a method for increasing efficiency in constructing individual products of a particular product type, each individual product has an associated specification set. A number of BAC's are initially constructed, wherein each BAC comprises an at least partially complete product of the particular type, and likewise has an associated specification set. An order is received for an individual product of the particular type, wherein the order defines each specification in the specification set for the ordered product. Respective specifications for the ordered product are compared with the specifications of each BAC, in order to calculate a metric for each BAC, wherein the metric for a given BAC represents the effort required to modify the given BAC to conform to all specifications set of the ordered product.
    • 提供了一种用于建立预先配置(BAC)的方法,以使制造商能够快速识别最适合用于完成产品订单的可用BAC。 在一个实施例中,针对提高特定产品类型的单个产品的效率的方法,每个单独的产品具有相关联的规范集合。 最初构建了多个BAC,其中每个BAC包括特定类型的至少部分完整的产品,并且同样具有相关的规范集。 对于特定类型的单个产品接收订单,其中该订单定义了针对订购产品的规格集中的每个规格。 将有序产品的相关规格与每个BAC的规格进行比较,以便计算每个BAC的度量,其中给定BAC的度量表示修改给定BAC所需的努力以符合订购的所有规格集 产品。
    • 55. 发明申请
    • PROVIDING REAL-TIME TEST AHEAD WORK DIRECTION FOR MANUFACTURING OPTIMIZATION
    • 提供制造优化的实时测试前沿工作方向
    • US20100004962A1
    • 2010-01-07
    • US12166695
    • 2008-07-02
    • Steven C. EricksonIvory Wellman KnipferFraser Allan Syme
    • Steven C. EricksonIvory Wellman KnipferFraser Allan Syme
    • G06Q10/00
    • G06Q10/06G06Q10/0633G06Q10/0639Y02P90/86
    • A system for generating a work unit test ahead candidate list. A list is generated of all potential candidate systems for test ahead operations. A system in the potential candidate list is selected. It is determined whether any work unit in the selected system is waiting for short parts. Determining that no work unit in the selected system is waiting for short parts, a complexity score is calculated for each work unit in the selected system. The calculated complexity scores are added to a total system complexity score. It is then determined whether an override exists for a work unit in the selected system. Determining that an override does exist, the selected system is removed from the potential candidate list. A candidate list is generated from remaining systems in the potential candidate list. Then, the candidate list is outputted to provide recommendations for optimizing work unit test ahead operations.
    • 用于生成工作单元的系统用于测试提前候选人列表。 生成所有潜在候选系统的列表,用于测试提前操作。 选择潜在候选人名单中的系统。 确定所选系统中的任何工作单元是否等待短部件。 确定所选系统中没有工作单元正在等待短部件,则为所选系统中的每个工作单元计算复杂度分数。 计算出的复杂度分数被加到总体系统复杂度分数中。 然后确定是否存在所选系统中的工作单元的覆盖。 确定覆盖确实存在,所选系统从潜在候选列表中移除。 从候选列表中的剩余系统生成候选列表。 然后,输出候选列表以提供优化工作单元测试提前操作的建议。
    • 58. 发明申请
    • METHOD FOR MANUFACTURING WITH ENGINEERING CHANGE OVERRIDE
    • 用于制造工程改变的方法
    • US20080051923A1
    • 2008-02-28
    • US11466190
    • 2006-08-22
    • Ivory Wellman KnipferFraser Allan SymeMatthew H. Zemke
    • Ivory Wellman KnipferFraser Allan SymeMatthew H. Zemke
    • G06F19/00
    • G06Q10/087G06Q10/0631G06Q10/06315
    • The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for processing orders. A request for delivery by a requested delivery date is received for an order having an original delivery date. The ordered product is broken down into one or more materials required for manufacturing the ordered product. For at least one material required for manufacturing the ordered product, a date when an engineering change becomes effective for the material is specified. An alternate bill of materials is created based on the specified date when the engineering change becomes effective for the material. An alternate manufacturing plan based on the alternate bill of materials is created. Manufacturing is initiated based on the alternate manufacturing plan. If manufacturing can be completed in time for delivery by the requested delivery date, the original delivery date of the order is replaced with the requested delivery date.
    • 说明性实施例提供了用于处理订单的计算机实现的方法,装置和计算机可用程序代码。 收到要求的交货日期的交货请求,具有原始交货日期的订单。 有序产品被分解成制造订购产品所需的一种或多种材料。 对于制造订购产品所需的至少一种材料,指定工程变更对材料生效的日期。 根据工程变更对材料生效的指定日期,创建备用材料清单。 创建了基于备用物料清单的替代制造计划。 基于替代制造计划启动制造。 如果生产可以按要求的交货日期及时完成交货,则订单的原始交货日期将替换为所要求的交货日期。