会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 46. 发明授权
    • Method and filling element for filling containers with a liquid filling material
    • 用液体填充材料填充容器的方法和填充元件
    • US08833407B2
    • 2014-09-16
    • US13521072
    • 2010-11-19
    • Ludwig ClüsserathDieter-Rudolf Krulitsch
    • Ludwig ClüsserathDieter-Rudolf Krulitsch
    • B67C3/02B67C3/28B67C3/26
    • B67C3/2608B67C3/286
    • A method for open jet filling containers with a liquid filling material using a filling element having a filling material path in its interior. The filling material flows through the path formed by a liquid channel during filling. The filling element comprises a liquid valve arranged in the path for controlled dispensing of the filling material at a dispensing opening. Closing the valve forms a drip-prevention structure that stops dripping of the filling material at the dispensing opening. The method includes forming the drip-prevention structure by closing the filling element, thereby causing relative movement between first and second structures. The first structure is either a valve body or a function element that moves with the valve body when the filling element closes. The second structure comprises part of an enclosing inner contour of the path. The drip-prevention structure is formed only when the filling element is closed.
    • 一种使用填充元件的液体填充材料的开放式喷射填充容器的方法,所述填充元件在其内部具有填充材料路径。 在填充期间,填充材料流过由液体通道形成的路径。 填充元件包括布置在路径中的液体阀,用于在分配开口处控制分配填充材料。 关闭阀形成防滴结构,其阻止在分配开口处的填充材料的滴落。 该方法包括通过关闭填充元件来形成防滴结构,由此引起第一和第二结构之间的相对移动。 第一结构是阀体或当填充元件关闭时与阀体一起移动的功能元件。 第二结构包括路径的封闭内轮廓的一部分。 仅在填充元件关闭时才形成防滴结构。
    • 48. 发明授权
    • Method of filling bottles or similar containers in a bottle or container filling plant and a filling system for filling bottles or similar containers in a bottle or container filling plant
    • 在瓶子或容器填充设备中填充瓶子或类似容器的方法以及用于在瓶子或容器填充设备中填充瓶子或类似容器的填充系统
    • US08701719B2
    • 2014-04-22
    • US12650083
    • 2009-12-30
    • Ludwig Clüsserath
    • Ludwig Clüsserath
    • B65B3/30B65B3/34
    • B67C3/20B67C3/007B67C3/28
    • A method for filling containers with liquid. Liquid is provided from a reservoir and at least two filling positions, of a filling position group, are each configured to fill a container with liquid at a filling rate. With a common flow meter, a total volume of liquid flowing into the containers at the filling positions of the filling position group is measured during a filling phase. A liquid control valve of each of the filling positions is opened and closed in response to: a measurement signal provided by the flow meter; and at least one of (a) and (b) where: (a) is a time correction compensating for filling rates being different for the filling positions; and (b) is at least one throttle influencing the filling rates. The containers at the filling positions are filled such that each of the containers contains a required volume of liquid at the end of the filling phase.
    • 一种用液体填充容器的方法。 从储存器提供液体,并且填充位置组的至少两个填充位置各自被配置为以填充率填充液体。 使用公共流量计,在填充阶段期间测量在填充位置组的填充位置处流入容器的液体的总体积。 响应于由流量计提供的测量信号,每个填充位置的液体控制阀被打开和关闭; 和(a)和(b)中的至少一个,其中:(a)是补偿填充位置不同的填充率的时间校正; 和(b)是影响填充率的至少一个节气门。 在填充位置处的容器被填充,使得每个容器在填充阶段结束时包含所需体积的液体。
    • 50. 发明授权
    • Filling system for filling beverage bottles in a beverage bottling plant
    • 饮料瓶装灌装系统
    • US08459315B2
    • 2013-06-11
    • US12624090
    • 2009-11-23
    • Ludwig ClüsserathDieter-Rudolf Krulitsch
    • Ludwig ClüsserathDieter-Rudolf Krulitsch
    • B65B1/04
    • B67C3/004B67C3/045
    • Container filling arrangement in which a first flow channel connects a first portion of a liquid channel, adjacent a liquid valve, and a collecting channel. A second flow channel connects the first flow channel and a second portion of the liquid channel adjacent a dispensing opening. A first valve in the first flow channel may be closed upon the liquid valve being opened during container filling, and is designed to be forced open by an increase to a first pressure in the first flow channel generated by a closing of the liquid valve. The second valve is designed to be closed until forced open by an increase to a second pressure, greater than the first pressure, in the first and second flow channels. The second pressure may be generated during a cleaning and/or sterilizing of the container filling arrangement.
    • 容器填充装置,其中第一流动通道连接液体通道的第一部分,邻近液体阀门和收集通道。 第二流动通道连接第一流动通道和与分配开口相邻的液体通道的第二部分。 第一流动通道中的第一阀可在液体阀在容器填充期间打开时关闭,并且被设计为通过增加到通过关闭液体阀产生的第一流动通道中的第一压力而被强制打开。 第二阀被设计为在第一和第二流动通道中增加到大于第一压力的第二压力而被强制打开。 在容器填充装置的清洁和/或灭菌期间可能产生第二压力。