    • 23. 发明授权
    • System for optimizing power generating unit
    • 优化发电机组的系统
    • US08068923B2
    • 2011-11-29
    • US12916773
    • 2010-11-01
    • Stephen Piche
    • Stephen Piche
    • G05D3/12G05B13/02
    • H02J3/38F23N2023/40F23N2023/44H02J2003/007Y02E40/76Y02E60/76Y04S10/545Y04S40/22
    • A method and apparatus for optimizing the operation of a single or multiple power generating units using advanced optimization, modeling, and control techniques. In one embodiment, a plurality of component optimization systems for optimizing power generating unit components are sequentially coordinated to allow optimized values determined by a first component optimization system to be fed forward for use as an input value to a subsequent component optimization system. A unit optimization system may be provided to determine goals and constraints for the plurality of component optimization systems in accordance with economic data. In one embodiment of the invention, a multi-unit optimization system is provided to determine goals and constraints for component optimization systems of different power generating units. Both steady state and dynamic models are used for optimization.
    • 一种使用先进优化,建模和控制技术优化单个或多个发电机组的运行的方法和装置。 在一个实施例中,用于优化功率产生单元组件的多个组件优化系统被顺序地协调,以允许由第一组件优化系统确定的优化值被提前向用作后续组件优化系统的输入值。 可以提供单元优化系统以根据经济数据确定多个部件优化系统的目标和约束。 在本发明的一个实施例中,提供多单元优化系统以确定不同发电单元的部件优化系统的目标和约束。 稳态和动态模型均用于优化。
    • 26. 发明授权
    • Model based sequential optimization of a single or multiple power generating units
    • 单个或多个发电机组的基于模型的顺序优化
    • US07599750B2
    • 2009-10-06
    • US11314214
    • 2005-12-21
    • Stephen Piche
    • Stephen Piche
    • G05D3/12G05B13/02
    • H02J3/38F23N2023/40F23N2023/44H02J2003/007Y02E40/76Y02E60/76Y04S10/545Y04S40/22
    • A method and apparatus for optimizing the operation of a single or multiple power generating units using advanced optimization, modeling, and control techniques. In one embodiment, a plurality of component optimization systems for optimizing power generating unit components are sequentially coordinated to allow optimized values determined by a first component optimization system to be fed forward for use as an input value to a subsequent component optimization system. A unit optimization system may be provided to determine goals and constraints for the plurality of component optimization systems in accordance with economic data. In one embodiment of the invention, a multi-unit optimization system is provided to determine goals and constraints for component optimization systems of different power generating units. Both steady state and dynamic models are used for optimization.
    • 一种使用先进优化,建模和控制技术优化单个或多个发电机组的运行的方法和装置。 在一个实施例中,用于优化功率产生单元组件的多个组件优化系统被顺序地协调,以允许由第一组件优化系统确定的优化值被提前向用作后续组件优化系统的输入值。 可以提供单元优化系统以根据经济数据确定多个部件优化系统的目标和约束。 在本发明的一个实施例中,提供多单元优化系统以确定不同发电单元的部件优化系统的目标和约束。 稳态和动态模型均用于优化。