会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 23. 发明授权
    • Method and apparatus for a construction site flooring system
    • 施工现场地板系统的方法和装置
    • US4462712A
    • 1984-07-31
    • US283830
    • 1981-07-16
    • Joe E. Penland, Sr.
    • Joe E. Penland, Sr.
    • E01C9/08E01C5/14
    • E01C9/086
    • A method and apparatus for the construction of a flooring system for use at a construction site such as an oil well drilling site. The flooring system is formed by interlocking a plurality of flooring units. Each of the flooring units includes a rectangular base section and a surface section attached to and overlaying the base section. One end of the rectangular base section is aligned with one end of the surface section which has at least one open-ended locking slot along its length. Located on the opposing end of the surface section is at least one locking tab formed from the surface section and projecting beyond and above the edge of the base section. The locking tab is aligned with the locking slot of the flooring unit. The method of constructing a flooring system utilizing such units includes positioning one unit, with the use of a lifting device such as a crane, adjacent to a second flooring unit and inserting the locking tab of the first unit into the adjacent second unit. By interlocking a plurality of such units, a flooring system is fabricated at a construction site which is strong enough to support heavy equipment, yet easily installed and removed.
    • 一种在诸如油井钻井现场的施工现场使用的地板系统的构造方法和装置。 地板系统通过联锁多个地板单元而形成。 每个地板单元包括矩形基部和附接到基部并覆盖基部的表面部分。 矩形基部的一端与表面部分的一端对准,该端部沿着其长度具有至少一个开口的锁定槽。 位于表面部分的相对端上的是至少一个从表面部分形成并且突出到基部的边缘之上和之上的锁定突片。 锁定片与地板单元的锁定槽对齐。 利用这种单元构造地板系统的方法包括使用与第二地板单元相邻的诸如起重机的提升装置来定位一个单元,并将第一单元的锁定片插入到相邻的第二单元中。 通过联锁多个这样的单元,在建筑工地上制造地板系统,其强度足以支撑重型设备,但容易安装和拆除。