会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 22. 发明授权
    • Fail-over method, computer system, management server, and backup server setting method
    • 故障转移方法,计算机系统,管理服务器和备份服务器设置方法
    • US07779297B2
    • 2010-08-17
    • US11872960
    • 2007-10-16
    • Yasuto NishiiYoshifumi TakamotoKeisuke Hatasaki
    • Yasuto NishiiYoshifumi TakamotoKeisuke Hatasaki
    • G06F11/00
    • G06F11/2046G06F11/2025G06F11/2038G06F11/2097
    • A management server obtains configuration information of an active server and creates a logical partition in a backup server so as to correspond to the active server. The backup server starts up the created logical partition. And when the created logical partition reaches a predetermined state, the backup server releases allocation of the first processor resource to the logical partition, thereby the logical partition stands by. The management server, when detecting an error occurred in the active server, stops the active server and searches the logical partition having same configuration as the active server in which error is detected, and enables allocation of the first processor resource to the searched logical partition, thereby completing the start-up of the logical partition.
    • 管理服务器获取活动服务器的配置信息,并在备份服务器中创建逻辑分区,以对应于活动服务器。 备份服务器启动创建的逻辑分区。 并且当创建的逻辑分区达到预定状态时,备份服务器将第一处理器资源的分配释放到逻辑分区,由此逻辑分区待命。 管理服务器在检测到活动服务器中发生错误时,停止活动服务器并搜索与检测到错误的活动服务器具有相同配置的逻辑分区,并启用将第一处理器资源分配给搜索到的逻辑分区, 从而完成逻辑分区的启动。
    • 23. 发明申请
    • METHOD FOR CONTROLLING ELECTRIC POWER OF COMPUTER SYSTEM
    • 控制计算机系统电力的方法
    • US20080294920A1
    • 2008-11-27
    • US11857794
    • 2007-09-19
    • Keisuke HatasakiYoshifumi TakamotoAkira Fujibayashi
    • Keisuke HatasakiYoshifumi TakamotoAkira Fujibayashi
    • G06F1/32G06F12/00
    • G06F1/3215G06F1/3221G06F1/3228G06F1/329Y02D10/154Y02D10/24
    • To reduce the electric power consumption of the computer system, the computer system includes at least one server and at least one data processing apparatus, the data processing apparatus includes an electric power consumption state control module by which electric power consumption of the data processing apparatus can be changed, obtains a use relationship between each server and each processing apparatus included in the computer system, monitors a change in a state of the server, searches for a related data processing apparatus in the use relationship with the server, obtains a state of at least one related server in the use relationship with the related data processing apparatus, and determines whether an electric power consumption state of the related data processing apparatus is to be changed or not based on the state of the related server, and changes the electric power consumption state of the related data processing apparatus.
    • 为了降低计算机系统的电力消耗,计算机系统包括至少一个服务器和至少一个数据处理装置,该数据处理装置包括:电力消耗状态控制模块,通过该电力消耗状态控制模块,数据处理装置的电力消耗可以 改变每个服务器和包括在计算机系统中的每个处理装置之间的使用关系,监视服务器状态的变化,以与服务器的使用关系搜索相关的数据处理装置,获得 与相关数据处理装置的使用关系中的至少一个相关服务器,并且基于相关服务器的状态来确定相关数据处理装置的电力消耗状态是否被改变,并且改变电力消耗 相关数据处理装置的状态。
    • 24. 发明申请
    • DISASTER RECOVERY METHOD FOR COMPUTER SYSTEM
    • 计算机系统的灾难恢复方法
    • US20080091746A1
    • 2008-04-17
    • US11693978
    • 2007-03-30
    • Keisuke HatasakiMasayoshi KitamuraYoshifumi Takamoto
    • Keisuke HatasakiMasayoshi KitamuraYoshifumi Takamoto
    • G06F12/16G06F11/16
    • G06F11/2033G06F11/2025G06F11/2028
    • A proposed fail over method for taking over task that is preformed on an active server to a backup server, even when the active server and the backup server have different hardware configuration. The method for making a backup server take over task when a fault occurs on a active server, comprises steps of acquiring configuration information on the hardware in the active server and the backup server, acquiring information relating the hardware in the backup server with the hardware in the active server, selecting a backup server to take over the task that is executed on the active server where the fault occurred, creating logical partitions on the selected backup server, and taking over the task executed on the active server logical partitions, in the logical partitions created on the selected backup server.
    • 即使活动服务器和备份服务器具有不同的硬件配置,也提出了一种用于接管在活动服务器上执行到备份服务器的任务的故障切换方法。 在主动服务器发生故障时,使备份服务器接管任务的方法包括以下步骤:获取主动服务器和备份服务器硬件上的配置信息,获取备份服务器硬件与硬件相关的信息 活动服务器,选择备份服务器以接管在发生故障的活动服务器上执行的任务,在所选备份服务器上创建逻辑分区,并接管在逻辑上的逻辑分区上执行的任务 在所选备份服务器上创建的分区。
    • 25. 发明申请
    • METHOD AND COMPUTER PROGRAM FOR REDUCING POWER CONSUMPTION OF A COMPUTING SYSTEM
    • 用于降低计算机系统功耗的方法和计算机程序
    • US20080065919A1
    • 2008-03-13
    • US11866896
    • 2007-10-03
    • Keisuke HatasakiTakao NakajimaYoshifumi Takamoto
    • Keisuke HatasakiTakao NakajimaYoshifumi Takamoto
    • G06F1/32G06F9/46
    • G06F1/3203G06F1/329G06F9/5088G06F9/5094Y02D10/22Y02D10/24Y02D10/32
    • In a computing system where multiple servers are connected through a network and one or more jobs are run, a power reduction facility of a supervisory server relocates jobs according to predetermined conditions, thereby reducing the amount of power consumed by the computing system. For relocating the jobs, the power reduction facility obtains server-related information such as the power properties of the servers constituting the computing system and job-related information such as performance requirements for the jobs which are run in the computing system, and searches for one or more jobs to be relocated and destination servers, based on these server-related information and job-related information, to the extent that the performance requirements for each job are fulfilled. Based on the search results, the jobs are relocated to the destination servers, and servers on which no job is running, in consequence of the relocation, are powered off.
    • 在通过网络连接多个服务器并运行一个或多个作业的计算系统中,监督服务器的功率降低设施根据预定条件重新定位作业,从而减少计算系统消耗的功率量。 为了重新定位作业,功率消耗设备获得服务器相关信息,例如构成计算系统的服务器的功率特性和与计算系统中运行的作业的性能要求相关的作业相关信息,并搜索一个 或更多的要迁移的作业和目标服务器,基于这些与服务器相关的信息和作业相关信息,以满足每个作业的性能要求。 根据搜索结果,将作业重新定位到目标服务器,由于重新定位而无作业正在运行的服务器已关闭。
    • 29. 发明授权
    • Take over method for computer system
    • 接管计算机系统的方法
    • US08296601B2
    • 2012-10-23
    • US13238937
    • 2011-09-21
    • Keisuke HatasakiMasayoshi KitamuraYoshifumi Takamoto
    • Keisuke HatasakiMasayoshi KitamuraYoshifumi Takamoto
    • G06F11/00
    • G06F11/2033G06F11/2025G06F11/2028
    • A proposed fail over method for taking over task that is preformed on an active server to a backup server, even when the active server and the backup server have different hardware configuration. The method for making a backup server take over task when a fault occurs on a active server, comprises steps of acquiring configuration information on the hardware in the active server and the backup server, acquiring information relating the hardware in the backup server with the hardware in the active server, selecting a backup server to take over the task that is executed on the active server where the fault occurred, creating logical partitions on the selected backup server, and taking over the task executed on the active server logical partitions, in the logical partitions created on the selected backup server.
    • 即使活动服务器和备份服务器具有不同的硬件配置,也提出了一种用于接管在活动服务器上执行到备份服务器的任务的故障切换方法。 在主动服务器发生故障时,使备份服务器接管任务的方法包括以下步骤:获取主动服务器和备份服务器硬件上的配置信息,获取备份服务器硬件与硬件相关的信息 活动服务器,选择备份服务器以接管在发生故障的活动服务器上执行的任务,在所选备份服务器上创建逻辑分区,并接管在逻辑上的逻辑分区上执行的任务 在所选备份服务器上创建的分区。