会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 21. 发明申请
    • LUMINOUS ELEMENT HAVING A PLURALITY OF CELLS
    • 具有多种细胞的发光元件
    • US20100059763A1
    • 2010-03-11
    • US12514770
    • 2007-12-07
    • Dae Won KimDae Sung Kal
    • Dae Won KimDae Sung Kal
    • H01L33/00
    • H01L25/0753H01L2224/48137
    • Disclosed is a light emitting element comprising a first array having a plurality of vertical light emitting cells connected in series on a single substrate; and a second array that has another plurality of vertical light emitting cells connected in series on the single substrate and is connected to the first array in reverse parallel. In the light emitting element, each of the vertical light emitting cells in the first and second arrays has a first electrode pad on a bottom surface thereof and a second electrode pad on a top surface thereof, and a connection portion is provided to electrically connect the first electrode pad of the vertical light emitting cell in the first array to the first electrode pad of the vertical light emitting cell in the second array.
    • 公开了一种发光元件,其包括具有在单个基板上串联连接的多个垂直发光单元的第一阵列; 以及第二阵列,其具有在单个衬底上串联连接并且反向并联连接到第一阵列的另外多个垂直发光单元。 在发光元件中,第一和第二阵列中的每个垂直发光单元在其底表面上具有第一电极焊盘,在其顶表面上具有第二电极焊盘,并且连接部分被设置为将 第一阵列中的垂直发光单元的第一电极焊盘到第二阵列中的垂直发光单元的第一电极焊盘。
    • 25. 发明授权
    • Test circuit of base station for mobile radio communication system
    • 移动无线电通信系统基站测试电路
    • US6128474A
    • 2000-10-03
    • US998774
    • 1997-12-29
    • Bo Jong KimDae Won Kim
    • Bo Jong KimDae Won Kim
    • G08C17/00H04B1/44H04B1/52H04B1/60H04B17/00H04W24/00H04B1/38
    • H04W24/00H04B17/103H04B17/29H04B1/44H04B1/52
    • A test circuit of a base station for use of a mobile radio communication system includes a terminal simulator for analyzing radio frequency signals provided from the base station and outputting the analyzed signals to an exam controller; a radio frequency signal path adjuster connected to the terminal simulator, for adjusting a combination and division of radio frequency signals, and a selection of a test path and a level of signals; and the exam controller connected with the radio frequency signal path adjuster, the terminal simulator and an upper level controller, the exam controller being for operating according to a test instruction of the upper level controller or controlling the radio frequency signal path adjuster and the terminal simulator to thereby execute a test and inform the upper level controller of the test result; whereby enabling the test circuit to be performed in a mutual test between sectors of the base station and an unmanned automation test.
    • 用于移动无线电通信系统的基站的测试电路包括用于分析从基站提供的射频信号并将分析的信号输出到检查控制器的终端模拟器; 连接到终端模拟器的射频信号路径调整器,用于调整射频信号的组合和分频,以及选择测试路径和信号电平; 检查控制器与射频信号路径调节器,终端模拟器和上位控制器连接,检查控制器根据上级控制器的测试指令进行操作,或控制射频信号路径调节器和终端模拟器 从而执行测试并通知上级控制器测试结果; 从而使得能够在基站的扇区和无人自动化测试之间的相互测试中执行测试电路。
    • 27. 发明授权
    • System for assessing an environmental load of building during life cycle
    • 生命周期中建筑物环境负荷评估系统
    • US08645183B2
    • 2014-02-04
    • US13110261
    • 2011-05-18
    • Sung Woo ShinHan Seung LeeSung Ho TaeDae Won KimYoung Jun ParkJung Soo ByunJang Ho AnJoo Ho LeeJun Seo Lee
    • Sung Woo ShinHan Seung LeeSung Ho TaeDae Won KimYoung Jun ParkJung Soo ByunJang Ho AnJoo Ho LeeJun Seo Lee
    • G06Q10/00
    • G06Q10/06313Y02P90/84
    • The present invention relates to an environmental load assessment system, which is capable of efficiently and simply assessing an environmental load of a building in all stages (e.g., a planning stage, a design stage, a construction stage, and a use stage after construction) in doing executing a business by subdividing an assessment process, such as simple assessment in the design stage, detailed assessment in the start stage, and site assessment in the construction stage according to the progress of a construction project. The system of the present invention includes a DB server for storing material information, environmental load information, and itemized material information about a construction work and storing environmental load information about an energy source; a management server for assessing environmental loads based on simple assessment, a detailed assessment, and site assessment according to the progress of a target assessment construction project; and a UI server for providing user terminals with an execution environment so that the management server can be operated.
    • 本发明涉及一种环境负荷评估系统,其能够在各个阶段(例如,规划阶段,设计阶段,施工阶段和施工阶段之后)有效地简单地评估建筑物的环境负荷, 根据建设项目的进展情况,在设计阶段进行简单评估,起步阶段详细评估,施工阶段现场评估等细分分析评估过程。 本发明的系统包括:DB服务器,用于存储材料信息,环境负载信息和关于建筑工作的分项材料信息,并存储关于能源的环境负载信息; 根据目标评估建设项目进展情况,简单评估,详细评估和现场评估,评估环境负荷的管理服务器; 以及用于向用户终端提供执行环境以便管理服务器可以被操作的UI服务器。
    • 30. 发明授权
    • Power management apparatus and method thereof and power control system
    • 电力管理装置及其方法和功率控制系统
    • US08341439B2
    • 2012-12-25
    • US12768511
    • 2010-04-27
    • Sun Wook KimDae Won KimSeong Woon Kim
    • Sun Wook KimDae Won KimSeong Woon Kim
    • G06F1/18G06F1/32
    • G06F9/5094Y02D10/22
    • A power management apparatus includes: a service request monitor block for receiving service requests by service groups to provide load information of service platforms belonging to the respective service groups; a platform information collection block for collecting a configuration information of the service platforms and collecting load information of the service platforms in a predetermined cycle; a platform power state alteration block for altering power states of the service platforms by request; and a management interface block for providing a setup interface for a load-based and a time-based power control and providing platform profile information generated based on the load information.
    • 电力管理装置包括:服务请求监视块,用于接收服务组的服务请求,以提供属于各服务组的服务平台的负载信息; 平台信息收集块,用于收集服务平台的配置信息,并以预定周期收集服务平台的负载信息; 用于通过请求改变服务平台的电源状态的平台电源状态改变块; 以及管理接口块,用于提供用于基于负载和时间的功率控制的设置接口,并提供基于负载信息生成的平台简档信息。