会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 22. 发明申请
    • LATER STAGE HYDROCARBON PRODUCTION PROCESSES
    • 后期石油生产工艺
    • US20170009562A1
    • 2017-01-12
    • US15205129
    • 2016-07-08
    • NEXEN ENERGY ULC
    • Julio SANCHEZJason Russell Bruce DICKSONSergio MERCHAN
    • E21B43/24E21B47/06E21B43/14E21B43/20E21B43/16
    • E21B43/2406E21B43/20E21B43/2408E21B43/305E21B47/065
    • A hydrocarbon production process comprising operating a first early stage hydrocarbon production process within a first communication domain with a first well pair, and operating a second early stage hydrocarbon production process within a second communication domain with a second well pair, such that an intermediate reservoir region including stranded bitumen becomes disposed between the first and second communication domains; wherein the first early stage hydrocarbon production process includes injecting a first production-initiating fluid via a first injection well of the first well pair into a first communication domain such that hydrocarbon material is mobilized and conducted to a first production well of the first well pair, and producing the received hydrocarbon material via the first production well; and wherein the second early stage hydrocarbon production process includes injecting a second production-initiating fluid via a second injection well of the second well pair into a second communication domain such that hydrocarbon material is mobilized and conducted to a second production well of the second well pair, and producing the received hydrocarbon material via the second production well; selecting a pre-selected zone within the reservoir, wherein the selecting is based upon temperature fall-off data within the first and second communication zones; and positioning a portion of an infill well within the pre-selected zone for receiving mobilized hydrocarbon material of at least the intermediate reservoir region and for producing the received hydrocarbon material.
    • 一种烃生产方法,包括在具有第一井对的第一通信区域内操作第一早期烃生产过程,以及在具有第二井对的第二通信域内操作第二早期烃生产过程,使得中间储层区域 包括搁置的沥青变得设置在第一和第二通信域之间; 其中所述第一早期烃生产过程包括通过所述第一井对的第一注入井将第一生产初始流体注入到第一通信区域中,使得烃材料被移动并传导到所述第一井对的第一生产井, 并通过第一生产井生产接收的烃材料; 并且其中所述第二早期烃生产过程包括通过所述第二井对的第二注入井将第二生产起始流体注入到第二连通区域中,使得烃材料被动员并被传导到所述第二井对的第二生产井 并通过第二生产井生产接收的烃材料; 在所述储存器内选择预选区域,其中所述选择基于所述第一和第二通信区域内的温度下降数据; 以及将填充物的一部分良好地定位在预选区域内,用于接收至少中间储层区域的移动的烃材料并用于生产接收的烃材料。
    • 30. 发明申请
    • PROCESSES FOR HYDRAULIC FRACTURING
    • 液压破碎过程
    • US20160290112A1
    • 2016-10-06
    • US14677298
    • 2015-04-02
    • NEXEN ENERGY ULC
    • James Frederick PYECROFTPeter CHERNIKJurgen LEHMANNDavid MEEKS
    • E21B43/26E21B49/00E21B43/116E21B43/14
    • E21B43/26E21B43/11E21B43/116E21B43/14E21B49/00
    • There is provided a process of stimulating a subterranean formation via a wellbore fluid passage of a cased wellbore. The process includes, with a perforating gun, perforating at least casing to form at least one or more perforations effecting fluid communication, via the wellbore fluid passage, between a first zone of the subterranean formation and a treatment fluid source. Treatment fluid is then injected via the wellbore fluid passage, from the treatment fluid source to the first zone such that fracturing of the first zone is effected. The injecting of the treatment fluid is then suspended. A perforating gun is then deployed within the wellbore fluid passage via wireline. The casing is then perforated to form at least one or more perforations effecting fluid communication, via the wellbore fluid passage, between a second zone of the subterranean formation and the treatment fluid source. While both of the first zone and the second zone are disposed in fluid communication, via the wellbore fluid passage, with the treatment fluid source, injecting treatment fluid from the treatment fluid source and into the wellbore fluid passage with effect that at least a fraction of the injected treatment fluid is directed to the second zone such that fracturing of the second zone is effected.
    • 提供了一种通过套管井筒的井筒流体通道刺激地下地层的过程。 该过程包括穿孔枪,至少穿孔套管,以形成经由井眼流体通道在地下地层的第一区域和处理流体源之间流体连通的至少一个或多个穿孔。 然后将处理流体经由井眼流体通道从处理流体源注入到第一区域,使得实现第一区域的压裂。 然后停止注射治疗液。 然后将穿孔枪通过电缆布置在井筒流体通道内。 然后将套管穿孔以形成经由井筒流体通道在地层的第二区域和处理流体源之间流体连通的至少一个或多个穿孔。 当第一区域和第二区域都通过井眼流体通道与处理流体源流体连通地设置时,将处理流体从处理流体源注入到井筒流体通道中,其效果在于至少一部分 注射的处理流体被引导到第二区域,从而实现第二区域的压裂。