会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明申请
    • TURBOCHARGER AND SHIP
    • TURBOCHARGER和船舶
    • US20160356206A1
    • 2016-12-08
    • US15106238
    • 2015-02-23
    • Mitsubishi Heavy Industries, Ltd.
    • Yukio YamashitaMusashi SakamotoYoshihisa Ono
    • F02B37/04F02B33/00H02P27/06F02B39/10
    • F02B37/04F01N5/04F02B33/00F02B37/10F02B39/10F02D29/06F02D41/0007H02P27/06Y02T10/144Y02T10/16
    • A control unit (40) controls a first power converter so as to make the speed of a motor/generator coincide with a prescribed speed command. A speed command (N*) set by an upper stream control system (50) is inputted to a smoothing unit (41) of the control unit (40). In the smoothing unit (41), the speed command (N*) is smoothed by a first-order lag element (46), and the rate of change is limited by a rate limiter (48) to a prescribed value or less. For the speed command (Ns*) outputted from the smoothing unit (41), the difference (ΔN) from the actual speed (N) of the motor/generator is calculated in a difference calculator, a control command (S) based on this difference (ΔN) is generated in a control signal generator (43), and the first power converter is controlled on the basis of this control command (S). Fluctuations in the supply of power to the electric motor are thereby suppressed.
    • 控制单元(40)控制第一功率转换器以使电动机/发电机的速度与规定的速度指令一致。 由上游控制系统(50)设定的速度指令(N *)被输入到控制单元(40)的平滑单元(41)。 在平滑单元(41)中,通过一阶滞后元件(46)对速度指令(N *)进行平滑,并且将速率限制器(48)限制在规定值以下。 对于从平滑单元(41)输出的速度指令(Ns *),在差分计算器中计算与马达/发电机的实际速度(N)的差(ΔN),基于该计算器的控制命令(S) 在控制信号发生器(43)中产生差(ΔN),并且基于该控制命令(S)来控制第一功率转换器。 由此抑制向电动机供电的波动。