会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 방진상자형 방진침목의 교체시공을 위한 방진침목
    • KR102416416B1
    • 2022-07-04
    • KR1020200064888
    • 2020-05-29
    • E01B29/05E01B1/00
    • 개시된내용은, 래티스철근구조체를포함하는하부가콘크리트도상에대해고정결합됨에따라철도차량의통행에따른하중이나충격이래티스철근구조체에의해지지및 흡수가능하고, 상부에는통상의레일패드이외에탄성패드까지포함된방진부가적용됨에따라육안관찰만으로도방진부의손상이나파손정도의파악이용이할뿐만아니라최소비용으로유지보수가신속용이하게이루어질수 있도록한 방진상자형방진침목의교체시공을위한방진침목에관한것이다. 개시된내용은콘크리트도상의홈 내에기 설치된방진상자형방진침목을대체하여교체시공되는방진상자형방진침목의교체시공을위한방진침목에있어서, 하부는상기방진상자형방진침목이제거된상기콘크리트도상의홈 내에몰탈그라우트에의해삽입고정되고내부에는앵커소켓이매립고정되며상부면에는양측에돌출형성되는결착돌출부에의해안착면이형성되는콘크리트침목블럭과, 상기콘크리트침목블럭의하부에 1쌍이이격되어횡방향으로나란히배열되고상부는상기콘크리트침목블럭에매립고정되며하부는상기콘크리트침목블럭으로부터돌출되고상기방진상자형방진침목이제거된상기콘크리트도상의홈 내에상기콘크리트침목블럭의하측과함께몰탈그라우트에의해삽입고정되는래티스철근구조체와, 상기콘크리트침목블럭의안착면에적층되는탄성패드와, 상기탄성패드상에적층되고상부면중앙에는안착홈이형성되는베이스플레이트와, 상기베이스플레이트의안착홈에적층되고레일이안착지지되는레일패드와, 상기베이스플레이트의양측에설치되는측면지지가이드패널과, 상기베이스플레이트의양측과상기측면지지가이드패널상에설치되어상기레일의하부양측을가압지지하는탄성클램프와, 상기베이스플레이트의양측을관통하여상기앵커소켓에체결되면서상기탄성클램프를가압지지하는체결볼트를포함하는것을특징으로하는방진상자형방진침목의교체시공을위한방진침목을일 실시예로제시한다.
    • 4. 发明授权
    • 콘크리트도상에 설치된 목침목 분기기를 RC침목 분기기로 바꾸기 위한 교체 시공방법
    • KR102240816B1
    • 2021-04-15
    • KR1020200180101
    • 2020-12-21
    • 주식회사 세안
    • 김태한권호진이남수김동연
    • E01B29/05E01B29/10E01B1/00E01B19/00
    • 본발명은콘크리트도상에설치된목침목분기기를 RC침목분기기로바꾸기위한교체시공방법에관한것으로, 그목적은레일의이동및 콘크리트도상의제거를최소화하면서콘크리트도상의목침목분기기에설치된목침목을 RC침목으로갱환할수 있도록한 교체시공방법을제공함에있다. 이를위한본 발명은콘크리트도상에설치된목침목분기기의목침목과레일을결속하고있는체결장치를해체하는단계(S10); 목침목및 방진상자를제거하는단계(S20); 목침목및 방진상자의제거로인해노출된홈부의바닥면과측면을치핑하는단계(S30); 상기홈부의내면과새로설치될 RC침목의바닥면에콘크리트신구접착제를도포하는단계(S40); RC침목을홈부와레일사이의공간을활용하여레일의하부에배치하고, RC침목과레일을체결장치로결속하는단계(S50); 상기 RC침목의좌우측으로돌출된철근가닥의움직임을상부및 전후에서제한하는결속구가 RC침목의좌우에위치하도록콘크리트도상에설치하는단계(S60); 및결속구의설치가완료된후, 초속경몰탈을홈부에주입하되, 초속경몰탈이콘크리트도상의도상면까지차오르도록초속경몰탈을타설하는단계(S70);로이루어진것을특징으로하는콘크리트도상에설치된목침목분기기를 RC침목분기기로바꾸기위한교체시공방법을제공한다.
    • 5. 实用新型
    • 철도레일 운반용 지그
    • 铁路运输夹具
    • KR2020160000258U
    • 2016-01-22
    • KR2020140005286
    • 2014-07-14
    • 궤도공영 주식회사동원궤도(주)(주)대륙철도
    • 김정구
    • E01B29/05E02F5/00
    • E01B29/05E02F5/00
    • 철도레일운반용지그가개시된다. 본고안의일 실시예에따른철도레일운반용지그는포크레인헤드에장착되는연결부; 상기연결부로부터일정한길이로형성되는지지부; 및상기지지부의끝단에서철도레일을클램핑하는클램핑부를포함하되; 상기연결부는상기지지부의길이방향과나란한방향으로서로이격되어설치되는제1고정판과제2고정판; 및상기지지부의길이방향과직교하는방향으로상기제1고정판과상기제2고정판사이에고정되고, 상기포크레인헤드의결합구에장착되는한 쌍의고정핀을포함하고, 상기클램핑부는상기지지부의끝단에연결되는와이어; 상기와이어에연결된고리에힌지결합되는한 쌍의상부링크; 상기한 쌍의상부링크의단부에힌지결합되며, 상호 X자로교차되고, 교차되는부분은힌지결합되는한쌍의하부링크를포함하고, 상기하부링크는하단부에절곡되어형성되고상기철도레일의레일헤드에걸 수있는걸쇠를포함한다.
    • 7. 发明公开
    • 소정 범위의 철도를 형성하기 위한 방법 및 조정 설비
    • 用于生产铁路的方法和调整安装
    • KR1020080075852A
    • 2008-08-19
    • KR1020087013255
    • 2006-10-31
    • 코닌크리지케 밤 그로에프 엔.브이.프라이데러 인프라스트룩투르테케닉 게엠베하 운트 컴파니 케이지
    • 빈테르테오
    • E01B29/05E01B29/02E01B1/00
    • E01B1/004E01B29/02
    • A method of laying a section of railway track comprising a railway track as well as foundations on which the railway track is supported, comprises the following stages: the creation of the foundations-the creation of a system of a series of sleepers as well as rails by means of which the sleepers are held in parallel and at a distance from each other,-the creation of a adjusting installation, the laying of the system by way of the adjusting installation,-the supporting with regard to the foundations, by way of secondary support means, such as spindles, of the system in the position set out by the adjusting installation,-the removal of the adjusting installation, the pouring of a hardenable concrete between the series of sleepers of the system and the foundations,-the hardening of the hardenable concrete in order to create a connection between the sleepers of the system and the foundations,-implementing the pouring and hardening of the hardenable concrete while the sleepers interact with the rails and after the adjusting installation has been removed. An accurate end result can be achieved by the stages of:-removing the rails from the series of sleepers of the system after the concrete has hardened,-thereafter applying continuous rails to the series of sleepers of the system.
    • 一条铺设一条铁路轨道的方法,包括铁路轨道以及铁路轨道支撑的基础,包括以下阶段:创建基础 - 创建一系列轨枕以及轨道系统 通过这些方式,睡眠者彼此平行并且彼此相隔一定距离, - 创建调整装置,通过调节装置铺设系统, - 对基础的支持,通过 由调节装置设置的位置的系统的辅助支撑装置,例如主轴, - 调整装置的拆卸,系统的轨枕和基座之间的可硬化混凝土的浇注, - 硬化 的可硬化混凝土,以便在系统的睡眠者和基础之间建立连接,并且在枕木相互作用的同时实现可硬化混凝土的浇注和硬化 h轨道和调整安装被移除后。 可以通过以下阶段实现准确的最终结果: - 在混凝土硬化之后 - 从系统的一系列轨枕移除轨道,然后在系统的一系列轨枕上应用连续的轨道。
    • 8. 发明授权
    • 콘크리트도상 궤도의 방진침목 교체시공방법
    • KR102416415B1
    • 2022-07-04
    • KR1020200062511
    • 2020-05-25
    • E01B29/05E01B1/00E01B19/00
    • 개시된내용은방진특성과전체적인내구성이향상됨과동시에철도차량이주행하지않는야간을이용하여단시간내에신속하면서도정밀하게방진침목의교체시공이이루어질수 있도록한 콘크리트도상궤도의방진침목교체시공방법에관한것이다. 개시된내용은콘크리트도상에설치된기존방진침목을교체시공하기위한콘크리트도상궤도의방진침목교체시공방법에있어서, 일정길이구간의레일체결구를해체하고양측의레일을들어올려레일거치용스탠드상에거치하는제 1 단계와, 상기기존방진침목중 홀수위치의기존방진침목을제거한후 상기기존방진침목이설치되었던홈을청소하는제 2 단계와, 상기홈 내에사전제조된매립형방진침목을배열하는제 3 단계와, 양측의레일을짝수위치의기존방진침목상으로내려다시체결고정하고상기매립형방진침목의일측에상기레일을일정높이로지지하는레일지지용스탠드를설치하는제 4 단계와, 상기매립형방진침목을들어올려상기홈 내에공간이형성되도록한 후상기매립형방진침목을레일에체결고정하는제 5 단계와, 상기홈 내에몰탈그라우트를채우고경화시키는제 6 단계와, 상기몰탈그라우트의경화후에상기레일지지용스탠드를철거하는제 7 단계와, 상기제 1 단계내지상기제 7 단계를짝수위치의기존방진침목에대해반복하는제 8 단계를포함하는것을특징으로하는콘크리트도상궤도의방진침목교체시공방법을일 실시예로제시한다.