会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 기능성 그라우트 조성물과 이를 이용한 지반안정화 공법
    • 用于稳定地面和锚固方法的用于钉子,锚固器,岩石螺栓的GROUT组合物
    • KR101328402B1
    • 2013-11-13
    • KR1020130017841
    • 2013-02-20
    • 윤택규윤홍기손우흥주식회사 선인씨엔아이
    • 김영수신정숙권현오손우흥윤택규윤홍기
    • C04B18/04C04B28/12C04B14/34C09K17/02
    • Y02W30/91C09K17/42C04B16/02C04B18/08C04B18/141C04B20/008C04B22/148C04B24/383C04B2111/70E02D5/80E02D29/0233
    • The present invention relates to a functional grout composition and a ground stabilization method using the same. The purpose of the present invention is to provide a functional grout composition for injection to a nail, an anchor, or a lock bolt for ground stabilization, and a ground stabilization method using the same which is capable of firmly settling the nail, the anchor, or the lock bolt even in case of underwater placement and winter time placement by forming the grout composition for injection to the nail, the anchor, or the lock bolt composed of early strength injection mortar and rapid hardening underwater non-segregation mixture. According to the present invention, a grout composition composed of 1-8 parts by weight of rapid hardening underwater non-segregation mixture, based on 100 parts by weight of early strength injection mortar is injected and filled into a hole into which a nail, an anchor, or a lock bolt is inserted. The early strength injection mortar comprises: 80-100 parts by weight of granulated blast furnace slag powder, 20-50 parts by weight of cement, 10-20 parts by weight of quicklime, 0.01-0.3 parts by weight of aluminum powder, 80-100 parts by weight of silica, and 1-3 parts by weight of plasticizer, based on 100 parts by weight of fly ash. The rapid hardening underwater non-segregation mixture comprises: 5-10 parts by weight of aluminum sulfate, 1-3 parts by weight of thickener, 0.1-1 parts by weight of stabilizer, 2-5 parts by weight of cellulose fiber, and 1-3 parts by weight of plasticizer.
    • 本发明涉及功能性灌浆组合物和使用其的地面稳定化方法。 本发明的目的是提供一种用于注射到钉子,锚固件或用于地面稳定的锁定螺栓的功能性灌浆组合物,以及使用该功能性的灌浆组合物,其能够牢固地固定钉子,锚固件, 或者即使在水下放置和冬季时间的情况下也可以通过将注射用的注浆用组合物形成到钉子,锚杆或由早强注射砂浆和快速硬化水下非分离混合物组成的锁定螺栓的情况下的锁定螺栓。 根据本发明,将基于100重量份的早期强度注射砂浆的1-8重量份的快速硬化水中非分离混合物组成的灌浆组合物注入并填充到钉子, 锚杆或锁定螺栓插入。 早期强度注射砂浆包括:80-100重量份颗粒高炉渣粉,20-50重量份水泥,10-20重量份生石灰,0.01-0.3重量份铝粉,80〜 基于100重量份的飞灰,100重量份的二氧化硅和1-3重量份的增塑剂。 快速硬化的水下非偏析混合物包括:5-10重量份的硫酸铝,1-3重量份的增稠剂,0.1-1重量份的稳定剂,2-5重量份的纤维素纤维和1 -3重量份的增塑剂。
    • 4. 实用新型
    • 창틀고정형 호이스트 장치
    • 窗框固定式提升机
    • KR2020170003422U
    • 2017-10-12
    • KR2020160001583
    • 2016-03-24
    • 윤택규윤홍기
    • 윤택규윤홍기
    • B66C23/22E04G21/16E06B7/28B66D1/12B66D1/30
    • 본고안은창틀고정형호이스트장치에관한것으로, 그목적은창틀에고정하여건축자재및 작업공구등의화물을안전하고신속하고안전하게작업현장으로이송시켜작업안전성을확보하고작업능률성을향상시킬수 있는창틀고정형호이스트장치를제공하는것이다. 본고안에따른호이스트장치는, 창틀의상부프레임에고정설치되는상단고정부와, 창틀의하부프레임에고정설치되는하단고정부와, 하단고정부에연직되도록고정설치되는수직스크류와, 수직스크류에나사결합되어승하강이동되는승하강핸들과, 승하강핸들에하단이접촉지지되고, 상단이상단고정부에고정설치되는수직지지대와, 수직지지대를직교하도록관통하여설치되고, 양끝단에도르래가설치된수평지지대와, 수직지지대에고정설치되어권취기가설치되는고정판을포함한다.
    • 本文的目的是提供一种窗框固定系统,通过将建筑材料和作业工具等货物安全,快速,安全地固定在窗框上,将作业现场转移到工作现场,从而确保作业安全。 由此提供起重装置。 根据该物品是,与上固定部被固定至窗户框架的上框架,和下侧固定部被固定到窗框的下框架卷扬机装置,垂直螺钉牢固地固定在下部固定部垂直,以及用于垂直螺旋螺杆 垂直支撑杆由升降手柄的下端支撑,使得手柄的下端由升降手柄的下端支撑, 并且固定板固定在垂直支架上并设有一个卷绕单元。
    • 5. 发明公开
    • 사면 녹화의 시공 방법
    • 斜坡植被的施工方法
    • KR1020140074579A
    • 2014-06-18
    • KR1020120142683
    • 2012-12-10
    • 윤택규윤홍기주식회사 지오기술단
    • 김영수신정숙윤홍기윤택규
    • E02D17/20A01G9/02A01G25/06
    • E02D17/20A01G9/025A01G25/06E02D2200/13E02D2300/0034E02D2300/0039
    • The present invention provides a construction method for slope vegetation which comprises a construction site rearrangement process (S1) for rearranging a slope to be constructed; a set net installation process (S2) for covering the construction site with a set net; a wire installing and fixing process (S3) for installing wires to form a lattice shape on the set net and using fixing pins to fix the crossing points and ends of the wires on a slope; a piping process (S4) for installing a main pipe to protrude from the side lower part or the bottom of each collecting well of the slope toward the front of the slope, installing distributing pipes from the main pipe on the left and right sides of the slope, and installing multiple diversion pipes, which have multiple blowholes passing therethrough, to be connected to the distribution pipes, wherein the diversion pipes are slantly installed from the distribution pipes to the lower part of the slope; and a soil spreading process (S5) for spreading soil including seeds and yarn fibers at the same time on the slope where the set net and the wires are installed. The construction method is provided to supply water in a collecting well through a main pipe and distributing pipes along slantly installed diversion pipes to a spout hole and to discharge the water through the spout hole over the slope, thereby facilitating germination of seeds and growth of plants.
    • 本发明提供一种斜坡植被的施工方法,其特征在于,包括用于重新构造斜坡的施工现场重排工序(S1) 一套用网覆盖施工现场的网安装工艺(S2); 电线安装和固定过程(S3),用于在组网上安装电线以形成格子形状,并使用固定销将电线的交叉点和端部固定在斜面上; 用于安装主管从斜坡的各收集井的侧下部或底部朝向斜坡的前方安装的管道过程(S4),在主管的左侧和右侧安装分配管 倾斜,并安装多个通过其的气孔的分流管连接到分配管,其中分流管从分配管倾斜安装到斜坡的下部; 以及在安装网和电线的斜坡上同时撒播包括种子和纱线纤维的土壤的土壤扩散过程(S5)。 提供施工方法,通过主管将收集井中的水供给,并沿着倾斜安装的导流管将管道分配给喷口,并通过斜坡上的喷口排放水,从而促进种子的发芽和植物的生长 。
    • 6. 发明授权
    • 심부시추시스템과 이를 이용한 시추공법
    • 深钻系统和使用它的钻孔方法
    • KR101752676B1
    • 2017-06-30
    • KR1020160025048
    • 2016-03-02
    • 윤택규윤홍기
    • 윤택규윤홍기
    • E21B6/00E21B4/02E21B4/14E21B19/02F24J3/08
    • 본발명은심부시추시스템과이를이용한시추공법에관한것으로, 그목적은심부를천공하여 100℃이상의심부지열을이용할수 있는심부시추시스템과이를이용한시추공법을제공하는것이다. 본발명은심부시추를위한심부시추시스템에있어서; 로프에의해비트회전구동부와비트타격부및 비트부가시추홀을따라승하강되고, 동력물관을통해공급되는고압수에의해비트회전구동부가비트타격부및 비트부를회전구동시킴과동시에, 비트타격부내에서워터햄머가비트부를타격하여비트부의회전및 가압에의해시추가이루어지도록되어있다.
    • 本发明涉及到使用相同的和深系统钻孔钻孔方法,其目的是提供一种使用可通过钻出深使用至少100℃深层地钻孔中的相同一个深井钻探系统和方法。 本发明涉及用于深钻的深钻系统; 通过绳索位旋转驱动至位撞击部分和位附加并沿着钻孔升降,同时旋转驱动锡金通过经由功率博物馆供给的高压水的位旋转驱动位击球部和位部分,位撞击部 水锤撞击钻头部分并通过旋转和按压钻头部分而被添加。
    • 7. 发明授权
    • 자중식 지반밀착형 인발저항콘과 이를 이용한 지반보강공법 및 지반보강장치
    • 地基加固装置及使用该地基加固方法
    • KR101552466B1
    • 2015-09-10
    • KR1020140166218
    • 2014-11-26
    • 윤택규윤홍기
    • 윤택규윤홍기
    • E02D5/80E02D3/12E02D17/20
    • E02D5/80E02D3/12E02D17/20E02D2250/003E02D2600/30
    • 본 발명은 자중식 지반밀착형 인발저항콘과 이를 이용한 지반보강공법 및 지반보강장치에 관한 것으로, 목적은 간단한 구성을 구비하여 제조가 용이하고, 천공홀 내벽과의 마찰력을 발생시켜 지지체의 인발저항력을 증진시키며, 이를 통해 지반을 효율적으로 보강할 수 있는 자중식 지반밀착형 인발저항콘과 이를 이용한 지반보강공법 및 지반보강장치를 제공하는 것이다.
      본 발명은 나팔관 형상의 지지홀이 선단면에서 후단면을 관통하도록 형성된 본체와, 상기 본체의 지지홀 하측에 위치하도록 본체로부터 후단방향(B)으로 돌출형성된 무게지지체와, 상기 본체의 상단에 위치하도록 형성된 상측돌기부와, 상기 본체 및 무게지지체의 하측에 위치하도록 형성된 하측돌기부를 포함하는 인발저항콘을 지지체에 설치하여 지반을 보강하도록 되어 있다.
    • 本发明涉及一种使用自身重量的具有抗拉力的地面粘附型锥体及其地面加固方法及使用其的装置,其中具有使用其自重的抗拉性的地面粘附型锥体具有易于制造的简单结构, 为了有效地加强地面,增加与钻孔内壁摩擦力的支撑件的阻力。 使用其自重的具有抗拉力的地面粘附型锥体包括:主体,包裹管状的支撑孔通过该主体从前端到后端穿过; 从所述主体朝向所述后端(B)突出的重物支撑体,以被放置在所述主体的所述支撑孔的下方; 位于主体顶部的上部突起; 以及放置在主体和重量支撑件下方的下突起。 因此,使用其自身重量的具有抗拉强度的地面附着型锥体在安装在支撑件上时增强了地面。
    • 8. 发明授权
    • 사면 녹화의 시공 방법
    • 边坡植被的施工方法
    • KR101437840B1
    • 2014-09-04
    • KR1020120142683
    • 2012-12-10
    • 윤택규윤홍기주식회사 지오기술단
    • 김영수신정숙윤홍기윤택규
    • E02D17/20A01G9/02A01G25/06
    • 본 발명은 사면 녹화의 시공 방법은, 시공할 사면을 정리하는 시공지 정리 공정(S1); 고정망을 시공지를 덮도록 설치하는 고정망 설치 공정(S2); 설치한 고정망 상부를 와이어로 격자로 설치하고, 와이어의 교차 지점과 와이어의 끝 부분을 고정핀으로 사면에 고정하는 와이어 설치 및 고정 공정(S3); 사면의 각 집수정 측면 하부나 바닥에서 사면 앞쪽으로 돌출되게 메인관을 설치하고, 그 메인관에서 사면에 좌우 방향으로 분배관을 설치하며, 관통된 분수공이 다수개 형성한 분수관을 분배관에 연결되게 다수개 설치하되, 사면 하부까지 설치되는 분수관은 사선 방향으로 설치하는 배관 공정(S4); 고정망과 와이어가 설치된 사면에 종자가 포함된 흙과 섬유사를 동시에 포설하는 흙 포설 공정(S5)으로 사면의 녹화 시공이 완료되어, 집수정의 물이 메인관과 분배관을 거쳐 사선으로 설치된 분수관을 따라 이동하면서 분수공으로 물을 배출하여 사면에 고르게 물을 공급하여, 종자의 발아와 식물의 생육을 용이하게 하는 사면의 녹화 시공 방법에 관한 것이다.
    • 9. 发明授权
    • 사면 녹화용 실 분사 장치 및 그 실 분사 장치를 이용한 사면 녹화 공법
    • 斜坡植被干螺纹注射装置及其斜坡施工方法
    • KR101372174B1
    • 2014-03-07
    • KR1020130031073
    • 2013-03-22
    • 윤택규윤홍기
    • 김영수신정숙윤홍기윤택규
    • E02D17/20A01G1/00B05B13/02E02D5/80A01B77/00
    • E02D17/20A01B77/00A01G20/20B05B13/0207E02D5/80E02D2200/13
    • The present invention relates to a thread injection device for planting a slope, which has a hollow chamber and a cover part for sealing the chamber, and a method for planting a slope using the same to prevent the loss of soil by planting a slope through: a construction site arranging and equipment setting process (S1) to arrange the slope to be planted, to put a thread wound on a bobbin into the chamber, to put each thread into an outlet pipe through a ring, to seal the chamber with the cover part, to connect an air compressor for supplying compressed air to an input pipe, and setting a mounting device for mounting soil; a loss prevention process (S4) to install multiple loss prevention anchors on the slope; and a thread and soil mounting process (S5) to mount the thread and the soil on the slope, to inject the thread using the thread injection device by operating the air compressor, and to mount soil containing seeds on the slope using the mounting device.
    • 本发明涉及一种用于种植斜坡的螺纹注射装置,该斜面具有中空室和用于密封该室的盖部分,以及一种用于种植斜坡的方法,以通过以下方式种植斜坡来防止土壤的损失: 一个施工现场布置和设备设置过程(S1),以布置要种植的坡度,将线圈缠绕在筒管上,将每个螺纹通过环放入出口管中,以将盖与盖密封 连接用于将压缩空气供给到输入管的空气压缩机,并设置用于安装土壤的安装装置; (S4)在斜坡上安装多个防损锚点; 以及将螺纹和土壤安装在斜坡上的螺纹和土壤安装工艺(S5),通过操作空气压缩机使用螺纹注入装置注入螺纹,并使用安装装置将含有种子的土壤安装在斜坡上。