会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • 폭열 방지용 내열성 섬유를 이용한 고강도 원심성형 콘크리트 기둥구조 및 그 제조방법
    • 高强度混凝土柱使用耐热纤维防止粉尘及其制造方法
    • KR1020140065893A
    • 2014-05-30
    • KR1020120132916
    • 2012-11-22
    • 대림산업 주식회사대림씨엔에스(주)주식회사 한빛구조엔지니어링
    • 송영찬김태호이정배최선영안지희목진오하창용
    • E04C3/34E04C5/07
    • The present invention relates to a high-strength centrifugal casting concrete column structure using heatproof fiber for preventing spalling and a manufacturing method thereof, and, more specifically, to a high-strength centrifugal casting concrete column structure using heatproof fiber for preventing spalling and a manufacturing method thereof which are to mix high-strength concrete for preventing spalling and to restrain the temperature of reinforcing bars inside the concrete from rising, wherein the high-strength concrete for preventing spalling is applied with heatproof fiber which is not melted even during autoclave curing used to reduce the manufacturing time of a high-strength centrifugal casting concrete column. The high-strength centrifugal casting concrete column according to the present invention has the heatproof fiber (2) mixed therein, wherein the heatproof fiber (2) not melted in high-temperature steam curing performed during centrifugal casting is melt in case of fire, so that a path for discharging moisture is formed, and, as a result, the spalling can be effectively prevented by effectively discharging the moisture, which is generated from evaporated moisture inside the column (1), to the outside.
    • 本发明涉及使用耐热纤维防止剥落的高强度离心铸造混凝土柱结构及其制造方法,更具体地,涉及使用耐热纤维防止剥落和制造的高强度离心浇铸混凝土柱结构 混合高强度混凝土以防止剥落并限制混凝土内部钢筋温度升高的方法,其中用于防止剥落的高强度混凝土施加于即使在高压釜固化期间也不熔化的耐热纤维 以减少高强度离心铸造混凝土柱的制造时间。 根据本发明的高强度离心铸造混凝土柱具有混合在其中的耐热纤维(2),其中在离心铸造期间进行的高温蒸汽养护中未熔化的耐热纤维(2)在发生火灾时熔化,因此 形成用于排出水分的路径,结果,通过有效地将从塔(1)内的蒸发水分产生的水分有效地排出到外部,可以有效地防止剥落。
    • 6. 发明公开
    • 고강도 다각형 원심성형 기둥과 철골보의 접합구조
    • 高强度多边形离心柱和钢丝绳之间的连接结构
    • KR1020130031980A
    • 2013-04-01
    • KR1020110095589
    • 2011-09-22
    • 대림산업 주식회사대림씨엔에스(주)주식회사 한빛구조엔지니어링
    • 김욱종김태호이정배최선영안지희목진오하창용
    • E04B1/30E04B1/38E04B1/58
    • PURPOSE: A connection structure of a high intensity polygonal centrifugal precast column and a steel beam is provided to supply the connection structure which is structurally safe and is conveniently constructed without an additional external diaphragm. CONSTITUTION: A connection structure of a high intensity polygonal centrifugal precast column(10) and a steel beam(20) comprises as follows. A fixing pin(24) is extended to the front on the end of a web(21) of the steel beam, and an upper and a lower flange(22,23) of the steel beam comprises brackets(25,26). A connection hole(13) and a penetration hole(14) are formed on the circumference of the high intensity polygonal centrifugal precast column. The steel beam is fixed to the circumference of the column using a fixed bar(30) fixed to an upper and a lower bracket through the penetration hole.
    • 目的:提供高强度多边形离心预制柱和钢梁的连接结构,以提供结构安全的连接结构,方便地构建而无需额外的外部隔膜。 构成:高强度多边形离心预制柱(10)和钢梁(20)的连接结构如下。 固定销(24)在钢梁的腹板(21)的端部延伸到前部,钢梁的上和下凸缘(22,23)包括托架(25,26)。 在高强度多边形离心预制柱的圆周上形成连接孔(13)和贯通孔(14)。 钢梁使用固定杆(30)固定在柱的圆周上,固定杆(30)通过穿透孔固定到上托架和下支架上。
    • 7. 发明公开
    • 다각형상을 가진 원심성형기둥
    • 离心预制混凝土柱与多边形状
    • KR1020130031975A
    • 2013-04-01
    • KR1020110095580
    • 2011-09-22
    • 대림산업 주식회사대림씨엔에스(주)주식회사 한빛구조엔지니어링
    • 김욱종김태호이정배최선영안지희목진오하창용
    • E04B1/18E04B1/20E04C3/34
    • PURPOSE: A centrifugal molding column including a polygonal shape is provided to be easily connected to the adjacent members and to absorb a construction error generated when connecting an additional column to an upper end. CONSTITUTION: A centrifugal molding column including a polygonal shape comprises a column body(30) and a capital(40) formed in an upper end. The column body is composed of a circular form, a circular surface form, or a polygonal cross section whereby the boundary surface includes a plurality of planes. The capital includes a rectangular cross section of which the length of one side is longer than the diameter of the column body. The inside of the centrifugal molding column comprises a main reinforcement(22) and a plurality of hoops(21). A beam connection unit(50) formed on the column body fixes a steel beam to the boundary surface of the column body using a sheath(51).
    • 目的:提供一种包括多边形形状的离心模制柱,以容易地连接到相邻的构件,并吸收当将附加柱连接到上端时产生的构造误差。 构成:包括多边形的离心模塑柱包括柱体(30)和形成在上端的资本(40)。 柱体由圆形形状,圆形表面形状或多边形横截面组成,由此边界表面包括多个平面。 首都包括一边的长度大于柱体直径的矩形横截面。 离心成型柱的内部包括主加强件(22)和多个箍(21)。 形成在柱体上的梁连接单元(50)使用护套(51)将钢梁固定到柱体的边界表面。
    • 9. 发明公开
    • 원심성형 기둥용 철골보 및 기둥 동시 접합구조
    • 钢结构钢结构连接和柱塞混凝土柱
    • KR1020140073052A
    • 2014-06-16
    • KR1020120140724
    • 2012-12-06
    • 대림산업 주식회사대림씨엔에스(주)주식회사 한빛구조엔지니어링
    • 김태호이정배최선영안지희목진오하창용
    • E04B1/24E04B1/58
    • The present invention relates to a structure for simultaneously coupling a steel beam and a column and, more specifically, to a structure for simultaneously coupling a steel beam for a centrifugal casting column and a column capable of simultaneously coupling between columns with various cross-sections or between the columns with various cross-sections and a steel beam. According to the present invention, the structure for simultaneously coupling a steel beam for a centrifugal casting column and a column can easily install a steel beam on a connection part of the column body in an orthogonal direction to the column body by having a simple and easy structure because the rolled steel beam is fixed to the connection body by welding or a bolt. Therefore, the structure for simultaneously coupling a steel beam for a centrifugal casting column and a column can simply and easily connect the column members in a vertical direction and reduce construction period and construction costs by directly connecting the steel beam in an orthogonal direction to the column body without an additional apparatus such as a diaphragm.
    • 本发明涉及一种用于同时连接钢梁和柱的结构,更具体地说,涉及一种用于同时连接用于离心铸造柱的钢梁和能够同时连接具有各种横截面的塔之间的柱的结构, 在具有各种横截面的柱和钢梁之间。 根据本发明,用于同时连接用于离心铸造柱和塔的钢梁的结构可以通过简单且容易的方式将钢梁以与柱体正交的方式容易地安装在柱体的连接部分上 结构是因为轧制钢梁通过焊接或螺栓固定在连接体上。 因此,用于同时连接离心铸造柱和柱的钢梁的结构可以简单且容易地连接柱构件在垂直方向上,并且通过将钢梁沿垂直方向直接连接到柱而缩短施工周期和施工成本 没有附加的装置如隔膜。