    • 1. 发明公开
    • Blast method for center hole of tunnel
    • 隧道中心的BLAST方法
    • KR20120034328A
    • 2012-04-12
    • KR20100095799
    • 2010-10-01
    • HEUNDOENG CO LTDKIM YONG BEOMKIM JONG YONGLEE GANG SU
    • LEE GANG SUKIM YONG BEOMKIM JONG YONG
    • F42D1/00F42D3/04
    • F42D1/06E21D9/006F42D1/02F42D3/04F42D5/045
    • PURPOSE: A last method for center hole of tunnel is provided to minimize transmission of the vibration according to the blasting and noise. CONSTITUTION: A first smooth blasting(21) is formed in the central part of the tunnel free surface. 4 second smooth blastings(22) are parallelly separated with the first smooth blasting from the first smooth blasting. 4 primary blast balls(23) are arranged in the first smooth blasting surrounding in the form of square. The first blast balls are obliquely dug to the backend of the first smooth blasting. The second bursts are obliquely dug to the backend of the first smooth blasting. Third bursts are parallelly dug with second smooth blasting. Explosive successively explodes from the first blast ball to the third burst.
    • 目的:提供隧道中心孔的最后一种方法,以根据爆破和噪声来最小化振动的传播。 构成:在隧道自由表面的中心部分形成第一次平滑喷砂(21)。 从第一次平滑喷砂,第二次平滑爆破(22)与第一次平滑喷砂平行分离。 4个初级鼓风球(23)以平方形的形式排列在第一次平滑的爆破中。 第一个喷砂球是倾斜地挖到第一次光滑喷砂的后端。 第二次爆发是倾斜挖掘第一次光滑爆破的后端。 用第二次平滑喷砂平行地挖出第三阵阵。 爆炸事件从第一炮爆炸到第三次爆炸。