会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 81. 发明授权
    • 하수관 보수용 반전장치에 구비된 원통형 탈취장치 및 탈취방법
    • 缝管修理筒式除油装置及方法
    • KR101252051B1
    • 2013-04-08
    • KR1020120135798
    • 2012-11-28
    • 덕산건설 주식회사
    • 박광규
    • E03F3/06E03F7/00F16L55/163F16L55/18F16L55/07B01D53/04B01D46/00
    • E03F3/06B01D46/00B01D53/04B29C63/36E03F7/00E03F2003/065
    • PURPOSE: A cylindrical deodorization device included in an inverting device for repairmen and a deodorization method are provided to prevent channeling phenomenon and to improve use efficiency or adsorption efficiency of activated carbon. CONSTITUTION: A cylindrical deodorization device included in an inverting device for repairmen comprises a drawing pipe, an air tank, a cooling spiral steel pipe, and a deodorization device(100). The drawing pipe is inserted into an inversion tube and draws heated air in the inversion tube. The air tank is connected to each drawing pipe and collects high temperature vapor discharged from a plurality of the drawing pipes. The cooling spiral steel pipe is included between the deodorization device and the air tank and cools the high temperature air discharged from the inversion tube with heat exchange with atmosphere. The deodorization device comprises a first cylindrical deodorization member(130), a second cylindrical deodorization member(140), a dust filter, a deodorization agent, and a filter layer. The first cylindrical deodorization member is connected to a discharging end of the spiral steel pipe and draws heated air. The second cylindrical deodorization member is connected to an end of a corrugated pipe(120). The dust filter removes dust included in the heated air. The deodorization agent is arranged in the rear of the dust filter and removes foul odor with activated carbon. The filter layer is arranged in the rear of the deodorization agent.
    • 目的:提供一种包括在用于维修的翻转装置和除臭方法中的圆柱形除臭装置,以防止引流现象,并提高活性炭的使用效率或吸附效率。 构成:包括在用于修理工的翻转装置中的圆柱形除臭装置包括拉丝管,空气罐,冷却螺旋钢管和除臭装置(100)。 将拉拔管插入反转管中,并将反应管中的加热空气抽吸。 空气罐连接到每个拉管,并收集从多个抽拉管排出的高温蒸气。 冷却螺旋钢管包括在除臭装置和空气罐之间,并与大气中的热交换冷却从倒置管排出的高温空气。 除臭装置包括第一圆柱形除臭构件(130),第二圆柱形除臭构件(140),除尘过滤器,除臭剂和过滤层。 第一圆柱形除臭构件连接到螺旋钢管的排放端并吸入加热的空气。 第二圆柱形除臭构件连接到波纹管(120)的端部。 除尘过滤器除去加热空气中包含的灰尘。 除臭剂布置在除尘过滤器的后部,并用活性炭除去恶臭。 过滤层布置在除臭剂的后部。
    • 82. 发明授权
    • A pipe
    • 一个PIPE
    • KR101190798B1
    • 2012-10-12
    • KR20120062657
    • 2012-06-12
    • DARIM CO LTD
    • KIM YONG SAM
    • E03B7/00F16L47/02F16L47/06
    • F16L47/03E03B7/02E03F3/06F16L21/06F16L47/06
    • PURPOSE: A connection method of a water and sewage pipe integrated with a connector using electric fusion is provided to prevent a water and sewage pipe from being separated from a connector. CONSTITUTION: A connection method of a water and sewage pipe integrated with a connector using electric fusion is as follows. Water and sewage pipes(10,11) and a connector(20) are aligned, and a fusion alignment bar with an alignment protrusion is injection-molded. The water and sewage pipes and the connector are aligned in a horizontal direction. Fusion portions are integrally formed on the outer diameter of the water and sewage pipes. The ground where the water and sewage pipes are to be connected is excavated and compacted. The water and sewage pipes are inserted into the connector and are inserted into the excavated ground. A fusion portion(21a) of the connector is integrally connected to the outer diameter of the water and sewage pipes.
    • 目的:提供与使用电熔合的连接器一体化的污水和污水管的连接方法,以防止水和污水管与连接器分离。 构成:使用电熔合与连接器集成的污水管道的连接方法如下。 水和污水管(10,11)和连接器(20)对准,并且具有对准突起的融合对准杆被注射成型。 水和污水管和连接器在水平方向对齐。 融合部分一体地形成在水和污水管的外径上。 水与污水管连接的地面被挖掘和压实。 水和污水管插入连接器并插入挖土场。 连接器的熔接部分(21a)与水和污水管的外径一体连接。
    • 83. 发明授权
    • 연결구 일체형 충진벽관
    • 带连接器的三层管
    • KR101068101B1
    • 2011-09-28
    • KR1020110049134
    • 2011-05-24
    • (주)태광폴리켐
    • 김종순
    • E03F3/04F16L21/02F16L47/06
    • E03F3/04E03F3/06
    • 본 발명은 충진벽관의 시공이 매우 간편하게 이루어지며, 충진벽관의 이탈이 방지되며, 수밀성을 향상시킨 새로운 형태의 연결구 일체형 충진벽관에 관한 것으로, 합성수지로 제조된 충진벽관 ; 합성수지 압출에 의하여 관 형태로 형성되되, 내주면 일측 방향으로부터 타측 방향으로 링 형태의 고무링 장착홈, 링 형태의 단부 지지부재 장착홈, 링 형태의 복수의 실링러버 장착홈이 서로 이격되면서 순차적으로 형성된 연결구 ; 상기 고무링 장착홈에 장착되도록 링 형태로 형성되되 내주 지름이 상기 연결구의 내주 지름보다 작은 고무링 ; 상기 단부 지지부재 장착홈에 장착되도록 링 형태를 가지되 내주 지름이 상기 고무링의 내주 지름보다 작은 단부 지지부재 ; 상기 실링러버 장착홈에 장착되도록 링 형태를 가지되, 단면 형태가 상기 실링러버 장착홈에 장착되며 외측면 중간부에 완충홈이 형성되는 장착부와, 상기 장착부의 내측면으로부터 상기 단부 지지부재를 향하여 경사지게 내측으로 돌출 형성된 복수의 실링 날개를 포함하여 이루어지는 실링 러버 ; 를 포함하여 이루어지되, 상기 충진벽관의 일측 단부가 상기 연결구의 일측으로 삽입되어 상기 단부 지지부재와 접하게 되며, 상기 고무링은 상기 충진벽관의 외주면과 상기 연결구의 내주면 사이를 실링하며, 상기 연결구의 일측 단부는 상기 충진벽관의 외주면에 용접되어 고정되며, 상기 단부 지지부재는 가요성을 가진 합성수지 띠가 링 형태로 휘어지면서 상기 단부 지지부재 장착홈에 장착된 것을 특징으로 한다.
    • 84. 发明公开
    • 합성수지재 하수관용 비굴착식 교체장치
    • 非开挖式水管替代方法和装置
    • KR1020110051053A
    • 2011-05-17
    • KR1020090107703
    • 2009-11-09
    • 김진길김용한
    • 김진길김용한
    • F16L55/162B29C63/26H04N5/232
    • E03F3/06B25J5/007B25J19/023E03F2003/065
    • PURPOSE: A non-excavation type water pipe replacing method and an apparatus thereof are provided to enable the smooth insertion of a new drain pipe into an existing drain pipe since the diameter of the drain pipe is extended. CONSTITUTION: A non-excavation type water pipe replacing method comprises following steps. The internal deformation state of a drain pipe(10) is inspected by a CCD(Charge Coupled Device) camera. A tube expander(20) is put into the inside of the drain pipe. A ground around a deformed part(12) is softened. A cutting unit is put into the inner side of the drain pipe. The cutting unit cuts out multiple spots of the drain pipe in a longitudinal direction. The diameter of the drain pipe is expanded to the inner side of the drain pipe.
    • 目的:提供一种非开挖式水管更换方法及其装置,以便能够将排水管平滑地插入现有的排水管中,因为排水管的直径延长。 构成:非开挖式水管替代方法包括以下步骤。 排水管(10)的内部变形状态由CCD(电荷耦合装置)照相机进行检查。 管式扩管器(20)被放入排水管的内部。 变形部分(12)周围的地面软化。 切割单元放入排水管的内侧。 切割单元沿纵向切割出排水管的多个点。 排水管的直径扩大到排水管的内侧。
    • 85. 发明授权
    • 상하수도관 보수용 에폭시 접착제
    • 环氧胶粘剂修补供水和缝管
    • KR101016774B1
    • 2011-02-25
    • KR1020100028342
    • 2010-03-30
    • (주)동원엔텍
    • 태원필김기수신승호
    • C09J163/00C09J11/00E03B7/00
    • E03B7/006C08L75/04C09J163/00E03F3/06E03F2003/065
    • PURPOSE: An epoxy adhesive for repairing water supply and sewage pipe is provided to ensure thermal stability at a high temperature by adding polyurethane or polyurea to an existing bisphenol-F type epoxy resin. CONSTITUTION: An epoxy adhesive for repairing water supply and sewage pipe comprises 10-90 parts by weight of epoxy compound, 0.1-50 parts by weight of diluent, 10-90 parts by weight of hardener, 0.1-10 parts by weight of antifoaming agent, 0.1-20 parts by weight of additives, 0.1-1 parts by weight of antioxidant, 0.01-5 parts by weight of chain extender, and 0.5-3 parts by weight of filler. The epoxy mixture comprises a bisphenol F type liquid phase epoxy with 150-400 equivalent and a bisphenol F type solid phase epoxy with 400-500 equivalent. The additive comprises polyurethanes.
    • 目的:提供用于修复供水和污水管道的环氧树脂粘合剂,以通过向现有的双酚F型环氧树脂中加入聚氨酯或聚脲来确保高温下的热稳定性。 构成:用于修复供水和污水管的环氧树脂粘合剂包括10-90重量份环氧化合物,0.1-50重量份稀释剂,10-90重量份硬化剂,0.1-10重量份消泡剂 ,0.1-20重量份添加剂,0.1-1重量份抗氧化剂,0.01-5重量份扩链剂和0.5-3重量份填料。 环氧混合物包括具有150-400当量的双酚F型液相环氧树脂和400-500当量的双酚F型固相环氧树脂。 添加剂包括聚氨酯。
    • 86. 发明公开
    • 비개착식 지중관로 시공장치 및 그 방법
    • 无缝管线结构设备及方法
    • KR1020100101476A
    • 2010-09-17
    • KR1020090019980
    • 2009-03-09
    • 주식회사 추진건설이창열김남선
    • 이창열김남선
    • E03F3/06E03F3/00
    • E03F3/06F16L1/036
    • PURPOSE: A deice and a method for constructing a non-excavated trenchless pipeline are provided to construct a pipeline in the underground without excavating a road or ground. CONSTITUTION: A deice and a method for constructing a non-excavated trenchless pipeline comprises a support(10), a hydraulic cylinder(20), a rear protective cap(30), a front protective cap(40), a hydraulic jack(50), an excavation knife(60), a hume pipe support(70), and a controller. The hydraulic cylinder is fixed to the support and is arranged corresponding to a socket unit of a hume pipe. The rear protective cap covers the socket unit of the hume pipe and is in contact with the front end of a piston rod. The front protective cap covers an insertion unit of the hume pipe. The hydraulic jack is fixed to the front protective cap. The excavation knife covers the hydraulic jack, the front protective cap, and the insertion unit of the hume pipe. The hume pipe support supports the hume pipe. The controller controls the hydraulic cylinder and the hydraulic jack.
    • 目的:提供一种用于构建非挖掘无开挖管道的设备和方法,以在地下建造一条管道,而不会挖掘道路或地面。 构成:用于构造非挖掘的无开挖管道的设备和方法包括支撑件(10),液压缸(20),后保护盖(30),前保护盖(40),液压千斤顶(50) ),挖掘刀(60),休眠管支架(70)和控制器。 液压缸固定在支架上,并与休眠管的插座单元相对应。 后保护盖覆盖休眠管的插座单元并与活塞杆的前端接触。 前保护盖覆盖休眠管的插入单元。 液压千斤顶固定在前保护盖上。 挖掘刀覆盖液压千斤顶,前保护盖和休眠管的插入单元。 休眠管支架支撑休眠管。 控制器控制液压缸和液压千斤顶。
    • 88. 发明公开
    • 배수 트렌치 유닛용 레벨조절기
    • 排水装置水平调节装置
    • KR1020100052180A
    • 2010-05-19
    • KR1020080111092
    • 2008-11-10
    • 김진아
    • 김진아박철웅
    • E02D31/02E02D31/00
    • E02D31/02E01C11/227E02D2200/115E03F3/06
    • PURPOSE: A level adjuster for a drainage trench unit is provided to conveniently adjust gradient and smoothness and rapidly install a drainage trench unit. CONSTITUTION: A level adjuster(100) for a drainage trench unit comprises a base member(110), a moveable member(120), and a fixing member(130). The base member is fixed to footing concrete. The base member comprises a first saw-toothed portion(119) consisting of saw blades. The moveable member is coupled with the base member to be moved. The moveable member comprises a second saw-toothed portion and a support unit. The second saw-toothed portion engages with the first saw-toothed portion. The support unit supports the drainage trench unit. The fixing member fixes the moveable member on the base member.
    • 目的:提供排水沟槽单元的水位调节器,方便地调节梯度和平滑度,并快速安装排水沟槽单元。 构成:用于排水沟槽单元的液位调节器(100)包括基座构件(110),可移动构件(120)和固定构件(130)。 底座固定在基础混凝土上。 基部构件包括由锯片组成的第一锯齿部分(119)。 可移动构件与要移动的基座构件联接。 可移动构件包括第二锯齿部分和支撑单元。 第二锯齿部与第一锯齿部接合。 支撑单元支撑排水沟槽单元。 固定构件将可移动构件固定在基座构件上。
    • 89. 发明授权
    • PRECAST PANEL WITH HOLES AND CONNECTIVE STRUCTURE AND CONTRUCTING METHOD USING THEREOF
    • 具有孔的预制面板和使用其的连接结构和对比方法
    • KR100938853B1
    • 2010-01-26
    • KR20090007680
    • 2009-01-30
    • BAE SUK DONGTAEHYUNG CONSTRUTION CO LTD
    • BAE SUK DONGLIM JEONG YE
    • E03F5/14E04C2/04
    • E03F5/14E03F3/06E03F5/041E04C2/044
    • PURPOSE: A porous PC panel structure and a construction method thereof are provided to prevent the damage and deformation of a panel due to high water pressure like heavy rain by expanding and combining a strand to a panel with reinforced concrete. CONSTITUTION: A porous PC panel structure comprises a lower plate(13) an upper partition, plural through holes(11), and a fixing unit connection groove. Plural fastening holes are formed in the lower plate to be fixed on the bottom of a sewage drain. The upper partition is expanded upwardly from one side of the bottom plate. The plural through holes are formed on the inside of the upper partition and the lower plate. Strands(20) for expansion are inserted into the through holes. The fixing unit connection groove is formed on both ends of the through hole. A recess groove on which the fixing unit for fixing the strand is mounted is formed in the inside of the fixing unit connection groove.
    • 目的:提供一种多孔PC面板结构及其构造方法,以通过将钢筋通过钢筋混凝土膨胀并结合到板上来防止由于诸如大雨的高水压而引起的面板的损坏和变形。 构成:多孔PC面板结构包括下板(13),上隔板,多个通孔(11)和固定单元连接槽。 在下板上形成多个紧固孔,固定在污水排放的底部。 上隔板从底板的一侧向上膨胀。 多个通孔形成在上隔板和下板的内侧。 用于膨胀的绞线(20)插入到通孔中。 固定单元连接槽形成在通孔的两端。 在固定单元连接槽的内侧形成有用于固定股线的固定单元的凹槽。
    • 90. 发明公开
    • 측구수로관
    • 侧面刀
    • KR1020090092090A
    • 2009-08-31
    • KR1020080017390
    • 2008-02-26
    • 매일이앤씨주
    • 강인관정진호
    • E03F3/04E03F3/06E01C11/22E02D29/05E02D29/16E02B11/00
    • Y02A30/68E03F3/046E03F3/06E03F5/06
    • A side gutter is provided to prevent damage due to impact and pressure and prevent crack from being generated by being securely connected through a coupling unit. A side gutter(100) comprises a coupling unit. The coupling unit comprises a coupling groove(111), a protrusion(113) and a fastening member(115). The coupling groove is formed at the lower part of the front end of the side gutter. In the coupling groove, a plurality of fastening holes are formed. The protrusion is inserted into the inside of the back end of the coupling groove of the other side gutter connected to the side gutter. In the protrusion, a corresponding fastening hole is formed. The corresponding fastening hole is formed to correspond to the fastening hole. The fastening member is coupled to the fastening hole and the corresponding fastening hole. The fastening member is made of a bolt.
    • 提供侧沟以防止由于冲击和压力造成的损坏,并通过通过联接单元牢固地连接来防止产生裂纹。 侧沟槽(100)包括联接单元。 联接单元包括联接槽(111),突起(113)和紧固构件(115)。 联接槽形成在侧槽前端的下部。 在联接槽中形成有多个紧固孔。 突起被插入连接到侧槽的另一侧沟槽的联接槽的后端的内侧。 在突起中形成相应的紧固孔。 相应的紧固孔形成为与紧固孔对应。 紧固构件联接到紧固孔和相应的紧固孔。 紧固件由螺栓制成。