会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 63. 发明公开
    • 비절개형 플랜지형 강선걸이부재를 구비하는 콘크리트파일용 헤드캡
    • 基金会头等
    • KR1020120072441A
    • 2012-07-04
    • KR1020100134195
    • 2010-12-24
    • 주식회사 제일산기
    • 임채선
    • E02D5/60E02D5/30
    • E02D5/60E02D5/30E02D2200/165E02D2200/1685
    • PURPOSE: A head cap for a concrete pile having a flange-type steel wire hanger member is provided to enable the repetitive use of a tension bolt by preventing cement from flowing into a steel wire hanger member when concrete is cured. CONSTITUTION: A head cap(100) for a concrete pile having a flange-type steel wire hanger member comprises cylindrical steel wire hanger members(110), steel wire hangers(120), and pile coupling rings(102). The top end of each steel wire hanger member has a flange, and the bottom end has a latching protrusion. The latching protrusion has a steel wire through hole. Each steel wire hanger has a U-shaped concave groove in which the head part of a steel wire(130) is hung on. Each pile coupling ring has a plate(101) having a steel wire hanger member insertion hole.
    • 目的:提供一种具有法兰型钢丝悬挂件的混凝土桩的头盖,以便在混凝土固化时防止水泥流入钢丝衣架部件,从而能够重复使用张紧螺栓。 构成:用于具有法兰型钢丝悬挂件的混凝土桩的头盖(100)包括圆柱形钢丝悬挂件(110),钢丝吊架(120)和绒头联接环(102)。 每个钢丝衣架构件的顶端具有凸缘,并且底端具有闩锁突起。 闩锁突起具有钢丝通孔。 每个钢丝衣架具有U形凹槽,钢丝(130)的头部悬挂在其中。 每个桩联接环具有具有钢丝衣架构件插入孔的板(101)。
    • 64. 发明授权
    • 지중 콘크리트 파일 제거 공법
    • 地下混凝土桩去除方法
    • KR101155422B1
    • 2012-06-14
    • KR1020110060901
    • 2011-06-22
    • 진올건설 주식회사정광조정관조
    • 황상기임유진이범희이도형강보순전정문진선경정광조정관조
    • E02D9/00E02D5/30E02D9/02E02D5/58E02D5/28
    • E02D9/005E02D5/28E02D5/30E02D5/58E02D9/02E02D2250/0038
    • PURPOSE: A method for removing an underground concrete pile from the ground is provided to reduce construction time by performing the insertion work of a casing and the crushing work of a concrete pile at the same time. CONSTITUTION: A method for removing an underground concrete pile is as follows. A pile driver is prepared. A rod is installed on the pile driver to be vertically movable. A screw is installed on the outer surface of the rod, and a crushing device is connected to the bottom end thereof. A pipe-shaped casing is inserted into the ground and surrounds a concrete pile. The rod is inserted into the casing. The concrete pile surrounded by the casing is crushed by the crushing device connected to the rod. The rod is drawn out of the ground, and the crushed concrete pile is removed from the casing. The casing is filled with earth and is drawn out of the ground.
    • 目的:提供一种从地下除去地下混凝土桩的方法,通过进行套管插入工作和混凝土桩的破碎作业,同时减少施工时间。 构成:一种去除地下混凝土桩的方法如下。 打桩机准备好了。 打桩机上安装有可垂直移动的杆。 螺杆安装在杆的外表面上,破碎装置连接到其底端。 将管状套管插入地面并围绕混凝土桩。 将杆插入外壳。 由壳体包围的混凝土桩被连接到杆的破碎装置压碎。 将杆从地面拉出,将破碎的混凝土桩从套管中取出。 外壳充满地球,并从地面上拉出。
    • 65. 发明授权
    • Prefab apparatus for reinforcing head of pile
    • 用于加固桩头的预制装置
    • KR101137959B1
    • 2012-05-11
    • KR20090029861
    • 2009-04-07
    • E02D5/28E02D5/30E02D5/34
    • 본 발명은 조립식 건축용 파일의 두부 보강장치에 관한 것으로서, 링형상을 가지며 수직 방향으로 상호 이격 배치되는 다수의 가로 철근; 상기 가로 철근들과 교차되도록 배치되는 다수의 세로 철근; 상기 가로 철근과 상기 세로 철근의 교차점에 착탈 가능하게 결합되어 상기 가로 철근과 상기 세로 철근을 상호 결합시키는 다수의 브래킷; 및 상기 세로 철근들의 하단부에 연결되어 상부를 지지하는 원반 형상의 캡을 포함하는 것을 특징으로 한다. 이에 의해, 간단하고도 단순한 구조 및 방법으로 현장 조립이 가능하기 때문에 특히 물류이송이 용이해져 물류비용을 감소시킬 수 있으며, 이에 따라 시공기간, 시공비용, 취급의 용이성, 시공의 안전성 및 시공의 신뢰성 등의 제반 요건을 효과적으로 충족시킬 수 있다.
      건축용 파일, 파일, 두부, 보강, 구조, 철근, 조립식
    • 提供一种用于施工的桩的预制头部加固装置,通过降低焊接作业的物理分配成本和劳动力成本并且提高施工作业的安全性,从而整体上降低施工成本。 一种用于施工的桩的预制头部加固装置包括许多具有环形形状并沿垂直方向以一定距离布置的水平加强杆(10),许多垂直加强杆(20)布置成与水平加强杆交叉, 在水平钢筋和垂直钢筋相交处连接的多个支架(30)可以分开,以便将水平钢筋和垂直钢筋互相连接起来;以及盘形盖(40),连接到 垂直钢筋支撑上部。
    • 69. 发明授权
    • 복합파일용 연결 조인트
    • 连接复合桩的接头
    • KR101075178B1
    • 2011-10-21
    • KR1020090035042
    • 2009-04-22
    • (주)전호
    • 이주열
    • E02D5/28E02D5/30E02D5/54E02D5/52E04B1/21
    • 본발명은복합파일용연결조인트에관한것으로, 콘크리트파일을매설하고구조물을세우기위해상기콘크리트파일에강관파일을연결하기위한연결조인트에있어서, 중앙으로중공부를가지며, 상기콘크리트파일의선단에접하여고정되는제 1플레이트, 상기제 1플레이트에형성되며, 콘크리트파일제작시 길이방향으로내부에매설되는강선의끝단을고정하기위해구비되는강성공, 상기제 1플레이트에수직하게가장자리를감싸도록구비되는제 2플레이트및 상기제 1플레이트와제 2플레이트에각각접하며, 소정간격을두고다수개구비되는리브가구비되도록주형틀을구비하고, 설계된함유량을가지는용융금속을상기주형틀에주입하여형성된것을특징으로한다. 이와같이구성되는복합파일용연결조인트는주조공법을통해일체로형성됨에따라제조공정을간소화하여생산비용절감을도모할수 있고, 콘크리트파일제조시 일체로결합됨으로강관파일접합시 용이하게작업할수 있는장점이있다.