    • 61. 发明授权
    • 도로용 콘크리트 옹벽 블록
    • 混凝土保持墙块
    • KR101019265B1
    • 2011-03-07
    • KR1020100080337
    • 2010-08-19
    • (주)부광엔지니어링
    • 이동훈
    • E02D29/02E02B3/14E02D17/20
    • E02D29/025E02B3/14E02D17/205E02D29/0266E02D2300/0084
    • PURPOSE: A concrete retaining wall block for a road is provided to easily eliminate underground utilities and to remarkably reduce construction time by reducing field works. CONSTITUTION: A concrete retaining wall block(200) for a road comprises base plates(110), front members(250), columns(220), foundation members(230), and connection members(240). The base plates are installed on the top of blocks arranged along a slope. The front members are vertically positioned at the base plates and support earth pressure. The columns are vertically positioned at both sides of the base plates. The foundation members are integrally extended from the bottoms of the columns. The connection members integrally connect the foundation members.
    • 目的:提供一种用于道路的混凝土挡土墙,以便轻松消除地下工程,并通过减少现场工程显着减少施工时间。 构成:用于道路的混凝土挡土墙块(200)包括基板(110),前部构件(250),立柱(220),基础构件(230)和连接构件(240)。 基板安装在沿斜坡布置的块的顶部。 前部构件垂直定位在底板上并支撑土压力。 这些列垂直定位在基板的两侧。 基础构件从柱的底部整体延伸。 连接部件一体地连接基础部件。
    • 62. 发明公开
    • 보강토블록
    • 强化地块
    • KR1020100111647A
    • 2010-10-15
    • KR1020100092386
    • 2010-09-20
    • 삼성그린테크 주식회사김경령
    • 김경령
    • E02D29/02E02D17/20E02B3/14
    • E02D29/025E02B3/14E02D17/205E02D2300/0084
    • PURPOSE: A retaining soil block is provided to improve installation stability of a retaining soil block by increasing coherence between a retaining soil block and a grid. CONSTITUTION: A retaining soil block is formed with two holes(107) vertically on the front and rear sides of a body(100). The front center of the retaining soil block body is formed with a rough-faced part(102). Multiple vertical grooves are symmetrically formed based on the center in the front side both ends of the retaining soil block body portion. A front protrusion(103) and a rear protrusion(104) are formed on the upper side of the retaining soil block body. A front coupling groove and a rear coupling groove(106) are formed on the bottom of the retaining soil block body.
    • 目的:提供保持土块,以通过增加保持土块和网格之间的相干性来提高保持土块的安装稳定性。 构成:保持土块在主体(100)的前后两侧垂直形成有两个孔(107)。 保持土块体的前中心形成有粗糙面部(102)。 基于保持土块主体部分的前侧两端的中心对称地形成多个垂直槽。 在保持土块体的上侧形成有前突起(103)和后突起(104)。 在保持土块体的底部形成有前连接槽和后联接槽(106)。
    • 63. 发明授权
    • 옹벽 시공을 위한 옹벽블록과 이 옹벽블록과 지오그리드를 이용한 옹벽의 시공 방법
    • 保留墙块和保留墙板和地质保护墙的构造方法
    • KR100981258B1
    • 2010-09-10
    • KR1020090114494
    • 2009-11-25
    • 윤정배
    • 윤정배
    • E02D29/02E02D17/20
    • E02D29/0225E02D17/205E02D2200/1692E02D2300/0084E02D2300/0089
    • PURPOSE: A retaining wall block for retaining wall construction and a construction method of a retaining wall using a retaining wall block and a retaining wall block and a geogrid are provided to prevent the inflow of water using water sealing mat and by reinforcing a foundation using a geogrid. CONSTITUTION: A retaining wall block for retaining wall construction is as follows. A foundation(100) is formed along a construction area floor. A retaining wall block(10) is stacked on the foundation. A drainage guide pipe(200) is filled with rubble and soil and established in the retaining wall block back side. A support stand(22) is inserted into each hook of a geogrid(20). The support stand is fitted in a hanging groove(13) of the retaining wall block. The retaining wall block is stacked on the top of the retaining wall block. The back side of the retaining wall block is filled with rubble and soil. A cutoff mat(600) is installed to the retaining wall block and construction area. The soil is installed to the top of the cutoff mat. A side ditch(700) is formed on the stepped soil.
    • 目的:提供用于挡土墙结构的挡土墙块和使用挡土墙块和挡土墙块和土工格栅的挡土墙的施工方法,以防止使用水密封垫的水流入,并使用 土工格栅。 构成:挡土墙结构的挡土墙块如下。 沿建筑面积形成基础(100)。 挡土墙块(10)堆叠在基础上。 排水导管(200)填充瓦砾和土壤,并建立在挡土墙块背面。 将支撑架(22)插入到土工格栅(20)的每个钩中。 支撑架安装在挡土墙块的悬挂槽(13)中。 挡土墙块堆放在挡土墙块的顶部。 挡土墙的背面填充有瓦砾和土壤。 切割垫(600)安装在挡土墙块和结构区域上。 土壤被安装在截止垫的顶部。 在阶梯式土壤上形成侧沟(700)。
    • 66. 发明公开
    • 지오매트와 강봉이 결합된 블록식 보강토 옹벽 공법
    • 块式加固地板保持墙的网格和条纹一种建筑方法
    • KR1020100079876A
    • 2010-07-08
    • KR1020080138465
    • 2008-12-31
    • (주)에스오씨산업
    • 이양석
    • E02D29/02E02D17/20E02D17/18
    • E02D29/02E02D17/18E02D17/205E02D29/0241E02D2300/0084E02D2300/0089E02D2300/0096
    • PURPOSE: A GNS(Grid And Strip) block type reinforced earth retaining wall construction method is provided to prevent displacement of a reinforced earth retaining wall due to the long-term use by employing steel rods arranged in multiple stages. CONSTITUTION: A GNS block type reinforced earth retaining wall construction method comprises a step of excavating a location in which reinforced earth retaining blocks are to be installed and placing mixed rubble to create a foundation(S100) and a step of placing reinforced earth retaining wall blocks in multiple stages on the front side(S200). The step of placing reinforced earth retaining wall blocks includes a step of laying earth in the rear of the first stage of the reinforced earth retaining wall blocks and compacting the laid earth, a step of arranging steel rods at the height corresponding to the third and fourth stages of the reinforced earth retaining wall blocks, a step of placing grid reinforcing materials between the rear side of the reinforced earth retaining wall blocks and the steel rods, and forming finishing blocks on the top of the uppermost reinforced earth retaining wall blocks.
    • 目的:提供一种GNS(网格和带)块式增强土挡土墙施工方法,用于通过使用多级布置的钢杆,防止长期使用加固土挡土墙的位移。 构成:GNS块式加固土挡土墙施工方法包括挖掘加固土挡土块的位置的步骤,并设置混合瓦砾以形成基础(S100),以及放置加固土挡土墙块的步骤 在前面的多个阶段(S200)。 放置加固土挡土墙块的步骤包括将土壤放置在加固土挡土墙第一阶段的后部并压实铺土的步骤,将钢杆的排列与第三和第四高度相对应的步骤 增强土挡土墙块的阶段,将格栅加固材料放置在加固土挡土墙的后侧与钢筋之间的步骤,以及在最上面的加固土挡土墙块的顶部上形成修整块。