会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 53. 发明授权
    • 강합성 PSC 트러스 U거더 단순교 및 연속교
    • PSC U钢复合PSC桁架U梁简单桥梁和连续桥梁
    • KR101606135B1
    • 2016-03-24
    • KR1020140074277
    • 2014-06-18
    • 우경기술주식회사
    • 노경범노우현노옥근노실근
    • E01D2/00E01D2/04
    • 본발명은, 콘크리트하부플랜지(10), 한쌍의콘크리트상부플랜지(20), 및상기콘크리트하부플랜지(10) 양측과한 쌍의콘크리트상부플랜지(20)를각각연결하는한 쌍의트러스복부(30)를포함하는 U거더(40); 상기 U거더(40)의양단부에서상기콘크리트하부플랜지(10), 한쌍의콘크리트상부플랜지(20), 및한 쌍의트러스복부(30)를연결하는교대지점부콘크리트격벽블록(50); 상기콘크리트상부플랜지(20) 상에설치되는프리캐스트하프데크(60); 상기콘크리트하부플랜지(10) 내부에설치되는제1, 2내부긴장 PS강선(W1, W2); 상기 U거더(40)의내부공간부에설치되는제1, 2외부긴장 PS강선(W3, W4); 상기제1, 2내부긴장 PS강선(W1, W2)을각각정착하는한 쌍의제1, 2내부긴장 PS강선정착블록및 정착부(71a, 71b); 및상기제1, 2외부긴장 PS강선(W3, W4)을각각정착하는한 쌍의제1, 2외부긴장 PS강선정착블록및 정착부(73a, 73b)를포함하며, 상기제1내부긴장 PS강선정착블록및 정착부(71a)는상기 U거더(40)의양단하부에설치되고, 제2내부긴장 PS강선정착블록및 정착부(71b)는상기 U거더(40)의양단에서이격되어상기콘크리트하부플랜지(10) 상에설치되며, 상기제1, 2외부긴장 PS강선정착블록및 정착부(73a, 73b)는상기 U거더(40)의양단상부에서아래로차례로설치되고, 상기제1, 2내부긴장 PS강선(W1, W2)은거더제작장에서긴장되며, 상기제1, 2외부긴장 PS강선(W3, W4)은상기 U거더(40)가교대(1)에거치되고, 상기프리캐스트하프데크(60) 상부에슬래브가타설된후 긴장되는강합성 PSC 트러스 U거더단순교에관한것이다. 본발명을통해, 종래의강합성 PSC 트러스 U거더보다트러스격점부, 정착블록과정착부, 새들형상, PC강선의구성과긴장방법을개선하여효율을증대시킬수 있으며, 종래의 PSC U거더에비해콘크리트사용량을줄여거더중량을감소시키고, 강재박스거더또는강재 U거더에비해강재사용량을줄여경제성을증가시키는효과를제공할수 있다.
    • 54. 发明公开
    • 강합성 PSC 트러스 U거더 단순교 및 연속교
    • 钢铁复合材料PSC TRUSS U GIRDER简单的桥梁和连续桥梁
    • KR1020150145038A
    • 2015-12-29
    • KR1020140074277
    • 2014-06-18
    • 우경기술주식회사
    • 노경범노우현노옥근노실근
    • E01D2/00E01D2/04
    • 본발명은, 콘크리트하부플랜지(10), 한쌍의콘크리트상부플랜지(20), 및상기콘크리트하부플랜지(10) 양측과한 쌍의콘크리트상부플랜지(20)를각각연결하는한 쌍의트러스복부(30)를포함하는 U거더(40); 상기 U거더(40)의양단부에서상기콘크리트하부플랜지(10), 한쌍의콘크리트상부플랜지(20), 및한 쌍의트러스복부(30)를연결하는교대지점부콘크리트격벽블록(50); 상기콘크리트상부플랜지(20) 상에설치되는프리캐스트하프데크(60); 상기콘크리트하부플랜지(10) 내부에설치되는제1, 2내부긴장 PS강선(W1, W2); 상기 U거더(40)의내부공간부에설치되는제1, 2외부긴장 PS강선(W3, W4); 상기제1, 2내부긴장 PS강선(W1, W2)을각각정착하는한 쌍의제1, 2내부긴장 PS강선정착블록및 정착부(71a, 71b); 및상기제1, 2외부긴장 PS강선(W3, W4)을각각정착하는한 쌍의제1, 2외부긴장 PS강선정착블록및 정착부(73a, 73b)를포함하며, 상기제1내부긴장 PS강선정착블록및 정착부(71a)는상기 U거더(40)의양단하부에설치되고, 제2내부긴장 PS강선정착블록및 정착부(71b)는상기 U거더(40)의양단에서이격되어상기콘크리트하부플랜지(10) 상에설치되며, 상기제1, 2외부긴장 PS강선정착블록및 정착부(73a, 73b)는상기 U거더(40)의양단상부에서아래로차례로설치되고, 상기제1, 2내부긴장 PS강선(W1, W2)은거더제작장에서긴장되며, 상기제1, 2외부긴장 PS강선(W3, W4)은상기 U거더(40)가교대(1)에거치되고, 상기프리캐스트하프데크(60) 상부에슬래브가타설된후 긴장되는강합성 PSC 트러스 U거더단순교에관한것이다. 본발명을통해, 종래의강합성 PSC 트러스 U거더보다트러스격점부, 정착블록과정착부, 새들형상, PC강선의구성과긴장방법을개선하여효율을증대시킬수 있으며, 종래의 PSC U거더에비해콘크리트사용량을줄여거더중량을감소시키고, 강재박스거더또는강재 U거더에비해강재사용량을줄여경제성을증가시키는효과를제공할수 있다.
    • 本发明涉及一种具有钢复合PSC桁架U型梁的简单桥梁,其包括:U形梁(40),其包括混凝土下凸缘(10),一对混凝土上凸缘(20)和一对 桁架网(30); 用于在U形梁(40)的两端彼此连接混凝土下凸缘(10),混凝土上凸缘(20)和桁架腹板(30)的接合点的混凝土分隔块(50) ; 安装在混凝土上凸缘(20)上的预制半甲板(60); 第一和第二内部PS钢丝(W1,W2),其安装在混凝土下凸缘(10)内; 第一和第二外部PS钢丝(W3,W4),其安装在U形梁(40)的内部空间上。 一对固定块和用于分别固定第一和第二内部PS钢丝(W1,W2)的第一和第二内部PS钢丝的固定部分(71a,71b) 以及分别固定第一和第二外部PS钢丝(W3,W4)的一对固定块和用于第一和第二外部PS钢丝的固定部分(73a,73b)。 因此,本发明通过改进桁架连接点的结构和张力方法,固定块,固定部件,鞍形和PC钢丝与常规的钢复合PSC桁架U形梁相比提高了效率,以及 通过减少与常规PSC U型梁相比使用的混凝土的量来减小梁的重量。
    • 55. 发明授权
    • 단열 보강 구조체 및 그 시공 방법
    • 自适应结构与构造方法
    • KR101535515B1
    • 2015-07-09
    • KR1020140025266
    • 2014-03-04
    • 우경기술주식회사
    • 노경범노우현노옥근노실근
    • E04B1/80
    • E04B1/80
    • 본발명은단열보강구조체및 그시공방법에관한것으로서, 특히건축물의벽체(10)나슬래브벽체(20)의단열을보강하는복수의단열패널(100)들과; 상기단열패널(100) 하부에구비되어상기단열패널(100)을지지하는받침대(200)들과; 일단은상기벽체(10)에고정되며, 타단은상기단열패널(100)에삽입되는복수의연결고정핀(300)들로구성되어, 기존건축물의벽체(10) 또는슬래브벽체(20)에단열보강시 시공공정을간소화하여작업편의성을향상시키는동시에공사기간을단축시켜비용을절감하는데효과있으며, 기존건축물에손상을주지않고벽체(10)의외측또는슬래브벽체(20)의하부에일체화시켜단열시공이가능하게함으로써단열성능및 구조물의안전성을향상시키는데효과가있도록하는것이다.
    • 本发明涉及一种加强绝缘结构及其施工方法。 加强绝缘结构包括:多个绝缘板(100),用于加强建筑物的壁(10)或板壁(20)的绝缘; 支撑件(200),设置在所述绝缘板(100)下方以支撑所述绝缘板(100); 以及多个连接固定销(300),其通过一端固定到所述壁(10)上,并通过另一端插入所述绝缘板(100)。 因此,本发明允许简化现有建筑物的壁(10)或板壁(20)的加强绝缘工艺,从而提高可操作性并减少施工周期和成本。 除此之外,加强绝缘结构与壁(10)的外侧或板壁(20)的底部一体化,而不损坏现有建筑物,从而提高了绝缘性能和稳定性 结构体。
    • 57. 发明公开
    • 복합 긴장방식을 적용한 PSC 거더 및 이의 시공방법
    • 组合张力的PSC GIRDER应用系统和该构造技术
    • KR1020130068384A
    • 2013-06-26
    • KR1020110135504
    • 2011-12-15
    • 우경기술주식회사
    • 노옥근노실근박근화노경범노우현
    • E01D2/00E01D2/02E01D21/00E01D101/28
    • E01D2/00E01D2/02E01D21/00E01D2101/285
    • PURPOSE: A PSC(Prestressed Concrete) girder applying a composite tension method and a construction method thereof are provided to obtain workability and economic efficiency by applying a post tension method to second tension or successive tension and to manufacture the PSC girder in a pretension method in a construction field. CONSTITUTION: Concrete is placed and is cured after a first PC steel wire is tensioned in a pretension method. The tension of the first PC steel wire is released in order to manufacture a PSC girder. A PC steel wire anchoring unit(16) and a sheath(18) for maintenance are installed at a web or an end of the PSC girder. The PSC girder is mounted on a bridge plate(20) and a bridge post(22), and a second PC steel wire and a successive PC steel wire(14) is installed. A bottom slab is formed, and pavement and a handrail are constructed. The secondary tension or the successive tension is comprised in a post-tension method.
    • 目的:提供一种应用复合拉伸方法的PSC(预应力混凝土)梁及其施工方法,通过对第二张力或连续张力进行后张力法,以预拉伸方式制造PSC梁,获得可加工性和经济效益 一个建筑领域。 构成:将第一根PC钢丝以预张力拉紧后,将混凝土放置并固化。 释放第一PC钢丝的张力以制造PSC大梁。 PCC钢丝锚固单元(16)和用于维护的护套(18)安装在PSC大梁的腹板或端部。 PSC梁安装在桥板(20)和桥梁柱(22)上,并安装有第二PC钢丝和连续的PC钢丝(14)。 形成底板,构造路面和扶手。 二次张力或连续张力包括在后张力方法中。
    • 58. 发明公开
    • 건축 구조물용 하이브리드 슬래브
    • 混合砖用于建筑结构
    • KR1020130041449A
    • 2013-04-25
    • KR1020110105689
    • 2011-10-17
    • 우경기술주식회사
    • 노윤근노옥근노실근박근화노경범노우현
    • E04B5/32E04B5/48
    • E04B5/326
    • PURPOSE: A hybrid slab for building structures is provided to light weight by reducing the self-weight of a slab, to reduce vibration and noise, and to seasonally control the temperature of the slab. CONSTITUTION: A hybrid slab for building structures comprises a precast concrete deck(40), a resin based hollow box(50), a pipe(60), and concrete(70). The top of a beam(20) is arranged with the precast concrete deck and the resin based hollow box at a regular interval. The pipe is installed between the resin based hollow boxes for pouring the concrete onto in order to form a slab(S). The pouring quantity of the concrete is inversely proportional to number of the hollow boxes. The surface of the hollow box is formed with an uneven part for improving an adhesive force with the concrete.
    • 目的:通过减少板坯的自重,减少振动和噪音,以及对板坯的温度进行季节性控制,提供了建筑结构的混合板。 构成:用于建筑结构的混合板包括预制混凝土板(40),树脂基空心箱(50),管(60)和混凝土(70)。 梁(20)的顶部与预制混凝土板和树脂基空心箱定期间隔布置。 管子安装在用于浇注混凝土的树脂基空心箱之间以形成板坯(S)。 混凝土的浇注量与中空箱的数量成反比。 中空箱的表面形成有用于改善与混凝土的粘合力的不平坦部分。
    • 59. 发明授权
    • PSC 세그먼트 거더 연결구조
    • PSC部门GIRDER连接结构
    • KR101211066B1
    • 2012-12-12
    • KR1020110107766
    • 2011-10-21
    • 우경기술주식회사
    • 노윤근노옥근노실근박근화노경범노우현
    • E01D2/00E01D2/02E01D2/04E01D101/26E01D101/28
    • E01D2/00E01D2/02E01D2/04E01D2101/268E01D2101/285
    • PURPOSE: A PSC(prestressed concrete) segment girder connection structure is provided to remarkably improve the strength of a connection of a PSC segment girder compared with an existing connection structure which uses a PS steel material. CONSTITUTION: A PSC segment girder connection structure is comprised as follows. PSC segment girders(+G,-G) are placed on abutments(10) and piers(12). Web connectors are buried in the webs of the connections(J) of the PSC segment girders. An I-shaped connector is fixed to each web connector using a high-tension bolt. Connection plates are welded to flange connection plates buried in the upper and lower flanges of the connections of the PSC segment girders. Concrete or non-shrinkage mortar is placed on the connections of the PSC segment girders and cured. Prestressing steel anchorage blocks are installed on the outer web or inner web of the PSC segment girders. The PSC segment girders are connected to prestressing steel materials at the prestressing steel anchorage blocks.
    • 目的:提供PSC(预应力混凝土)段梁连接结构,与现有的使用PS钢材料的连接结构相比,显着提高了PSC段梁连接的强度。 构成:PSC段梁连接结构如下。 PSC段桁架(+ G,-G)放置在基台(10)和墩(12)上。 网络连接器被埋在PSC段梁的连接(J)的腹板上。 使用高压螺栓将I形连接器固定到每个腹板连接器。 连接板焊接到埋在PSC段梁连接的上下法兰中的法兰连接板上。 将混凝土或非收缩砂浆放置在PSC段梁的连接处并固化。 预应力钢锚固块安装在PSC段梁的外网或内腹板上。 PSC段梁在预应力钢锚固块处与预应力钢材连接。