会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 45. 发明授权
    • 복합형 사방댐
    • 混合型脱蜡机
    • KR101008839B1
    • 2011-01-19
    • KR1020100048506
    • 2010-05-25
    • 주식회사 대흥미래기술
    • 김성태
    • E02B7/14E02B8/02E02B3/16E02B3/02
    • E02B7/14E02B3/02E02B3/16E02B8/023
    • PURPOSE: A hybrid type debris barrier is provided to endure against a strong load by applying supporting force to a stone filling space using stone. CONSTITUTION: A hybrid type debris barrier(100) comprises main members(110), screen members(120), buttress members(130), a stone filling space(140), and a cover(150). The main members are arranged on bases(105) at an uniform interval and are rearward inclined. The screen members are horizontally fixed to one surface of the main members. The buttress members are composed of a horizontal member(132) and an inclined member(134). The horizontal member is parallel with the bases. The inclined member is extended from the horizontal member and is fixed to the bases. The stone filling space is filled with stone with a uniform size. The cover is formed on the top of the stone filling space and prevents stone loss.
    • 目的:通过使用石头向石头填充空间施加支撑力,提供混合型碎片屏障,以抵抗强大的载荷。 构成:混合型垃圾挡板(100)包括主要构件(110),筛网构件(120),支撑构件(130),石填充空间(140)和盖(150)。 主要构件以均匀的间隔布置在基座(105)上并且向后倾斜。 屏幕构件水平地固定在主要构件的一个表面上。 支撑构件由水平构件(132)和倾斜构件(134)构成。 水平构件与底座平行。 倾斜构件从水平构件延伸并固定到基座。 石头填充空间充满均匀尺寸的石头。 盖子形成在石材填充空间的顶部,防止石头损失。
    • 48. 发明授权
    • 옹벽 구조물
    • 保留墙结构
    • KR100874506B1
    • 2008-12-18
    • KR1020080034752
    • 2008-04-15
    • 주식회사 대흥미래기술니스코 주식회사
    • 김성태이재성
    • E02D29/02E02D17/20E04H12/04E04H12/08
    • E02D29/02E02D17/20E04H12/04E04H12/08
    • A retaining wall structure is provided to have stiffness, the advantage of a steel frame retaining wall, and environment-friendly effect and aesthetic effect, the advantage of a wood frame retaining wall, simultaneously. A retaining wall structure comprises a retaining wall frame including a pair of steel members having a screen insertion groove and a wood fitting projection, a vertical member(110) having a wood member placed to be replaceable between a pair of the steel members and changing the cross-sectional area by replacing the wood member, a horizontal member composed of first and second transverse members coupled to the top and the bottom respectively, and plural screen members inserted and piled vertically together with the first transverse member and made of wooden material, and a base portion coupled with the horizontal member integrally and buried under the bottom at the front of the ground.
    • 提供挡土墙结构以具有刚度,钢框架挡墙的优点,以及环保效果和美学效果,同时具有木框挡土墙的优点。 挡土墙结构包括一个挡土墙框架,该挡土墙框架包括一对具有筛网插入槽和木制配件突起的钢构件,垂直构件(110)具有木构件,该木构件可置于一对钢构件之间, 通过更换木材构件的横截面积,由分别连接到顶部和底部的第一和第二横向构件构成的水平构件,以及与第一横向构件一起插入和堆放并由木材制成的多个筛网构件,以及 与水平构件一体地结合并埋设在地面前方底部的基部。
    • 49. 发明授权
    • 골막이
    • 检查
    • KR100848692B1
    • 2008-07-28
    • KR1020080031827
    • 2008-04-04
    • 주식회사 대흥미래기술
    • 김성태이재혁
    • E02B7/04E02B8/02E02B3/12E02B3/06
    • Y02A10/13E02B7/04E02B3/06E02B3/12E02B8/023
    • A check dam is provided to perform construction work simply and quickly without concrete foundation work, to make maintenance work easy, to extend service life by resisting excessive external load in a localized torrential downpour, and to prevent the damage caused by soil, stone and driftwood flowing from the upper stream to the lower stream by reducing the speed of a current. A check dam(100) for forming a passage, for making water flow from the upper stream to the lower stream, and installed to a downward concave construction surface at right angles to the flow of water to let water pass through as it is and to prevent stone or wood coming down from the upper stream from going down to the lower stream, comprises a support frame unit(110) composed of plural first steel frames(111) and plural second steel frames(112) fixed to a construction surface and assembled to be rotary by a support shaft(113), a screen unit(120) provided between the first steel frame and an adjacent steel frame, and, the second steel frame and an adjacent second steel frame to let rainwater pass through toward the lower stream and to cut off stone and wood flowing down together with the rainwater not to pass through, and a control unit(130) placed between the first steel frame and the second steel frame to widen or narrow the space between the first steel frame and the second steel frame to control an installation angle.
    • 提供一个检查堤坝,无需具体的基础工作,简单快速地进行施工工作,使维护工作变得容易,通过在局部暴雨中抵抗过多的外部负荷来延长使用寿命,并防止土壤,石头和漂流木造成的损坏 通过降低电流的速度从上游流向下游流。 用于形成通道的检查堤坝(100),用于使水从上游流到下游,并且以与水流成直角的方式安装到向下凹的施工表面,以使水直接流过,并且 包括由多个第一钢框架(111)和多个第二钢框架(112)组成的支撑框架单元(110),所述支撑框架单元(110)固定到结构表面并组装 通过支撑轴(113)旋转,设置在第一钢框架和相邻钢框架之间的筛单元(120),以及第二钢框架和相邻的第二钢框架,以使雨水向下流 并且切断与不通过的雨水一起流下的石头和木材;以及放置在第一钢框架和第二钢框架之间的控制单元(130),以加宽或缩小第一钢框架和第二钢框架之间的空间 钢筋 我来控制安装角度。