    • 32. 发明公开
    • 횡방향 이동수단을 이용한 연속압출공법에 의한 교량시공방법
    • 通过水平移动单元或水平力传递单元通过增量启动方法的桥梁的构造方法
    • KR1020040100083A
    • 2004-12-02
    • KR1020030032292
    • 2003-05-21
    • 안창일(주)서현컨스텍
    • 안창일
    • E01D21/00
    • E01D21/065E01D19/048
    • PURPOSE: A construction method for a bridge by ILM(Incremental Launching Method) using a horizontal shift unit is provided to apply for the horizontal alignment of a bridge having various curved shapes by receiving the horizontal force of an upper structure of a bridge and making horizontal movement possible. CONSTITUTION: The construction method for a bridge by ILM(Incremental Launching Method) using a horizontal shift unit comprises the steps of: completing the extrusion of an upper structure(300a) in a lower structure by manufacturing and extruding segments for an upper structure of a bridge continuously in a mold manufactory; installing a first bridge on a lower structure of parallel bridges installed next to the extruded upper structure(300a) by moving the extruded upper structure(300a) horizontally using a horizontal shift unit(400) installed between lower structures; and completing parallel bridges by manufacturing and extruding segments for an upper structure of a bridge in the same mold manufactory again.
    • 目的:提供一种使用水平移位单元的ILM(增量启动方法)的桥梁施工方法,用于通过接收桥梁上部结构的水平力并使水平方向施加具有各种弯曲形状的桥梁的水平对准 运动可能。 构成:使用水平移位单元的ILM(增量发射方法)的桥梁施工方法包括以下步骤:通过制造和挤出用于上部结构的上部结构的段来完成下部结构中的上部结构(300a)的挤压 连续铸造模具制造厂; 通过使用安装在下部结构之间的水平移位单元(400)使挤出的上部结构(300a)水平移动,在安装在挤压的上部结构(300a)旁边的平行桥的下部结构上安装第一桥; 并通过在同一模具制造商中制造和挤出桥梁上部结构的段来完成平行桥梁。
    • 34. 发明公开
    • 기둥부재와 PC빔 연결방법 및 이를 이용하여 시공된 PC구조물
    • 使用它构建的柱件和PC结构的PC梁连接方法
    • KR1020170117728A
    • 2017-10-24
    • KR1020160045499
    • 2016-04-14
    • (주)서현컨스텍안창일
    • 안창일
    • E04B1/19E04B1/30E04B1/20E04B1/58
    • 기둥부재에 PC빔을간단하고경제적으로연결(프리캐스트부재연결)시킬수 있는기둥부재와 PC빔연결방법및 이를이용하여시공된 PC구조물에관한것으로서, 상기기둥부재와 PC빔연결방법은 (a) PC빔의단부블록저면이지지되도록걸림홀이형성되며, 상기걸림홀의상방및 하방으로 PC빔의내부연결철근이연결구로연결되도록강결관통홀이형성된기둥부재를다수설치하는단계; (b) 단부면중앙에단부블록이돌출형성되어단부블록상,하로노치부가각각형성되며상기노치부로내부연결철근이수평으로연장돌출된 PC빔을인양하여상기단부블록이기둥부재의걸림홀에삽입설치된걸림지지붕의단부에지지되도록하강설치하는단계; 및 (c) 상기기둥부재의강결관통홀에강결연결봉을삽입하여양 단부를 PC빔의내부연결철근을연결구로연결되도록하는단계;를포함한다.
    • 它涉及通过简单和经济的连接到PC束到柱构件(预制件连接)sikilsu支柱构件和方法中的PC-梁连接,并使用此,支柱构件和所述PC梁连接的方法构成的PC结构的(a) 并形成为支承端部的接合孔阻塞PC束的下表面,其包括:多个安装具有通孔被连接到端口ganggyeol连接到上面和下面的锁孔的PC加强梁的内部连接所述柱构件; (B)在端块从端面突出的中心端块被形成,向下的凹口部分被形成,并且加固端块到内部连接部分的凹口提升水平延伸到极bujaeui接合孔的PC束投影 降低屋顶支撑在安装屋顶屋顶的一个步骤; 及(c),使得连接端口相连的PC加强梁的内部连接都通过通孔插入连接杆到杆ganggyeol bujaeui ganggyeol结束;和一个。
    • 37. 发明授权
    • 횡방향 스트럿부재를 이용한 라멘구조물
    • RAHMEN结构使用横向STRUT成员
    • KR101146758B1
    • 2012-05-17
    • KR1020110019142
    • 2011-03-03
    • (주)서현컨스텍안창일
    • 안창일
    • E01D2/00E01D21/00E01D101/24E01D101/26
    • E01D2/00E01D21/00E01D2101/24E01D2101/268
    • PURPOSE: A Rahmen structure using horizontal strut members is provided to cost-efficiently construct the Rahmen structure by minimizing the number of installed steel pipe piles or PHC piles. CONSTITUTION: A Rahmen structure(100) using horizontal strut members comprises piles(110), bottom plates(120), horizontal strut members(220), and longitudinal tension members(210). The piles are installed on the ground to be horizontally and longitudinally separated from each other. The bottom plates are hinged on the bottom ends of walls(130). The horizontal strut members are formed in a plate shape and are installed between the bottom plates. Both ends of the longitudinal tension members are fixed to the outer side surfaces of the bottom plates through the horizontal strut members.
    • 目的:提供使用水平支柱构件的拉赫曼结构,通过最小化安装的钢管桩或PHC桩的数量来成本有效地构建拉曼门结构。 构成:使用水平支柱构件的拉赫曼结构(100)包括桩(110),底板(120),水平撑杆构件(220)和纵向张力构件(210)。 这些桩被安装在地面上以水平和纵向地分开。 底板铰接在壁(130)的底端上。 水平支柱构件形成为板状,并且安装在底板之间。 纵向张力构件的两端通过水平支柱构件固定到底板的外侧表面。
    • 38. 发明授权
    • 지주와 파일을 일체화시킨 방음벽 및 그 시공방법
    • 声音通道和使用它的构造方法
    • KR101130167B1
    • 2012-03-28
    • KR1020110050555
    • 2011-05-27
    • (주)서현컨스텍안창일
    • 안창일
    • E01F8/00E02D5/30
    • PURPOSE: A soundproof wall having integrated post and pile and a construction method thereof are provided to enable rapid and cost-efficient construction by simplifying the installation works of posts and a panel. CONSTITUTION: A soundproof wall having integrated post and pile comprises piles, posts(200), a precise base foundation(300), and a panel. The piles are installed in boreholes(G1) of the ground and has H-shaped housing grooves(110). The bottom ends of the posts are inserted into the housing grooves of the piles. The precast base foundation is installed between the bottoms of the posts. The panel is installed between the posts over the precast base foundation.
    • 目的:提供具有一体化桩和桩的隔音墙及其施工方法,以通过简化柱和板的安装工作来实现快速和成本有效的施工。 构成:具有综合桩和桩的隔音墙包括桩,柱(200),精确的基座(300)和面板。 这些桩安装在地面的钻孔(G1)中,并具有H形的壳体槽(110)。 柱的底端插入桩的容纳槽中。 预制基础安装在柱的底部之间。 面板安装在预制基础基础之间的柱之间。
    • 40. 发明公开
    • 옹벽을 이용한 구조물 시공방법
    • 使用预制保留墙结构方法的施工方法
    • KR1020090094986A
    • 2009-09-09
    • KR1020080020025
    • 2008-03-04
    • 안창일
    • 안창일
    • E02D29/02E02D29/045
    • E02D29/025E02D29/0266E02D29/0283E02D29/045
    • A construction method of a structure using a retaining wall is provided to construct a closed conduit structure, U-shaped section structure, and underground road structure in a precast method using a stress reduction type retaining wall. According to a construction method of a structure using a retaining wall, a base plate of a stress reduction type retaining wall is set up to be separated from each other. The wall plate of the stress reduction type retaining wall is installed at both base plates of a wall plate. A bottom plate is assembled and is installed between both base plates in a cast-in-place method or a precast method, or an upper panel integrally manufactured on the top of a retaining wall between both base plates.
    • 提供一种使用挡土墙的结构的施工方法,以采用应力减小型挡土墙的预制方法构造封闭管道结构,U形截面结构和地下道路结构。 根据使用挡土墙的结构的构造方法,设置应力还原型挡土墙的基板彼此分离。 减压型挡土墙的壁板安装在墙板的两个基板上。 底板被组装并且以现浇方式或预制方法安装在两个基板之间,或者在两个基板之间的挡板的顶部上整体制造的上板。